Second Notice | | 9/7/2014 | 9/15/2014 | | DONE |
|
|
|
This permit finaled on the web by Brandon Hammer
|
First Notice | | 7/13/2014 | 8/28/2014 | | DONE |
|
|
|
|
BLD-Final | 7/3/2014 | 7/3/2014 | 7/3/2014 | P | PASS |
Mike Jordan
|
|
|
not need to go out, just need a final pass since zoning signed off on 6/16/14; Brandon Hammer Phone #: ###-####. ok per 316.
|
Permanent Occupancy | | | 7/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 6/16/2014 | 6/16/2014 | 6/16/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 6/5/2014 | 6/6/2014 | 6/6/2014 | A | PEND |
Jim Sly
|
|
|
Dave Phone #: ###-#### Electr on temp. OK for final when Zoning finals.
|
FIRE-Final Inspection | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 6/3/2014 | 6/4/2014 | 6/4/2014 | P | CANC |
Mike Jordan
|
|
|
Dave Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
FIRE-Final Inspection | 5/29/2014 | 5/30/2014 | 5/30/2014 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just the testing of the duct smoke detectors which passed.
|
BLD-Final | 5/27/2014 | 5/28/2014 | 5/28/2014 | P | NR |
Jim Storey
|
|
|
dave Phone #: ###-#### fire c/n no insp.
|
FIRE-Final Inspection | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide building address 4" minimum and contrasting color facing street. Remove the thumbturn lock on the main exit, keyed is ok with an indicator and sticker. Access controled egress doors to meet IFC 1008.1.9.8 (need sensor and request to exit buttons). Provide testing of the new duct smoke detectors.
|
BLD-Ceiling Grid Inspection | 5/12/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Mike Jordan
|
|
|
Early afternoon - Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 4/18/2014 | 4/21/2014 | 4/21/2014 | P | PASS |
Mike Jordan
|
|
|
dave Phone #: ###-####. Interior steel stud framed walls ok.
|
BLD-Framing/Rough-in | 4/15/2014 | 4/16/2014 | 4/16/2014 | A | PASS |
Mike Jordan
|
|
|
robert Phone #: ###-####. Roof framing and and nailing ok.
|
BLD-Conference | 4/11/2014 | 4/14/2014 | 4/14/2014 | A | DONE |
Mike Jordan
|
|
|
robert Phone #: ###-####
|
BLD-Framing/Rough-in | 4/14/2014 | 4/14/2014 | 4/14/2014 | A | PART |
Mike Jordan
|
|
|
robert Phone #: ###-####. Parapet framing and wind girt framing ok. Verified install of H2.5 as they will be covered.
|
BLD-Footing | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PART |
Mike Jordan
|
|
|
Early afternoon please--Dave Phone #: ###-####. Interior column pad footings F1,F2,F3 and F4. Work in progress. Noted that special inspector will be on site.
|
Issue PAID IN FULL permit | | | 1/9/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 12/30/2013 | 12/30/2013 | 1/3/2014 | | PASS |
Craig D. Hanson
|
|
|
.
|
Plan assigned to (CDM) | 12/9/2013 | 12/9/2013 | 1/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/31/2013 | | 1/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 1/3/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 1/3/2014 | | |
|
|
|
|
Telephone call | | | 1/3/2014 | | |
|
|
|
1-3-14 called Robert left message permit ready and fee given ///dld
|
Routing - PLAN CHECK | 12/30/2013 | | 12/30/2013 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 12/27/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked CS, A4, A5, A8, A9, A10, A17, S2.1, S7.1, E2, E3 as well as two sets revised structural calcs and one response letter; Plans taken to Carl Madsen for further review
|
Routing - FIRE | 12/18/2013 | 12/18/2013 | 12/19/2013 | | FAIL |
Craig D. Hanson
|
|
|
Small corrections, see Fire Plan Review
|
1st review completed | | | 12/19/2013 | | FAIL |
|
|
|
Failed, Plan Check, Fire
|
Route to Impact Fee Review | 12/18/2013 | 12/23/2013 | 12/18/2013 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 12/9/2013 | | 12/18/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Plan assigned to (SRZ) | 11/22/2013 | 11/22/2013 | 12/9/2013 | | DEFR |
Sam Zahorka
|
|
|
Deferred to Carl Madsen for Building Review
|
Routing - PLAN CHECK | 11/26/2013 | | 12/9/2013 | | PEND |
Sam Zahorka
|
|
|
Deferred to Carl Madsen for Review
|
Routing - Design Review | 11/25/2013 | | 11/26/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH13-00220
|
Routing - PUBLIC WORKS | 11/22/2013 | | 11/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 11/25/2013 | | 11/25/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. RP for project is certified.
|
Routing PW Sewer Rating | 11/22/2013 | | 11/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 11/21/2013 | | 11/22/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 11/22/2013 | | 11/22/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 11/20/2013 | 11/21/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2013 | | DONE |
Tisha Gallop
|
|
|
|