Permit Information
Permit NumberBLD13-03418
StatusIssued
Name CM COMPANY
Site Address 150 N CAPITOL BLVD
Project NameBOISE CITY HALL
Customer Number 
ePlanReviewYes
Description
(BOISE CITY HALL – Phase II Code Improvements) The main scope of work within this permit is to upgrade the existing parking garage, Annex and CH2 to make them more seismically resistant. PLAN MODIFICATION 10-8-12 – Modification submitted to reconfigure the HR Dept. area. The area will now be mostly all open office without walls dividing the space into individual office. **TLW** A tenant improvement for a portion of the HR Dept in the Annex is also included within this scope of work. Work is to include: [structural upgrades including: new concrete sheer walls, new collectors, repair concrete beams, and concrete deck repair], [construction of interior non-bearing walls to create eight private offices, a conference room, and a copy room], exterior site improvements, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other2/14/20182/15/20182/16/2018PNR
DetailsDave Hannah
Railing and Guardrail Inspection on Main Street Stairs and Patios. Prior to tearing down fence. Phone #: ###-#### Inspection requested via web by Anna Ellis
BLD-Final6/25/20156/25/20157/2/2015PPEND
DetailsDave Hannah
Dennis Phone #: ###-#### needs a final letter on all spec inspections
CHANGE STATUS TO (ISS)  6/25/2015 DONE
permit has NOT been finaled yet
FIRE-Final Inspection6/24/20156/24/20156/24/2015PPASS
DetailsJim Page
Life fire safety inspection, HR, Annex passed/complete
BLD-Final3/31/20154/1/20154/2/2015APEND
DetailsDave Hannah
Bruce Phone #: ###-####ok to occ the I T area print shop
FIRE-Final Inspection3/31/20154/1/20154/1/2015APART
DetailsForrest France
Fire life safety walkthrough completed for the print office 147A, IT 151, flex office 153, HR office 154/155, IT work area and hall 170/171. Hardware at the HR office revised while on site, hardware at the print shop to storage area/restroom vestibules to be corrected as discussed.
BLD-Ceiling Grid Inspection3/17/20153/18/20153/18/2015APASS
DetailsDave Hannah
Phone #: ###-####
FIRE-Final Inspection2/18/20152/19/20152/19/2015APART
DetailsForrest France
Preliminary walkthrough of the cafeteria area and adjacent corridor regarding fire life safety items. Cafe area EM lights and exit signs tested okay. Discussed locations of exit signs at the corridor.
BLD-Framing/Rough-in2/18/20152/19/20152/19/2015APASS
DetailsDave Hannah
###-####-IT room
BLD-Ceiling Grid Inspection2/13/20152/17/20152/17/2015APASS
DetailsBob Archibald
Cafateria - 1st thing please - Bruce Phone #: ###-####
BLD-Final1/21/20151/23/20151/23/2015APEND
DetailsDave Hannah
bruce Phone #: ###-#### ok to move into hr area
FIRE-Final Inspection1/21/20151/23/20151/23/2015APART
DetailsForrest France
Completed fire life safety walkthrough of the HR dept. remodel area first floor- 6th street exit access and egress path to be maintained available as discussed.
BLD-Framing/Rough-in1/14/20151/15/20151/15/2015APART
DetailsDave Hannah
Bruce Phone #: ###-#### kitchen area by front door ok after elec oks
BLD-Conference1/14/20151/15/20151/15/2015ADONE
DetailsDave Hannah
Bruce Phone #: ###-####
BLD-Ceiling Grid Inspection1/7/20151/9/20151/9/2015APART
DetailsDave Hannah
Dennis-print shop and HR dept-call to meet for inspection Phone #: ###-#### ok to cover hr area after other trades ok
BLD-Conference12/22/201412/23/201412/23/2014APASS
DetailsDave Hannah
bruce Phone #: ###-####
BLD-Framing/Rough-in12/12/201412/15/201412/15/2014APASS
DetailsDave Hannah
Bruce-CH2 basement east side, CH@ 4th floor east side, Annex print shop Phone #: ###-####
BLD-Framing/Rough-in11/12/201411/12/201411/13/2014PPART
DetailsDave Hannah
Bruce Phone #: ###-#### ok to insulate nw section ext walls and cover int walls
Fees Due Hold10/15/2014 11/12/2014 DONE
DetailsCandy A. Nichols
CHANGE STATUS TO (ISS)  10/14/2014 DONE
DetailsChristina Prado
BLD-Ceiling Grid Inspection10/8/201410/9/201410/10/2014APASS
DetailsDave Hannah
CH2 4th lobby - Bruce Phone #: ###-####
PLANS/APPL TAKEN TO FRONT DESK  10/8/2014 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)9/24/2014 10/8/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK9/24/2014 10/8/2014 PASS
DetailsTim L. Woodard
Plan Mod to redo HR space.TLW
Routing - FIRE9/24/20149/24/201410/2/2014 PASS
DetailsCraig D. Hanson
No report for plan Mod
Routing - MECHANICAL9/24/2014 9/30/2014 PASS
DetailsTroy James
Route to Impact Fee Review9/24/20149/27/20149/26/2014 PASS
DetailsCindy M. Gould
BLD-Framing/Rough-in9/22/20149/23/20149/24/2014PPASS
DetailsDave Hannah
CH2 - 3rd fl - Bruce Phone #: ###-####
Routing - PLANNING9/24/2014 9/24/2014 PASS
DetailsAndrea Tuning
Plan Modification Accepted  9/24/2014  
Plan Mod to redo HR space.
BLD-Ceiling Grid Inspection8/28/20148/29/20148/29/2014APASS
DetailsDave Hannah
2nd fl lobby - Bruce Phone #: ###-####
Plan Modification Accepted  8/28/2014 DONE
started plan mod workflow for misc modifications to HR dept.
BLD-Framing/Rough-in8/22/20148/25/20148/25/2014APASS
DetailsDave Hannah
ch 2, 2nd floor lobby Phone #: ###-####
FIRE-Conference8/5/20148/5/20148/5/2014PPART
DetailsForrest France
Inspection for verification of adjusted fire sprinkler coverage at the first floor office 103 completed.
BLD-Conference7/29/20147/30/20147/31/2014APART
DetailsDave Hannah
Conference for Phased finals at basement and 1st floor CH2 at west side Phone #: ###-#### phase one these areas are ok
FIRE-Final Inspection7/29/20147/30/20147/30/2014APART
DetailsForrest France
Phase one work at the basement level west side CH2 elevator lobby sheet A100 okayed. Phase one 1st floor west side CH2 sheet A110 hall, lobby, and office okay with the exception of overspaced fire sprinkler coverage at office 103 due to relocated walls.
BLD-Final7/21/20147/22/20147/22/2014ANR
DetailsJim Storey
Bruce Phone #: ###-####
FIRE-Final Inspection7/21/20147/22/20147/22/2014APART
DetailsForrest France
Regarding completion of work at the basement level.
BLD-Framing/Rough-in7/1/20147/2/20147/2/2014PDONE
DetailsDave Hannah
Bruce Phone #: ###-#### Framing approved for cover @ art annex area on main floor.
BLD-Footing6/20/20146/23/20146/23/2014APASS
DetailsDave Hannah
Bruce (10AM) Phone #: ###-####
BLD-Ceiling Grid Inspection6/19/20146/20/20146/20/2014APASS
DetailsDave Hannah
bruce Phone #: ###-####
BLD-Ceiling Grid Inspection6/18/20146/19/20146/19/2014PFAIL
DetailsDave Hannah
bruce - basement lobby CH2 Phone #: ###-####
Inspection Record Card- Bld  4/9/2014  
DetailsTisha Gallop
Permit Ready to Issue  4/9/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  4/9/2014 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  3/25/2014 DONE
DetailsTim L. Woodard
1st review completed  3/18/2014 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)12/20/2013 3/18/2014 PASS
DetailsTim L. Woodard
Level 3 TI - ePlanReview - Boise City Hall Phase 2
Routing PW Street Lights3/7/2014 3/12/2014 PASS
DetailsTim L. Woodard
Approved in E-plan Review. TLW
Routing - PLAN CHECK2/5/2014 2/21/2014 PASS
DetailsTim L. Woodard
Approved as resubmitted. TLW
Routing - FIRE2/5/2014 2/18/2014 PASS
DetailsCraig D. Hanson
See attached report
Routing Off Site - STRUCTURAL2/5/2014 2/14/2014 PASS
DetailsTim L. Woodard
Approved by Outsource Structural Reviewer. TLW
Routing PW Street Lights2/5/2014 2/6/2014 FAIL
DetailsMike D Hedge
Plan resubmittals received  2/5/2014 DONE
DetailsTim L. Woodard
Resubmittals recieved via: E-Plan Review. TLW
Routing - PLANNING2/5/2014 2/5/2014 PASS
DetailsAndrea Tuning
Routing - FIRE12/20/201312/20/20131/8/2014 FAIL
DetailsCraig D. Hanson
Items on Building Review needs corrected
Routing Off Site - STRUCTURAL12/20/2013 1/8/2014 FAIL
DetailsTim L. Woodard
Re-review required. TLW
Routing - PUBLIC WORKS12/20/2013 1/8/2014 FAIL
DetailsConnie Baumgartner
Failed
Routing - PLAN CHECK12/20/2013 1/8/2014 FAIL
DetailsTim L. Woodard
Refer to Change Marks on drawings. TLW
1st review completed  1/8/2014 DONE
DetailsTim L. Woodard
Routing - PLUMBING12/20/2013 12/27/2013 PASS
DetailsBill VanDegrift
1. Irrigation lines to be protected by approved backflow.
2. 2 inch horizontal roof drain leaders approved because existing roof drains meet required area drain requirements.
Routing - MECHANICAL12/20/2013 12/23/2013 PASS
DetailsTroy James
Routing - Addressing12/20/2013 12/23/2013 PASS
DetailsEmily Dixon
Routing - Design Review12/20/2013 12/23/2013 FAIL
DetailsAndrea Tuning
Andrea Tuning - DRH13-00382
The applicant has not complied with the Type 1 Urban Brick Streetscape standard. The applicant should install a 5'4" furnishing zone or a 6' funishing zone as opposed to the 4'8" furnishing zone that has been proposed.
Routing - PLANNING Land Div12/20/2013 12/23/2013 PASS
DetailsDave Abo
Existing building approved under prior permit.
Routing - Erosion and Sediment12/20/2013 12/23/2013 PASS
DetailsEvan Jenkins
Pending Assignment by JCB12/20/2013 12/20/2013 DONE
DetailsJason Blais
Intake Approval  12/19/2013 PASS
DetailsJason Blais
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
Intake Approval  12/18/2013 FAIL
DetailsAdele J Schaffeld-Griffin
1. Please provide the stamping area on the plans per the electronic submittal standards. The cover sheet meets the requirement. There are several additional drawings that need the 4 inch by 2 inch space located 3 inches off the right sheet edge for the City of Boise approval stamp.

The electronic submittal sheet is located at:

http://pds.cityofboise.org/media/105041/electronicstandards.pdf

If you need further assistance please let me know.

2. Please provide the ESC plans. There is a check list in documents with not drawings in the drawing file.

3. Please upload the approval letter from planning and zoning.
Intake Approval  12/18/2013 FAIL
DetailsAdele J Schaffeld-Griffin
1. Please provide the stamping area on the plans per the electronic submittal standards. The cover sheet meets the requirement. There are several additional drawings that need the 4 inch by 2 inch space located 3 inches off the right sheet edge for the City of Boise approval stamp.

The electronic submittal sheet is located at:

http://pds.cityofboise.org/media/105041/electronicstandards.pdf

If you need further assistance please let me know.
Application received  12/12/2013 DONE
Application submitted via PDS Online on Dec 12 2013 1:59PM