Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03415
StatusIssued
Name RUSSELL CONSTRUCTION
Site Address 5500 S FEDERAL WAY
Project NameORE PAC
Customer Number 
ePlanReviewNo
Description
(ORE/PAC – 3 hr wall upgrade & Core restrooms) Permit to remodel an existing 64,600 square foot office / warehouse / manufacturing building. This building is sprinklered for unlimited area building provisions. Scope of work includes: modify existing walls to include a 3 hr assembly for the length of the adjacent building located closer than 60 ft., construction of interior non-bearing walls to create two new core restrooms, installation of new plumbing, installation of exhaust fans, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20142/19/20142/19/2014PPART
DetailsJim Storey
restroom ok to occuppy 3 hr wall only complet on inside. exterior and doors not complet.
FIRE-Final Inspection2/18/20142/18/20142/18/2014PPASS
DetailsForrest France
Fire life safety inspection completed acceptable.
BLD-Framing/Rough-in1/28/20141/29/20141/29/2014APASS
DetailsTom Arcoraci
Ken St. John Phone #: ###-#### bath rooms ok
BLD-Other1/16/20141/16/20141/16/2014PPASS
DetailsJim Storey
screw insp on drywall // Ken Phone #: ###-####
BLD-Framing/Rough-in1/9/20141/10/20141/10/2014PPASS
DetailsJim Storey
Kent Phone #: ###-####
Issue PAID IN FULL permit  1/7/2014 DONE
DetailsChristina Prado
Plan assigned to (TLW)12/11/2013 12/20/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK12/12/2013 12/20/2013 PASS
DetailsTim L. Woodard
Approved with comments. Tim Woodard
1st review completed  12/20/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/20/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/20/2013 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  12/20/2013 DONE
DetailsTisha Gallop
Telephone call  12/20/2013 DONE
DetailsChristina Prado
called Rocky to advise permit is ready pending GC and gave fees due
Permit Ready to Issue  12/20/2013 DONE
DetailsChristina Prado
Routing - PUBLIC WORKS12/11/2013 12/12/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing12/12/2013 12/12/2013 PASS
DetailsEmily Dixon
Application received 12/11/201312/11/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  12/11/2013 DONE
DetailsBarbara Stitt
Intake Approval  12/11/2013 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  12/11/2013 DONE
DetailsBarbara Stitt