Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-03319
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 715 N MITCHELL ST
Project NameHORIZON PARK APARTMENTS
Customer Number 
ePlanReviewNo
Description
Horizon Park - Eight Unit Apartment Building (1st story Apt. #s 101,102,103,104, second story Apt. #s 201,202,203,204) Permit for the construction of a new 2 story, 8 unit apartment building per the approved plans. The building has 4,800 sq. ft. per story including common areas with 4 apartments on each story. This building is fully fire sprinklered per residential occupancy requirements and shall comply with NFPA13 as regulated by the Fire Department. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval9/11/20159/11/20159/11/2015 PASS
DetailsJosh Wilson
Permanent Occupancy  9/11/2015 DONE
BLD-Final9/9/20159/10/20159/10/2015PPASS
DetailsMike Jordan
Please call with 15 minute lead time. Thank you,
Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
FIRE-Final Inspection9/9/20159/10/20159/10/2015APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/31/20159/1/20159/1/2015PFAIL
DetailsTroy Cobbley
Need city approved plans and the one painted pendant, of the two in the furnace room, replaced.
BLD-Conference8/24/20158/25/20158/25/2015ADONE
DetailsMike Jordan
Preliminary walk through for final. Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler. Needs door hardware installed, life/safety and zoning finals.
BLD-Conference8/21/20158/24/20158/24/2015PCANC
DetailsMike Jordan
Preliminary meeting before going for building final. Thanks Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
BLD-Energy code compliance3/27/20153/27/20153/27/2015PPASS
DetailsMike Jordan
Added rockwool insulation to all condensate line penetration into floor assembly. Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Framing/Rough-in3/24/20153/25/20153/25/2015PPASS
DetailsMike Jordan
Three times a charm? Call me when you are heading over. I found 14 holes that needed caulk. Will have caulk gun with me. Thanks Phone #: ###-#### Inspection requested via web by Scott Zierler. All issues resolved. ok to insulate.
BLD-Framing/Rough-in3/19/20153/20/20153/19/2015ACANC
DetailsMike Jordan
Pat Phone #: ###-####. cancelled per contractor.
BLD-Framing/Rough-in3/18/20153/18/20153/18/2015PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Zierler. Still noted several penetrations in the floor ceiling assembly that are unprotected. See posted correction notice for locations. Nail off TBE in unit #5.
BLD-Framing/Rough-in3/16/20153/17/20153/17/2015PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Zierler. Noted some areas not firecaulked. Needs to nail off TBE and provide the additional studs for the interior columns on 2nd floor.
BLD-Framing/Rough-in3/13/20153/16/20153/16/2015PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
BLD-Framing/Rough-in3/12/20153/13/20153/13/2015PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
BLD-Framing/Rough-in2/24/20152/25/20152/25/2015PFAIL
DetailsMike Jordan
Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete firecaulking, provide adequate support for beams in closet in upstairs unit, Provide TBE on CG2 truss.
BLD-Wall Bracing12/17/201412/18/201412/18/2014PPASS
DetailsMike Jordan
Reinspection Phone #: ###-#### Inspection requested via web by Scott Zierler. All exterior shear ok.
BLD-Wall Bracing12/17/201412/17/201412/17/2014PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Other12/17/201412/17/201412/17/2014PPASS
DetailsMike Jordan
Inspection for separation wall insulation. Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Other10/29/201410/29/201410/29/2014PPASS
DetailsMike Jordan
Inspection of fire wall insulation prior to cover. At new framed building 715 Mitchell Phone #: ###-#### Inspection requested via web by Scott Zierler. oK to sheetrock party walls and corridor walls.
BLD-Conference9/23/20149/24/20149/24/2014APART
DetailsMike Jordan
Floor inspection Phone #: ###-#### Inspection requested via web by Scott Zierler. 1hr. fire partition from footing to underneath side of floor.
BLD-Foundation6/18/20146/19/20146/19/2014PPASS
DetailsMike Jordan
Heron Phone #: ###-####
BLD-Footing6/18/20146/18/20146/18/2014PPART
DetailsMike Jordan
Heron Phone #: ###-####
BLD-Footing5/29/20145/30/20145/30/2014ACANC
DetailsMike Jordan
Juron Phone #: ###-####
OVERRIDE  5/12/2014  
Telephone call  5/12/2014 DONE
DetailsBarbara Stitt
Called Scott and told him that permit is ready, fees due and need GC info on 5-12-14 @ 8:45am
Issue PAID IN FULL permit  5/12/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  5/12/2014 DONE
DetailsBarbara Stitt
Route to Impact Fee Review5/7/20145/7/20145/9/2014 PASS
DetailsCindy M. Gould
PLANS/APPL TAKEN TO FRONT DESK  5/7/2014 DONE
Print Occupancy Form  5/7/2014 DONE
DetailsTisha Gallop
Plan assigned to (CDM)12/3/2013 5/7/2014 PASS
DetailsCarl D Madsen
First review completed
Routing Off Site - STRUCTURAL4/11/2014 5/6/2014 FAIL
DetailsCarl D Madsen
Routing - Addressing5/6/2014 5/6/2014 PASS
DetailsJason C. Taylor
Case Summary (BLD)  5/6/2014 DONE
Routing - PLAN CHECK4/23/2014 5/6/2014 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL4/25/2014 5/6/2014 PASS
DetailsCarl D Madsen
Received letter from Outsource engineer.
Routing - PLANNING5/5/2014 5/5/2014 PASS
DetailsJosh Wilson
Routing - PLUMBING4/28/2014 4/30/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC>
Routing - MECHANICAL2/12/2014 4/28/2014 PASS
DetailsTroy James
Routing - FIRE4/25/20144/25/20144/25/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 2 04-25-14
Plan resubmittals received  4/25/2014  
Received 3 copies of structure calcs from Wolfe Engineering, 6 copies of sheet A-4, A-7, A-8 and 3 copies of sheet A-6, then taken to Carl Madsen's desk
Telephone call  4/25/2014 DONE
DetailsChristina Prado
Called Action Couriers for pick up
Routing - PUBLIC WORKS4/22/2014 4/23/2014 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design4/23/2014 4/23/2014 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage4/22/2014 4/22/2014 PASS
DetailsBrian Murphy
Telephone call  4/11/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Plan resubmittals received  4/8/2014 DONE
rec. 2 copies of full sets of plans, 2 copies of eng calcs and drawings, 5 copies of civil-taken to cdm
Routing PW Drainage2/18/2014 2/20/2014 FAIL
DetailsBrian Murphy
NEED MORE INFO FROM ARCHITECT LEFT MESSAGE
Routing PW Sewer Design2/14/2014 2/18/2014 FAIL
DetailsKyle S. Rosenmeyer
Point of connection to city sewer not show/ not clear. Contacted architect 2/18.
Routing - FIRE2/12/20142/12/20142/13/2014 FAIL
DetailsCraig D. Hanson
See attached Fire Plans Review Rev 1 02-13-14
Plan resubmittals received  2/3/2014 DONE
DetailsChristina Prado
received one response letter, two revised sets of manual Js, two sets of structural calcs as well as two full sets of plans marked C-1, C-2, C-3, A-1. L-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, E-1, E-2, P-1, P-2, P-3, S-1, S-2 & S-3; Taken to Carl Madsen for further review
Case Summary (BLD)  1/24/2014 DONE
Routing - FIRE1/10/20141/10/20141/13/2014 FAIL
DetailsCraig D. Hanson
See Plan Review Report
1st review completed  1/13/2014 FAIL
Failed: Fire, PW, Plan Check, Mechanical, Plumbing, Addressing,
Routing - PLAN CHECK12/26/2013 1/10/2014 FAIL
DetailsCarl D Madsen
Plan resubmittals received  12/27/2013  
Received 5 copies of sheet C2 of 2 and taken to add into plans on Carl's desk
Routing - PLANNING12/24/2013 12/26/2013 PASS
DetailsJosh Wilson
Routing - MECHANICAL12/23/2013 12/24/2013 FAIL
DetailsTroy James
emailed correction to Prestige homes
Routing - PLUMBING12/23/2013 12/23/2013 FAIL
DetailsDaryl Spivey
1. Provide complete plumbing plan with water sizing and waste and vent piping sized and plumbed as required per ISPC.
2. Provide a DCVA on water service on each address.
Routing - Erosion and Sediment12/16/2013 12/19/2013 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Valid RP.
Routing - PUBLIC WORKS12/4/2013 12/16/2013 FAIL
DetailsConnie Baumgartner
failed by Brian Murphy for drainage issues and Kyle Rosenmeyer for sewer issues.
Routing PW Solid Waste12/9/2013 12/9/2013 PASS
DetailsPeter J. McCullough
Existing enclosure, service level will need to be increased.
Routing PW Sewer Design12/4/2013 12/9/2013 FAIL
DetailsKyle S. Rosenmeyer
Need to show point of connection to Boise City Sewer.
Plan resubmittals received  12/4/2013  
Received 3 sets of structural cals and 6 copies of sheet A-4 and taken to add to routing permit
Routing - Addressing12/4/2013 12/4/2013 FAIL
DetailsJason C. Taylor
Apartment numbers need to be assigned. Called applicant - messagees not returned. Jason Taylor ###-####
Routing PW Sewer Rating12/4/2013 12/4/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div12/3/2013 12/3/2013 PASS
DetailsDave Abo
Lot 2, Block 1 of McMonigle Subdivision
Application received 12/2/201312/2/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  12/2/2013 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/2/2013 DONE
DetailsBarbara Stitt
Intake Approval  12/2/2013 PASS
DetailsTim L. Woodard
First Notice 9/21/2015   
Routing PW Drainage12/9/2013   FAIL
DetailsBrian Murphy
NEEDS SAND WINDOW AND OTHER PREVOIUSLY APPROVED DRAINAGE DETAILS
Pending Assignment by JCB12/2/2013    
DetailsJohn Menard
Routing - PUBLIC WORKS2/12/2014    
DetailsConnie Baumgartner