Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-03357
StatusIssued
Name ANDY THOMPSON CONSTRUCTION INC
Site Address 6853 W WINSTON LN
Project Name#1900 6853 Winston
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 1807 sq. ft., two story (first story 1289 sq. ft., second story 518 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 234 sq. ft. of covered patio/porch and a 420 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/29/20144/30/20144/30/2014ANR
DetailsTom Arcoraci
>> Inspection requested via web by Andy Thompson
DOC - Permit Finaled4/30/20144/30/20144/30/2014PPASS
DetailsTom Arcoraci
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Energy code compliance2/18/20142/19/20142/19/2014APASS
DetailsTom Arcoraci
Andy Phone #: ###-####
BLD-Framing/Rough-in2/18/20142/18/20142/18/2014PPASS
DetailsTom Arcoraci
Andy Phone #: ###-####
BLD-Framing/Rough-in2/12/20142/12/20142/12/2014PNR
DetailsTom Arcoraci
Andy Phone #: ###-####
BLD-Wall Bracing1/21/20141/22/20141/22/2014APART
DetailsMike Jordan
Andy Phone #: ###-####. exterior wall bracing ok, except at bay window at front of house. Provide PFH method aS noted on approved plans. Will reinspect this area at framing inspection.
BLD-Foundation1/3/20141/3/20141/3/2014PCANC
DetailsJim Sly
BLD-Foundation1/2/20141/3/20141/3/2014APASS
DetailsJim Sly
SHAWN POUR TIME 11 AM Phone #: ###-####
BLD-Footing12/31/201312/31/201312/31/2013PPASS
DetailsMike Jordan
Andy Phone #: ###-####
Issue PAID IN FULL permit  12/30/2013 DONE
OVERRIDE  12/27/2013  
Plan assigned to (JG)12/11/201312/11/201312/27/2013 PASS
DetailsJavier Guzman
1st review completed, Due 12/23 L1 ePlan **
Routing - PLAN CHECK12/24/2013 12/27/2013 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/27/2013 DONE
Inspection Record Card- Bld  12/27/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  12/27/2013 DONE
DetailsChristina Prado
Routing - PLAN CHECK12/17/2013 12/24/2013 FAIL
DetailsJavier Guzman
ePlan
Route to Impact Fee Review12/11/201312/14/201312/18/2013 PASS
DetailsCindy M. Gould
1st review completed  12/17/2013 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK12/11/2013 12/17/2013 FAIL
DetailsJavier Guzman
ePlan review
Routing - PUBLIC WORKS12/11/2013 12/13/2013 PASS
DetailsConnie Baumgartner
Routing - MECHANICAL12/11/2013 12/12/2013 PASS
DetailsTroy James
Routing - PLANNING12/11/2013 12/11/2013 PASS
DetailsSusan Riggs
Routing - Addressing12/11/2013 12/11/2013 PASS
DetailsEmily Dixon
Plans ACCEPTED BY PLAN TECH  12/11/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/11/2013 DONE
DetailsChristina Prado
Intake Approval  12/10/2013 PASS
DetailsChristina Prado
Application received  12/4/2013 DONE
Application submitted via PDS Online on Dec 4 2013 12:00PM