Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03383
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 10500 W OVERLAND RD
Project NameAlbertsons Exterior Upgrade
Customer Number 
ePlanReviewYes
Description
(ALBERTSONS - EXTERIOR WALL FINISH UPGRADE) Fire sprinklers used for building area increase and for story increase. To remodel the exterior wall finish of an existing retail sales building. Work it to include constructing a new canopy structure with the canopy roof sloping toward the existing flat roof. New exterior finishes will be installed including an Exterior Insulation and Finish System. The work is required to comply with the approved drawings, with the plan review report, with the Structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department including fire sprinkler protection within concealed combustible spaces. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/16/201410/24/2014 DONE
DetailsChristina Prado
completed 10-24-14
First Notice9/29/20149/29/201410/6/2014 DONE
DetailsMike Jordan
mailed 10-7-14
FIRE-Final Inspection9/29/20149/30/20149/30/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Final9/29/20149/29/20149/29/2014PPASS
DetailsMike Jordan
Please call 30min prior for access - Steve Phone #: ###-####
DOC - Permit Finaled9/29/20149/29/20149/29/2014PPASS
DetailsMike Jordan
BLD-Final9/26/20149/29/20149/29/2014ANR
DetailsMike Jordan
Please call 30min prior to meet on site - Steve Phone #: ###-####. Needs zoning final.
Zoning Approval9/29/20149/29/20149/29/2014 DONE
DetailsAndrea Tuning
BLD-Conference6/26/20146/26/20146/26/2014PPASS
DetailsMike Jordan
Steve Phone #: ###-####. Center popout ok.
Plan Reviewer's activity  6/25/2014 PASS
Reviewed deferred submittal for awnings.
BLD-Framing/Rough-in6/19/20146/20/20146/20/2014PPASS
DetailsMike Jordan
Steve-would like a partial inspection and would like at 3:00 Phone #: ###-####. east popuot ok to sheet.
BLD-Framing/Rough-in6/17/20146/18/20146/18/2014APASS
DetailsMike Jordan
Steve Durell Phone #: ###-####. West pop out and middle pop out ok. Will also have engineering scanned in project on minor changes approved by engineer.
Issue PAID IN FULL permit  5/21/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  5/21/2014 DONE
DetailsChristina Prado
OVERRIDE  5/16/2014  
Permit Ready to Issue  5/16/2014 DONE
DetailsBarbara Stitt
Expiration Notice5/12/20146/3/20145/12/2014 DONE
DetailsChristina Prado
Plan assigned to (CJW)12/9/201312/9/20134/4/2014 PASS
DetailsCarl Westfall
ALBERTSONS EXTERIOR WALL FINISH UPGRADE - ePlanReview - Level 3 TI - (20 days - Jan 2)
Routing Off Site - STRUCTURAL4/2/2014 4/4/2014 PASS
(4-2-14) Routed to AHJ for the consultant review.

(4-4-14) Review completed late on a Friday.
Routing - PLAN CHECK4/2/2014 4/4/2014 PASS
DetailsCarl Westfall
(4-2-14) Routed to AHJ for the consultant review.

(4-4-14 Drawings approved
PLANS/APPL TAKEN TO FRONT DESK  4/4/2014 DONE
Plan resubmittals received  4/2/2014 DONE
Routing - PLAN CHECK3/7/2014 3/20/2014 FAIL
DetailsCarl Westfall
Revised drawings submitted late on Friday. Drawings routed on the following Monday.

(3-20-14) 4th structural review completed but not approved.
Routing Off Site - STRUCTURAL3/10/2014 3/20/2014 FAIL
DetailsCarl Westfall
Craig Brasher
Plan resubmittals requested  3/20/2014 DONE
Plan resubmittals received  3/7/2014 DONE
Routing - PLAN CHECK2/21/2014 2/26/2014 FAIL
DetailsCarl Westfall
(2-24-14) Drawings submitted late on a Friday. Routing started on the following Monday.

(2-26-14) Now that a lateral analysis has been provided, further design is required so that code compliance is demonstrated. 3rd structural review failed.
Routing Off Site - STRUCTURAL2/24/2014 2/26/2014 FAIL
DetailsCarl Westfall
(2-24-14) Routed to the Consultant Structural Engineer.

(2-26-14) Now that a lateral analysis has been provided, further design is required so that code compliance is demonstrated.
Plan resubmittals requested  2/26/2014 DONE
Plan resubmittals received  2/21/2014 DONE
Plan resubmittals requested  1/31/2014 DONE
Structural concerns not adequately addressed.
Routing - PLAN CHECK1/24/2014 1/31/2014 FAIL
DetailsCarl Westfall
Waiting for the structural consultant to finish his 2nd review.

2nd review failed
Routing Off Site - STRUCTURAL1/27/2014 1/30/2014 FAIL
Details
Items not addressed
Plan resubmittals received  1/24/2014 DONE
1st review completed  12/18/2013 DONE
Plan resubmittals requested  12/18/2013 DONE
Routing - PLAN CHECK12/9/2013 12/18/2013 FAIL
DetailsCarl Westfall
Revised drawings required.
Routing Off Site - STRUCTURAL12/9/2013 12/16/2013 FAIL
Craig Brasher
Routing - FIRE12/9/201312/9/201312/12/2013 PASS
DetailsScott Arellano
Routing PW Drainage12/9/2013 12/10/2013 PASS
DetailsBrian Murphy
Pending Assignment by JCB12/9/2013 12/9/2013 DONE
DetailsJason Blais
Routing - PUBLIC WORKS12/9/2013 12/9/2013 PASS
DetailsBeverly Mountain
Routing - Addressing12/9/2013 12/9/2013 PASS
DetailsEmily Dixon
Routing - Erosion and Sediment12/9/2013 12/9/2013 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Applicant needs to designate RP for ESC permit to be issued.
Routing - Design Review12/9/2013 12/9/2013 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH13-00358
Application received  12/6/2013 DONE
Application submitted via PDS Online on Dec 6 2013 10:28AM
CHANGE STATUS TO (PND)  12/6/2013 DONE
Accidentally voided
Intake Approval  12/6/2013 PASS
DetailsJason Blais
Prescreen passed by Tim Woodard and plan review fees paid.