DOC - Permit Finaled | | | 12/28/2015 | | DONE |
|
|
|
|
BLD-Final | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Tony Young
|
|
|
Joe Prin Phone #: ###-####,,
|
FIRE-Final Inspection | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Final Inspection | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Forrest France
|
|
|
Noted corrections and project related fire sprinkler system modifications are complete.
|
BLD-Final | 3/25/2014 | 3/27/2014 | 3/27/2014 | A | NR |
Tony Young
|
|
|
Joe Prin Phone #: ###-####,, needs fire life safety 1st
|
FIRE-Final Inspection | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | FAIL |
Forrest France
|
|
|
Installation of new doors at the west and south corridors has interupted existing fire sprinkler coverage. Modifications to the fire sprinkler system will be necessary to maintain protection prior to permit final.
|
Issue PAID IN FULL permit | | | 12/9/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 11/25/2013 | 11/25/2013 | 12/3/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/25/2013 | | 12/3/2013 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/3/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/3/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2013 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2013 | | DONE |
Christina Prado
|
|
|
called Joe to advise permit is ready pending GC and gave fees due
|
Permit Ready to Issue | | | 12/3/2013 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/25/2013 | | |
|
|
|
11-25-13 ok per Carl M to take in as a level 2
|
Application received | | 11/25/2013 | | | |
|
|
|
|