Print Statement | | | 10/31/2014 | | DONE |
|
|
|
per his request mailed to Mohammed at Mazzah Meditterranean Grill, PO box 7427, boise 83707
|
Second Notice | | 10/16/2014 | 10/27/2014 | | DONE |
|
|
|
credit given for value pulled on interior demo permit Bld14-00110
|
First Notice | | 8/23/2014 | 10/6/2014 | | DONE |
|
|
|
|
BLD-Final | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | PASS |
Tony Young
|
|
|
Mahmmad Phone #: ###-####,, ok for occupancy
|
Permanent Occupancy | | | 8/13/2014 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | PASS |
Forrest France
|
|
|
Noted correction items verified for completion. Fire life safety finaled.
|
FIRE-Final Inspection | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PART |
Forrest France
|
|
|
|
FIRE-Final Inspection | 7/28/2014 | 7/30/2014 | 7/30/2014 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with scott arellano's permission until: Exit sign at front double door is repaired, ADA hardware for both restrooms, dead bolt removed from rear exit door, occupant load sign posted. Also per discussion with Lee and Scott the single ceiling mounted horn/strobe needs to be removed or additional devices provided. This work does require a permit.
|
Issue PAID IN FULL permit | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/3/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/21/2014 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 5/15/2014 | 6/6/2014 | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 3/19/2014 | 3/19/2014 | 3/19/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 03-19-14
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 3/19/2014 | | 3/19/2014 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 12/5/2013 | | 3/14/2014 | | PASS |
Tim L. Woodard
|
|
|
ePlanReview - Level 3 TI - Mazzah
|
Routing - PLAN CHECK | 2/19/2014 | | 3/14/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 2/19/2014 | | 3/14/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-plan. TLW
|
Routing - MECHANICAL | 3/13/2014 | | 3/13/2014 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 3/13/2014 | | 3/13/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - MECHANICAL | 2/19/2014 | | 2/20/2014 | | FAIL |
Troy James
|
|
|
|
Routing PW Sewer Rating | 2/19/2014 | | 2/20/2014 | | FAIL |
Connie Baumgartner
|
|
|
Complete redesign of kitchen. TLW - Per Tim Woodard, will be resubmitting a new floor plan, will recalulate customer service area then. CLB
|
Routing - PLUMBING | 2/19/2014 | | 2/19/2014 | | PASS |
Daryl Spivey
|
|
|
Complete redesign of kitchen. TLW
Per plan and ISPC. May require additional backflow protection on installed equipment.
|
Routing - PLAN CHECK | 12/5/2013 | | 12/16/2013 | | FAIL |
Tim L. Woodard
|
|
|
Corrections on eplan review as changemarks. TLW
|
Routing - PUBLIC WORKS | 12/5/2013 | | 12/16/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-plan review. TLW
|
1st review completed | | | 12/16/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 12/16/2013 | | DONE |
Tim L. Woodard
|
|
|
Ryan McCane called to let us know the project is on hold and may undergo a redesign for value engineering. TLW
|
Routing - MECHANICAL | 12/5/2013 | | 12/11/2013 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - FIRE | 12/5/2013 | 12/5/2013 | 12/10/2013 | | FAIL |
Scott Arellano
|
|
|
See Fire Plan Review Report
|
Routing - PLUMBING | 12/5/2013 | | 12/10/2013 | | PASS |
Bill VanDegrift
|
|
|
May require additional backflow protection on installed equipment.
|
Routing - Addressing | 12/5/2013 | | 12/6/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Sewer Rating | 12/6/2013 | | 12/6/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 12/5/2013 | | PASS |
Jason Blais
|
|
|
Prescreen approved by John Menard and plan review fees paid.
|
Pending Assignment by JCB | 12/5/2013 | | 12/5/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - Erosion and Sediment | 12/5/2013 | | 12/5/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. RP has been designated.
|
Routing PW Environmental | 12/5/2013 | | 12/5/2013 | | PASS |
Walt Baumgartner
|
|
|
Two Canplas 25 gpm grease traps indicated for relocated scullery area
|
Application received | | | 12/3/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2013 1:25PM
|