BLD-Final | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PASS |
Tony Young
|
|
|
Access key in weather proof outlet on back patio. Thx kim Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 6/27/2014 | 6/30/2014 | 6/30/2014 | A | CANC |
Tony Young
|
|
|
Access key should be in weather proof outlet on back patio. Thx kim Phone #: ###-#### >> Inspection requested via web by Kim Winkle Inspection cancelled from web by: Kim Winkle
|
BLD-Final | 6/26/2014 | 6/26/2014 | 6/26/2014 | P | FAIL |
Tony Young
|
|
|
Key to access house is in the weather proof outlet on back patio. Call me if there is any issues getting in. Thx Kim Phone #: ###-#### >> Inspection requested via web by Kim Winkle,, c/n posted,, need temp glass master bath,, hand rails,, stair rise openings,, debris in crawl
|
BLD-Framing/Rough-in | 4/11/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian
|
BLD-Energy code compliance | 4/11/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian
|
BLD-Framing/Rough-in | 4/7/2014 | 4/8/2014 | 4/8/2014 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian// c/n posted,, ok to insulate,, need truss eng, fire block chase, etc.. written on plans
|
BLD-Wall Bracing | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian,, exterior ok
|
BLD-Foundation | 2/25/2014 | 2/26/2014 | 2/26/2014 | P | PART |
Tony Young
|
|
|
Phone #: ###-####,, done
|
BLD-Footing | 2/25/2014 | 2/25/2014 | 2/25/2014 | P | PART |
Tony Young
|
|
|
Phone #: ###-####,, work in progress
|
Issue PAID IN FULL permit | | | 2/24/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/21/2014 | | |
|
|
|
|
Plan assigned to (JG) | | 12/11/2013 | 2/21/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 12/24 L1 **
|
Application received | | 12/10/2013 | 2/21/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/19/2014 | | 2/21/2014 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 2/21/2014 | | DONE |
Tisha Gallop
|
|
|
called Steve and mailbox was full so sent e-mail to address on application that permit is ready and fee due.
|
Case Summary (BLD) | | | 2/21/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/21/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 2/20/2014 | | 2/20/2014 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 2/19/2014 | | 2/19/2014 | | PASS |
Josh Wilson
|
|
|
OK per resubmittals dated February 14, 2014.
|
Plan resubmittals received | | | 2/14/2014 | | |
|
|
|
2-14-14 received 2 new sets of plans and1 Load Short Form(MJ) taken to Javier
|
Routing - Design Review | 2/11/2014 | | 2/11/2014 | | FAIL |
Josh Wilson
|
|
|
Substandard lot application approved, however- the shower on the second floor of the garage is not allowed without approval for an Accessory Dwelling Unit (ADU).
|
Plan resubmittals received | | | 2/7/2014 | | DONE |
Christina Prado
|
|
|
Received two revised full sets of plans marked 1,2,3,4,5,6,7,8, garage 1, 2, 3, 4 as well as two revised ste plans and one revised manual J; Plans taken to Javier for further review
|
1st review completed | | | 12/20/2013 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/18/2013 | | 12/20/2013 | | FAIL |
Javier Guzman
|
|
|
emailed plan review report to applicant
|
Route to Impact Fee Review | 12/11/2013 | 12/14/2013 | 12/18/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 12/16/2013 | | 12/18/2013 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 12/12/2013 | | 12/16/2013 | | FAIL |
Andrea Tuning
|
|
|
Requires a Design Review Approval due to the fact that it is a substandard lot.
|
Routing - PLANNING | 12/12/2013 | | 12/12/2013 | | FAIL |
Leon Letson
|
|
|
Needs DR Approval for Substandard Lots
|
Routing - Addressing | 12/11/2013 | | 12/12/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | | | 12/12/2013 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/11/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/11/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/11/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/10/2013 | | FAIL |
Tisha Gallop
|
|
|
need wall bracing for second floor of dwelling and detached garage.
|