BLD-Energy code compliance | 12/23/2013 | 12/26/2013 | 12/26/2013 | P | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|
BLD-Framing/Rough-in | 12/24/2013 | 12/26/2013 | 12/26/2013 | A | PART |
Jim Sly
|
|
|
bill Phone #: ###-#### OK except.....Need HVAC permit and insp..... Need to leave Rock off bathrm ceiling for fan and duct inspection.
|
BLD-Framing/Rough-in | 12/23/2013 | 12/24/2013 | 12/24/2013 | A | FAIL |
Jim Storey
|
|
|
bill Phone #: ###-#### hole in 2ply bottom chord/strap top plate/exterior encapulation/fire blk ceillin/airseal/a35 uplift on trusses
|
BLD-Wall Bracing | 12/17/2013 | 12/18/2013 | 12/18/2013 | A | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|
BLD-Foundation | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 11/29/2013 | 11/29/2013 | 11/29/2013 | P | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|
Application received | | 11/27/2013 | 11/29/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 11/27/2013 | | |
|
|
|
|
OVERRIDE | | | 11/27/2013 | | |
|
|
|
|
OVERRIDE | | | 11/27/2013 | | |
|
|
|
|
OVERRIDE | | | 11/27/2013 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/27/2013 | 11/27/2013 | 11/27/2013 | A | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 11/27/2013 | 11/27/2013 | 11/27/2013 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 11/27/2013 | 11/27/2013 | 11/27/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 11/27/2013 | | |
|
|
|
|
1st review completed | | | 11/27/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/27/2013 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/27/2013 | | DONE |
Tisha Gallop
|
|
|
|