Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03336
StatusIssued
Name CAFCO INC
Site Address 2006 N 14TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**1-23-2014 THIS PROJECT IS MODIFIED TO REFLECT THE PLACEMENT OF 12 L.F. OF INTERIOR PARTITION WALL IN THIS BUILDING TO ALLOW FOR THE INSTALLATION OF A WATER CLOSED AND VANITY SINK AND RELOCATION / ADDITION OF A WINDOW. ( SHOWER OR TUB NOT ALLOWED.) ADDED VALUE TO THE PROJECT IS $1,000.00 1-31-2014 pep*** This project is for the construction of a new 720s.f. 2-car garage with R-1CH approved thrpugh DRH13-00381 By Mathew Halitsky. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  2/18/2014 DONE
DetailsChristina Prado
(F) Reprint permit  2/18/2014 DONE
DetailsChristina Prado
Routing Walk-In (Zoning)1/31/20141/31/20141/31/2014APASS
DetailsMatthew A Halitsky
OK per Sarah Schafer 1-31-2014
Inspection Record Card- Bld  1/31/2014  
Override - Parcel Holds  1/31/2014  
Telephone call  1/31/2014  
1-31-14 called Bill permit ready and fee given ///dld
Routing Walk-In (BLD)1/23/20141/23/20141/24/2014PFAIL
DetailsPerry Paine
back to review status until planning satisfied
CHANGE STATUS TO (REV)  1/24/2014  
Routing Walk-In (Zoning)1/22/20141/22/20141/23/2014PFAIL
DetailsMatthew A Halitsky
Need elevations for modified side (west).
Routing Walk-In (BLD)1/17/20141/17/20141/22/2014ADONE
DetailsPerry Paine
BLD-Wall Bracing1/10/20141/10/20141/10/2014PDONE
DetailsTony Young
Bill Phone #: ###-####
BLD-Wall Bracing1/9/20141/10/20141/10/2014APART
DetailsTony Young
Bill Phone #: ###-####,, looks ok,, but can not get to the plans due to heater set up for the slab area, will check back later
BLD-Wall Bracing1/2/20141/3/20141/3/2014AFAIL
DetailsTony Young
Bill Phone #: ###-####,, correction notice posted,, need plans,, need proper staples for shear,, proper nailing,, etc
OVERRIDE  1/2/2014  
BLD-Footing12/3/201312/3/201312/3/2013PPART
DetailsTony Young
Bill Phone #: ###-####,, 10% done
Routing Walk-In (Zoning)12/2/201312/2/201312/2/2013PDONE
DetailsLeon Letson
Routing Walk-In (BLD)12/2/201312/2/201312/2/2013PDONE
DetailsPerry Paine
Plan assigned to (PEP)12/2/201312/2/201312/2/2013 PASS
DetailsPerry Paine
1st review completed  12/2/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/2/2013  
Issue PAID IN FULL permit  12/2/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  12/2/2013  
Permit Ready to Issue  12/2/2013 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  12/2/2013 DONE
DetailsTisha Gallop
Application received 12/2/2013