BLD-Other | 2/14/2018 | 2/15/2018 | 2/16/2018 | P | NR |
Dave Hannah
|
|
|
Railing and Guardrail Inspection on Main Street Stairs and Patios. Prior to tearing down fence. Phone #: ###-#### Inspection requested via web by Anna Ellis
|
BLD-Final | 6/25/2015 | 6/25/2015 | 7/2/2015 | P | PEND |
Dave Hannah
|
|
|
Dennis Phone #: ###-#### needs a final letter on all spec inspections
|
CHANGE STATUS TO (ISS) | | | 6/25/2015 | | DONE |
|
|
|
permit has NOT been finaled yet
|
FIRE-Final Inspection | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Jim Page
|
|
|
Life fire safety inspection, HR, Annex passed/complete
|
BLD-Final | 3/31/2015 | 4/1/2015 | 4/2/2015 | A | PEND |
Dave Hannah
|
|
|
Bruce Phone #: ###-####ok to occ the I T area print shop
|
FIRE-Final Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PART |
Forrest France
|
|
|
Fire life safety walkthrough completed for the print office 147A, IT 151, flex office 153, HR office 154/155, IT work area and hall 170/171. Hardware at the HR office revised while on site, hardware at the print shop to storage area/restroom vestibules to be corrected as discussed.
|
BLD-Ceiling Grid Inspection | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Forrest France
|
|
|
Preliminary walkthrough of the cafeteria area and adjacent corridor regarding fire life safety items. Cafe area EM lights and exit signs tested okay. Discussed locations of exit signs at the corridor.
|
BLD-Framing/Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Dave Hannah
|
|
|
###-####-IT room
|
BLD-Ceiling Grid Inspection | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Bob Archibald
|
|
|
Cafateria - 1st thing please - Bruce Phone #: ###-####
|
BLD-Final | 1/21/2015 | 1/23/2015 | 1/23/2015 | A | PEND |
Dave Hannah
|
|
|
bruce Phone #: ###-#### ok to move into hr area
|
FIRE-Final Inspection | 1/21/2015 | 1/23/2015 | 1/23/2015 | A | PART |
Forrest France
|
|
|
Completed fire life safety walkthrough of the HR dept. remodel area first floor- 6th street exit access and egress path to be maintained available as discussed.
|
BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### kitchen area by front door ok after elec oks
|
BLD-Conference | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | DONE |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/7/2015 | 1/9/2015 | 1/9/2015 | A | PART |
Dave Hannah
|
|
|
Dennis-print shop and HR dept-call to meet for inspection Phone #: ###-#### ok to cover hr area after other trades ok
|
BLD-Conference | 12/22/2014 | 12/23/2014 | 12/23/2014 | A | PASS |
Dave Hannah
|
|
|
bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Dave Hannah
|
|
|
Bruce-CH2 basement east side, CH@ 4th floor east side, Annex print shop Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2014 | 11/12/2014 | 11/13/2014 | P | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok to insulate nw section ext walls and cover int walls
|
Fees Due Hold | 10/15/2014 | | 11/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/14/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Ceiling Grid Inspection | 10/8/2014 | 10/9/2014 | 10/10/2014 | A | PASS |
Dave Hannah
|
|
|
CH2 4th lobby - Bruce Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 9/24/2014 | | 10/8/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/24/2014 | | 10/8/2014 | | PASS |
Tim L. Woodard
|
|
|
Plan Mod to redo HR space.TLW
|
Routing - FIRE | 9/24/2014 | 9/24/2014 | 10/2/2014 | | PASS |
Craig D. Hanson
|
|
|
No report for plan Mod
|
Routing - MECHANICAL | 9/24/2014 | | 9/30/2014 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/24/2014 | 9/27/2014 | 9/26/2014 | | PASS |
Cindy M. Gould
|
|
|
|
BLD-Framing/Rough-in | 9/22/2014 | 9/23/2014 | 9/24/2014 | P | PASS |
Dave Hannah
|
|
|
CH2 - 3rd fl - Bruce Phone #: ###-####
|
Routing - PLANNING | 9/24/2014 | | 9/24/2014 | | PASS |
Andrea Tuning
|
|
|
|
Plan Modification Accepted | | | 9/24/2014 | | |
|
|
|
Plan Mod to redo HR space.
|
BLD-Ceiling Grid Inspection | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PASS |
Dave Hannah
|
|
|
2nd fl lobby - Bruce Phone #: ###-####
|
Plan Modification Accepted | | | 8/28/2014 | | DONE |
|
|
|
started plan mod workflow for misc modifications to HR dept.
|
BLD-Framing/Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Dave Hannah
|
|
|
ch 2, 2nd floor lobby Phone #: ###-####
|
FIRE-Conference | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PART |
Forrest France
|
|
|
Inspection for verification of adjusted fire sprinkler coverage at the first floor office 103 completed.
|
BLD-Conference | 7/29/2014 | 7/30/2014 | 7/31/2014 | A | PART |
Dave Hannah
|
|
|
Conference for Phased finals at basement and 1st floor CH2 at west side Phone #: ###-#### phase one these areas are ok
|
FIRE-Final Inspection | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | PART |
Forrest France
|
|
|
Phase one work at the basement level west side CH2 elevator lobby sheet A100 okayed. Phase one 1st floor west side CH2 sheet A110 hall, lobby, and office okay with the exception of overspaced fire sprinkler coverage at office 103 due to relocated walls.
|
BLD-Final | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | NR |
Jim Storey
|
|
|
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PART |
Forrest France
|
|
|
Regarding completion of work at the basement level.
|
BLD-Framing/Rough-in | 7/1/2014 | 7/2/2014 | 7/2/2014 | P | DONE |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### Framing approved for cover @ art annex area on main floor.
|
BLD-Footing | 6/20/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Dave Hannah
|
|
|
Bruce (10AM) Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Dave Hannah
|
|
|
bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/18/2014 | 6/19/2014 | 6/19/2014 | P | FAIL |
Dave Hannah
|
|
|
bruce - basement lobby CH2 Phone #: ###-####
|
Inspection Record Card- Bld | | | 4/9/2014 | | |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/9/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 4/9/2014 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2014 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 3/18/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 12/20/2013 | | 3/18/2014 | | PASS |
Tim L. Woodard
|
|
|
Level 3 TI - ePlanReview - Boise City Hall Phase 2
|
Routing PW Street Lights | 3/7/2014 | | 3/12/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-plan Review. TLW
|
Routing - PLAN CHECK | 2/5/2014 | | 2/21/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved as resubmitted. TLW
|
Routing - FIRE | 2/5/2014 | | 2/18/2014 | | PASS |
Craig D. Hanson
|
|
|
See attached report
|
Routing Off Site - STRUCTURAL | 2/5/2014 | | 2/14/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved by Outsource Structural Reviewer. TLW
|
Routing PW Street Lights | 2/5/2014 | | 2/6/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Plan resubmittals received | | | 2/5/2014 | | DONE |
Tim L. Woodard
|
|
|
Resubmittals recieved via: E-Plan Review. TLW
|
Routing - PLANNING | 2/5/2014 | | 2/5/2014 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 12/20/2013 | 12/20/2013 | 1/8/2014 | | FAIL |
Craig D. Hanson
|
|
|
Items on Building Review needs corrected
|
Routing Off Site - STRUCTURAL | 12/20/2013 | | 1/8/2014 | | FAIL |
Tim L. Woodard
|
|
|
Re-review required. TLW
|
Routing - PUBLIC WORKS | 12/20/2013 | | 1/8/2014 | | FAIL |
Connie Baumgartner
|
|
|
Failed
|
Routing - PLAN CHECK | 12/20/2013 | | 1/8/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to Change Marks on drawings. TLW
|
1st review completed | | | 1/8/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 12/20/2013 | | 12/27/2013 | | PASS |
Bill VanDegrift
|
|
|
1. Irrigation lines to be protected by approved backflow.
2. 2 inch horizontal roof drain leaders approved because existing roof drains meet required area drain requirements.
|
Routing - MECHANICAL | 12/20/2013 | | 12/23/2013 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 12/20/2013 | | 12/23/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 12/20/2013 | | 12/23/2013 | | FAIL |
Andrea Tuning
|
|
|
Andrea Tuning - DRH13-00382
The applicant has not complied with the Type 1 Urban Brick Streetscape standard. The applicant should install a 5'4" furnishing zone or a 6' funishing zone as opposed to the 4'8" furnishing zone that has been proposed.
|
Routing - PLANNING Land Div | 12/20/2013 | | 12/23/2013 | | PASS |
Dave Abo
|
|
|
Existing building approved under prior permit.
|
Routing - Erosion and Sediment | 12/20/2013 | | 12/23/2013 | | PASS |
Evan Jenkins
|
|
|
|
Pending Assignment by JCB | 12/20/2013 | | 12/20/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 12/19/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
|
Intake Approval | | | 12/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1. Please provide the stamping area on the plans per the electronic submittal standards. The cover sheet meets the requirement. There are several additional drawings that need the 4 inch by 2 inch space located 3 inches off the right sheet edge for the City of Boise approval stamp.
The electronic submittal sheet is located at:
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
If you need further assistance please let me know.
2. Please provide the ESC plans. There is a check list in documents with not drawings in the drawing file.
3. Please upload the approval letter from planning and zoning.
|
Intake Approval | | | 12/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1. Please provide the stamping area on the plans per the electronic submittal standards. The cover sheet meets the requirement. There are several additional drawings that need the 4 inch by 2 inch space located 3 inches off the right sheet edge for the City of Boise approval stamp.
The electronic submittal sheet is located at:
http://pds.cityofboise.org/media/105041/electronicstandards.pdf
If you need further assistance please let me know.
|
Application received | | | 12/12/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2013 1:59PM
|