BLD-Final | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | DONE |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Contractor supplied ICC-ES report for the square edge styrofoam insulation in the crawl space. Per the ICC-ES report an ignition barrier is not required.
|
BLD-Final | 6/26/2015 | 6/29/2015 | 6/29/2015 | P | NR |
Mike Jordan
|
|
|
James Phone #: ###-####. Needs blower door test, door from garage to dwelling to be self closing. Also noted rigid foam insulation on perimeter stemwalls that may require a thermal barrier, contractor to get data.
|
BLD-Wall cover | 3/30/2015 | 3/30/2015 | 3/30/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | PASS |
Phil Shearer
|
|
|
Before 2 - James Phone #: ###-####
|
BLD-Foundation | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Mike Jordan
|
|
|
cal Phone #: ###-####
|
BLD-Footing | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PART |
Mike Jordan
|
|
|
cal Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/30/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 1/27/2014 | | |
|
|
|
|
Route to Impact Fee Review | 1/24/2014 | 1/29/2014 | 1/27/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 12/10/2013 | 1/27/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/27/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 1/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 1/27/2014 | | DONE |
Tisha Gallop
|
|
|
called James Cupps and left vm permit is ready, fee due and need to verify RP
|
Plan assigned to (JG) | | 12/19/2013 | 1/24/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Due 1/01 L1 *
|
Routing - PLAN CHECK | 1/8/2014 | | 1/24/2014 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 1/24/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/21/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked sheet 3, 6, foundation, elevations, floor, roof & sections, as well as two sets revised structural calcs; Taken to Javier for further review
|
Routing - PLAN CHECK | 12/26/2013 | | 1/8/2014 | | FAIL |
Javier Guzman
|
|
|
1-7-2014 emailed applicant, need resubmittals of item # 1 and #5 in plan review report
|
Plan resubmittals received | | | 1/6/2014 | | DONE |
Tisha Gallop
|
|
|
received two copies of PFH detail on 8 1/2" x 11" sheet, SIP wall info (14 pages), full size foundation plan and full size plan sheet SIP wall details (14 sheets); taken to Javier
|
1st review completed | | | 12/26/2013 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/24/2013 | | 12/26/2013 | | FAIL |
Javier Guzman
|
|
|
12-26-2013 emailed plan review report to applicant
|
Routing - MECHANICAL | 12/23/2013 | | 12/24/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/23/2013 | | 12/23/2013 | | PASS |
Cody Riddle
|
|
|
A min. 15' setback is required along the western and southern propoerty lines. The bay window must meet this requirement.
|
Routing - PUBLIC WORKS | 12/20/2013 | | 12/23/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/19/2013 | | 12/20/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/19/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/19/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/19/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/10/2013 | | FAIL |
Christina Prado
|
|
|
Needs Manual J, fixtures shown on plans, bollard & floor joists displayed for length of structure. Wall Bracing isn't req'd as is part of SIP panel details per Javier.
|