Zoning Approval | 9/11/2015 | 9/11/2015 | 9/11/2015 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 9/11/2015 | | DONE |
|
|
|
|
BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Mike Jordan
|
|
|
Please call with 15 minute lead time. Thank you, Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
FIRE-Final Inspection | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 8/31/2015 | 9/1/2015 | 9/1/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need city approved plans and the one painted pendant, of the two in the furnace room, replaced.
|
BLD-Conference | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | DONE |
Mike Jordan
|
|
|
Preliminary walk through for final. Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler. Needs door hardware installed, life/safety and zoning finals.
|
BLD-Conference | 8/21/2015 | 8/24/2015 | 8/24/2015 | P | CANC |
Mike Jordan
|
|
|
Preliminary meeting before going for building final. Thanks Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Energy code compliance | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Mike Jordan
|
|
|
Added rockwool insulation to all condensate line penetration into floor assembly. Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 3/24/2015 | 3/25/2015 | 3/25/2015 | P | PASS |
Mike Jordan
|
|
|
Three times a charm? Call me when you are heading over. I found 14 holes that needed caulk. Will have caulk gun with me. Thanks Phone #: ###-#### Inspection requested via web by Scott Zierler. All issues resolved. ok to insulate.
|
BLD-Framing/Rough-in | 3/19/2015 | 3/20/2015 | 3/19/2015 | A | CANC |
Mike Jordan
|
|
|
Pat Phone #: ###-####. cancelled per contractor.
|
BLD-Framing/Rough-in | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler. Still noted several penetrations in the floor ceiling assembly that are unprotected. See posted correction notice for locations. Nail off TBE in unit #5.
|
BLD-Framing/Rough-in | 3/16/2015 | 3/17/2015 | 3/17/2015 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler. Noted some areas not firecaulked. Needs to nail off TBE and provide the additional studs for the interior columns on 2nd floor.
|
BLD-Framing/Rough-in | 3/13/2015 | 3/16/2015 | 3/16/2015 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Framing/Rough-in | 3/12/2015 | 3/13/2015 | 3/13/2015 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | P | FAIL |
Mike Jordan
|
|
|
Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete firecaulking, provide adequate support for beams in closet in upstairs unit, Provide TBE on CG2 truss.
|
BLD-Wall Bracing | 12/17/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Mike Jordan
|
|
|
Reinspection Phone #: ###-#### Inspection requested via web by Scott Zierler. All exterior shear ok.
|
BLD-Wall Bracing | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Other | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | PASS |
Mike Jordan
|
|
|
Inspection for separation wall insulation. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Other | 10/29/2014 | 10/29/2014 | 10/29/2014 | P | PASS |
Mike Jordan
|
|
|
Inspection of fire wall insulation prior to cover. At new framed building 715 Mitchell Phone #: ###-#### Inspection requested via web by Scott Zierler. oK to sheetrock party walls and corridor walls.
|
BLD-Conference | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | PART |
Mike Jordan
|
|
|
Floor inspection Phone #: ###-#### Inspection requested via web by Scott Zierler. 1hr. fire partition from footing to underneath side of floor.
|
BLD-Foundation | 6/18/2014 | 6/19/2014 | 6/19/2014 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | PART |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | CANC |
Mike Jordan
|
|
|
Juron Phone #: ###-####
|
OVERRIDE | | | 5/12/2014 | | |
|
|
|
|
Telephone call | | | 5/12/2014 | | DONE |
Barbara Stitt
|
|
|
Called Scott and told him that permit is ready, fees due and need GC info on 5-12-14 @ 8:45am
|
Issue PAID IN FULL permit | | | 5/12/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 5/12/2014 | | DONE |
Barbara Stitt
|
|
|
|
Route to Impact Fee Review | 5/7/2014 | 5/7/2014 | 5/9/2014 | | PASS |
Cindy M. Gould
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/7/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 12/3/2013 | | 5/7/2014 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing Off Site - STRUCTURAL | 4/11/2014 | | 5/6/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Addressing | 5/6/2014 | | 5/6/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Case Summary (BLD) | | | 5/6/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/23/2014 | | 5/6/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/25/2014 | | 5/6/2014 | | PASS |
Carl D Madsen
|
|
|
Received letter from Outsource engineer.
|
Routing - PLANNING | 5/5/2014 | | 5/5/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 4/28/2014 | | 4/30/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC>
|
Routing - MECHANICAL | 2/12/2014 | | 4/28/2014 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 4/25/2014 | 4/25/2014 | 4/25/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 2 04-25-14
|
Plan resubmittals received | | | 4/25/2014 | | |
|
|
|
Received 3 copies of structure calcs from Wolfe Engineering, 6 copies of sheet A-4, A-7, A-8 and 3 copies of sheet A-6, then taken to Carl Madsen's desk
|
Telephone call | | | 4/25/2014 | | DONE |
Christina Prado
|
|
|
Called Action Couriers for pick up
|
Routing - PUBLIC WORKS | 4/22/2014 | | 4/23/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 4/23/2014 | | 4/23/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 4/22/2014 | | 4/22/2014 | | PASS |
Brian Murphy
|
|
|
|
Telephone call | | | 4/11/2014 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 4/8/2014 | | DONE |
|
|
|
rec. 2 copies of full sets of plans, 2 copies of eng calcs and drawings, 5 copies of civil-taken to cdm
|
Routing PW Drainage | 2/18/2014 | | 2/20/2014 | | FAIL |
Brian Murphy
|
|
|
NEED MORE INFO FROM ARCHITECT LEFT MESSAGE
|
Routing PW Sewer Design | 2/14/2014 | | 2/18/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Point of connection to city sewer not show/ not clear. Contacted architect 2/18.
|
Routing - FIRE | 2/12/2014 | 2/12/2014 | 2/13/2014 | | FAIL |
Craig D. Hanson
|
|
|
See attached Fire Plans Review Rev 1 02-13-14
|
Plan resubmittals received | | | 2/3/2014 | | DONE |
Christina Prado
|
|
|
received one response letter, two revised sets of manual Js, two sets of structural calcs as well as two full sets of plans marked C-1, C-2, C-3, A-1. L-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, E-1, E-2, P-1, P-2, P-3, S-1, S-2 & S-3; Taken to Carl Madsen for further review
|
Case Summary (BLD) | | | 1/24/2014 | | DONE |
|
|
|
|
Routing - FIRE | 1/10/2014 | 1/10/2014 | 1/13/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Plan Review Report
|
1st review completed | | | 1/13/2014 | | FAIL |
|
|
|
Failed: Fire, PW, Plan Check, Mechanical, Plumbing, Addressing,
|
Routing - PLAN CHECK | 12/26/2013 | | 1/10/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 12/27/2013 | | |
|
|
|
Received 5 copies of sheet C2 of 2 and taken to add into plans on Carl's desk
|
Routing - PLANNING | 12/24/2013 | | 12/26/2013 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 12/23/2013 | | 12/24/2013 | | FAIL |
Troy James
|
|
|
emailed correction to Prestige homes
|
Routing - PLUMBING | 12/23/2013 | | 12/23/2013 | | FAIL |
Daryl Spivey
|
|
|
1. Provide complete plumbing plan with water sizing and waste and vent piping sized and plumbed as required per ISPC.
2. Provide a DCVA on water service on each address.
|
Routing - Erosion and Sediment | 12/16/2013 | | 12/19/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Valid RP.
|
Routing - PUBLIC WORKS | 12/4/2013 | | 12/16/2013 | | FAIL |
Connie Baumgartner
|
|
|
failed by Brian Murphy for drainage issues and Kyle Rosenmeyer for sewer issues.
|
Routing PW Solid Waste | 12/9/2013 | | 12/9/2013 | | PASS |
Peter J. McCullough
|
|
|
Existing enclosure, service level will need to be increased.
|
Routing PW Sewer Design | 12/4/2013 | | 12/9/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Need to show point of connection to Boise City Sewer.
|
Plan resubmittals received | | | 12/4/2013 | | |
|
|
|
Received 3 sets of structural cals and 6 copies of sheet A-4 and taken to add to routing permit
|
Routing - Addressing | 12/4/2013 | | 12/4/2013 | | FAIL |
Jason C. Taylor
|
|
|
Apartment numbers need to be assigned. Called applicant - messagees not returned. Jason Taylor ###-####
|
Routing PW Sewer Rating | 12/4/2013 | | 12/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 12/3/2013 | | 12/3/2013 | | PASS |
Dave Abo
|
|
|
Lot 2, Block 1 of McMonigle Subdivision
|
Application received | | 12/2/2013 | 12/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 12/2/2013 | | PASS |
Tim L. Woodard
|
|
|
|
First Notice | | 9/21/2015 | | | |
|
|
|
|
Routing PW Drainage | 12/9/2013 | | | | FAIL |
Brian Murphy
|
|
|
NEEDS SAND WINDOW AND OTHER PREVOIUSLY APPROVED DRAINAGE DETAILS
|
Pending Assignment by JCB | 12/2/2013 | | | | |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 2/12/2014 | | | | |
Connie Baumgartner
|
|
|
|