Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03410
StatusFinaled
Name SYRINGA CONSTRUCTION LLC
Site Address 2428 N 25TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3005 sq. ft., two story (first story 1560 sq. ft., second story 1445 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately 431 sq. ft. of covered patio/porch and a 993 sq. ft. detached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/30/20147/1/20147/1/2014APASS
DetailsTony Young
Access key in weather proof outlet on back patio. Thx kim Phone #: ###-#### >> Inspection requested via web by Kim Winkle
DOC - Permit Finaled7/1/20147/1/20147/1/2014PPASS
DetailsTony Young
c of o issued
BLD-Final6/27/20146/30/20146/30/2014ACANC
DetailsTony Young
Access key should be in weather proof outlet on back patio. Thx kim Phone #: ###-#### >> Inspection requested via web by Kim Winkle Inspection cancelled from web by: Kim Winkle
BLD-Final6/26/20146/26/20146/26/2014PFAIL
DetailsTony Young
Key to access house is in the weather proof outlet on back patio. Call me if there is any issues getting in. Thx Kim Phone #: ###-#### >> Inspection requested via web by Kim Winkle,, c/n posted,, need temp glass master bath,, hand rails,, stair rise openings,, debris in crawl
BLD-Framing/Rough-in4/11/20144/11/20144/11/2014APASS
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Lucas Christian
BLD-Energy code compliance4/11/20144/11/20144/11/2014APASS
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Lucas Christian
BLD-Framing/Rough-in4/7/20144/8/20144/8/2014PPART
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Lucas Christian// c/n posted,, ok to insulate,, need truss eng, fire block chase, etc.. written on plans
BLD-Wall Bracing3/25/20143/25/20143/25/2014PPASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Lucas Christian,, exterior ok
BLD-Foundation2/25/20142/26/20142/26/2014PPART
DetailsTony Young
Phone #: ###-####,, done
BLD-Footing2/25/20142/25/20142/25/2014PPART
DetailsTony Young
Phone #: ###-####,, work in progress
Issue PAID IN FULL permit  2/24/2014 DONE
DetailsChristina Prado
OVERRIDE  2/21/2014  
Plan assigned to (JG) 12/11/20132/21/2014 PASS
DetailsJavier Guzman
1st review completed, Due 12/24 L1 **
Application received 12/10/20132/21/2014 DONE
Routing - PLAN CHECK2/19/2014 2/21/2014 PASS
DetailsJavier Guzman
Telephone call  2/21/2014 DONE
DetailsTisha Gallop
called Steve and mailbox was full so sent e-mail to address on application that permit is ready and fee due.
Case Summary (BLD)  2/21/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/21/2014 DONE
Inspection Record Card- Bld  2/21/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  2/21/2014 DONE
DetailsTisha Gallop
Routing - MECHANICAL2/20/2014 2/20/2014 PASS
DetailsTroy James
Routing - Design Review2/19/2014 2/19/2014 PASS
DetailsJosh Wilson
OK per resubmittals dated February 14, 2014.
Plan resubmittals received  2/14/2014  
2-14-14 received 2 new sets of plans and1 Load Short Form(MJ) taken to Javier
Routing - Design Review2/11/2014 2/11/2014 FAIL
DetailsJosh Wilson
Substandard lot application approved, however- the shower on the second floor of the garage is not allowed without approval for an Accessory Dwelling Unit (ADU).
Plan resubmittals received  2/7/2014 DONE
DetailsChristina Prado
Received two revised full sets of plans marked 1,2,3,4,5,6,7,8, garage 1, 2, 3, 4 as well as two revised ste plans and one revised manual J; Plans taken to Javier for further review
1st review completed  12/20/2013 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK12/18/2013 12/20/2013 FAIL
DetailsJavier Guzman
emailed plan review report to applicant
Route to Impact Fee Review12/11/201312/14/201312/18/2013 PASS
DetailsCindy M. Gould
Routing - MECHANICAL12/16/2013 12/18/2013 PASS
DetailsTroy James
Routing - Design Review12/12/2013 12/16/2013 FAIL
DetailsAndrea Tuning
Requires a Design Review Approval due to the fact that it is a substandard lot.
Routing - PLANNING12/12/2013 12/12/2013 FAIL
DetailsLeon Letson
Needs DR Approval for Substandard Lots
Routing - Addressing12/11/2013 12/12/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS  12/12/2013 PASS
Plans ACCEPTED BY PLAN TECH  12/11/2013 DONE
DetailsChristina Prado
Intake Approval  12/11/2013 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/11/2013 DONE
DetailsChristina Prado
Intake Approval  12/10/2013 FAIL
DetailsTisha Gallop
need wall bracing for second floor of dwelling and detached garage.