BLD-Final | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Tom Arcoraci
|
|
|
Zach Phone #: ###-####
|
BLD-Final | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PART |
Jim Storey
|
|
|
zack Phone #: ###-#### cover paper in ceilling for flamespreard/ temp ok
|
FIRE-Final Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 12/27/2013 | 12/30/2013 | 12/30/2013 | P | CANC |
Jim Sly
|
|
|
zach Phone #: ###-#### Need fire final.......
|
FIRE-Final Inspection | 12/27/2013 | 12/30/2013 | 12/30/2013 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final inspection. Fire sprinkler work has not been performed.
|
FIRE-Final Inspection | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a conference for life safety items with zack - call 1/2 hr prior so he can meet you there Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 11/22/2013 | | 11/26/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/22/2013 | | 11/26/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
1st review completed | | | 11/26/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/26/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 11/26/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/26/2013 | | DONE |
Tisha Gallop
|
|
|
called Greg Toolson and left message with Nate that permit is ready, fee due and need GC.
|
Application received | | 11/22/2013 | 11/22/2013 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/22/2013 | | DONE |
Tisha Gallop
|
|
|
|