Second Notice | | 3/20/2016 | 3/18/2016 | | DONE |
Christina Prado
|
|
|
No required - grading only
|
First Notice | 3/1/2016 | 3/1/2016 | 3/10/2016 | | DONE |
Candy A. Nichols
|
|
|
mailed 3-11-16
|
BLD-Aging Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/1/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Thomas Walsh
|
|
|
Final sign off of grading permit by Fire. FS U/G permit also signed off.
|
Inspection Record Card- Bld | | | 6/17/2015 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 6/11/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Thomas Walsh
|
|
|
Need to confirm FS UG supply hydrotest and flush has been witnessed by this office prior to finaling grading permit.
|
BLD-Other | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
This inspection request is to final this permit including - Erosion, Electrical, Life Safety, Plumbing, and Public Works. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Final | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 7/30/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Jim Storey
|
|
|
Rebar Reinforcement inspection for the Podium planters. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Other | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | CANC |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 1/6/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 12/31/2013 | | |
|
|
|
|
Routing - PUBLIC WORKS | 12/30/2013 | | 12/31/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Elevation Cert Rec'd-Prelim | | | 12/31/2013 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/31/2013 | | 12/31/2013 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 12/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 12/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Flood Plain | 12/31/2013 | | 12/31/2013 | | PASS |
Jim Wyllie
|
|
|
|
Telephone call | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
Called and left message for Ian giving fees due and advising GC & Rp are need prior to issuance
|
Permit Ready to Issue | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (LEG) Tisha | 12/6/2013 | | 12/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 12/19/2013 | | 12/30/2013 | | PEND |
Tisha Gallop
|
|
|
awaiting resubs/additional info for Flood Plain and Sewer Design.
|
Routing - PUBLIC WORKS | 12/30/2013 | | 12/30/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Jim Wylie and Kyle Rosenmeyer
|
Routing PW Sewer Design | 12/30/2013 | | 12/30/2013 | | PASS |
Mike Sheppard
|
|
|
Trim sewer main in manhole
|
Plan resubmittals received | | | 12/27/2013 | | DONE |
Christina Prado
|
|
|
Received three sests of revised plan sheets marked C2.3;inserted into plan set and taken to Public Works for approval
|
Routing PW Drainage | 12/19/2013 | | 12/19/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 12/17/2013 | | 12/19/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Connect 10" into manhole. Re-core manhole and repair T-Lock liner as needed. Contact Boise Public Works prior to construction and obtain Tap Permit.
|
Routing - PUBLIC WORKS | 12/16/2013 | | 12/19/2013 | | FAIL |
Beverly Mountain
|
|
|
Failed by Jim Wylie for drainage issues.
|
Routing PW Flood Plain | 12/16/2013 | | 12/17/2013 | | FAIL |
Jim Wyllie
|
|
|
An Elevation Certificate is required prior to approval. Jim Wyllie (###-####)
|
Routing - FIRE | 12/13/2013 | | 12/16/2013 | | PASS |
Craig D. Hanson
|
|
|
Passed as submited with addition of hydrant. No Fire Plan Review report enclosed.
|
Routing - PLAN CHECK | 12/16/2013 | | 12/16/2013 | | PEND |
Tisha Gallop
|
|
|
called Michael Simmons and told him approval pending resubs for grading/drainage.
|
Plan resubmittals received | | | 12/16/2013 | | DONE |
Tisha Gallop
|
|
|
received five copies of plan sheets C2.1, C2.2, C2.3, C2.4, C2.5; inserted by permit tech and reroued to PW.
|
Routing - Design Review | 12/12/2013 | | 12/13/2013 | | PASS |
Andrea Tuning
|
|
|
DRH13-204 Andrea Tuning
|
Routing - PLUMBING | 12/11/2013 | | 12/12/2013 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PUBLIC WORKS | | | 12/11/2013 | | FAIL |
Beverly Mountain
|
|
|
Failed by drainage
|
Routing - Erosion and Sediment | 12/11/2013 | | 12/11/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative approved. Need to designate RP in order to receive ESC permit.
|
Routing PW Flood Plain | 12/9/2013 | | 12/11/2013 | | FAIL |
Jim Wyllie
|
|
|
NEEDS CACLS AND MORE G. W. INFO
|
Application received | | 12/6/2013 | 12/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING Land Div | 12/9/2013 | | 12/9/2013 | | PASS |
Dave Abo
|
|
|
For drainage only.
|
Routing - Addressing | 12/9/2013 | | 12/9/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2013 | | DONE |
Tisha Gallop
|
|
|
|