Permanent Occupancy | | | 7/27/2016 | | DONE |
|
|
|
|
Telephone call | | | 7/27/2016 | | DONE |
|
|
|
called Pat to let know C of O was sent to her by email-she was off today so asked the lady that answered to let her know
|
Zoning Approval | 7/26/2016 | 7/26/2016 | 7/26/2016 | | PASS |
Josh Wilson
|
|
|
|
Print Occupancy Form | | | 7/26/2016 | | DONE |
|
|
|
|
BLD-Final | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
FIRE-Final Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 9/4/2014 | 9/4/2014 | 9/5/2014 | P | NR |
Dave Hannah
|
|
|
Justin Phone #: ###-#### needs fire life saftey inspection and change door hardwear
|
BLD-Energy code compliance | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Phil Shearer
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PASS |
Mike Jordan
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | PASS |
Mike Jordan
|
|
|
Justin Phone #: ###-####
|
BLD-Conference | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | DONE |
Mike Jordan
|
|
|
Justin Phone #: ###-####
|
BLD-Conference | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Foundation | 5/30/2014 | 6/2/2014 | 6/2/2014 | A | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 5/30/2014 | 5/30/2014 | 5/30/2014 | P | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | NR |
Mike Jordan
|
|
|
Moved to pm.
|
BLD-Footing | 5/29/2014 | 5/29/2014 | 5/29/2014 | P | NR |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/30/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 4/30/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 4/28/2014 | | DONE |
Tisha Gallop
|
|
|
called Justin Elliott, told him received check in mail for permit fees but still need RP, inspection card, erosion sign and sign buiding permit. Justin said he will be in the next couple of days to get permit issued.
|
OVERRIDE | | | 4/18/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 4/18/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JCM) | 1/27/2014 | | 4/14/2014 | | PASS |
John Menard
|
|
|
1st Review Completed 2/3/14
|
Routing - PLAN CHECK | 4/14/2014 | | 4/14/2014 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/4/2014 | | 3/27/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 3/4/2014 | | 3/5/2014 | | PASS |
Daryl Spivey
|
|
|
per plan and ISPC.
|
1st review completed | | | 2/6/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 1/27/2014 | | 2/3/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 1/27/2014 | | 1/30/2014 | | FAIL |
Daryl Spivey
|
|
|
1. Water sizing does not meet code requirements.
2.Show correct drain pipe sizing per ISPC and also venting as required.
3. Plumbing plans are required to be drawn by a Idaho licenced engineer unless on a small TI it is preapproved by the plumbing supervisor that may be drawn by an architect.
4. Plans and plumbing fixture schedule do not show what fixture is being installed on outside wall location.
|
Routing - PLANNING Land Div | 1/27/2014 | | 1/30/2014 | | PASS |
Dave Abo
|
|
|
Lot 2, Block 1 of Elms Park Center Subdivision
|
Routing - FIRE | 1/27/2014 | 1/27/2014 | 1/29/2014 | | PASS |
Scott Arellano
|
|
|
Attached Report
|
Routing PW Sewer Rating | 1/27/2014 | | 1/27/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/27/2014 | | 1/27/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 1/27/2014 | | 1/27/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 1/27/2014 | | 1/27/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 1/27/2014 | | 1/27/2014 | | PASS |
Evan Jenkins
|
|
|
|
Pending Assignment by JCM | 1/27/2014 | | 1/27/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 1/14/2014 | | PASS |
|
|
|
The plan intake checklist was not uploaded. Carl Westfall uploaded a blank plan intake checklist and went through each item. In his opinion, the application was complete enough to apply. The 2 original sheets were deleted because the information on them was contained on the newer revised sheets.
|
Intake Approval | | | 12/9/2013 | | FAIL |
|
|
|
(12-9-13) The plan intake review could not be completed because the application was not complete. Please provide the following:
1) Complete and upload into the Documents Folder the plan intake checklist #520. Make sure all required documentation listed in the checklist is provided.
2) The existing building was constructed in 1976 and the lot was annexed into Boise City in 1999. The Building Division does not have any drawings for this existing building. Upload a copy of the original drawings into the Drawings Folder or create a new dimensioned floor plan of the existing building.
3) Please note that all new restrooms are required to be accessible to the disabled. Although the plan intake review is not intended to identify code violations, the new restroom as designed will not be approved. It is required to be fully accessible to the disabled.
Once the required items have been uploaded and the Architect has completed his task in ePlanReview, the plan intake review can be completed.
|
Application received | | | 12/3/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2013 5:09PM
|