DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 9/8/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
BLD-Final | 9/3/2014 | 9/5/2014 | 9/8/2014 | A | NR |
Dave Hannah
|
|
|
burr - call prior Phone #: ###-####
|
BLD-Final | 9/5/2014 | 9/5/2014 | 9/5/2014 | P | NR |
Dave Hannah
|
|
|
burr - call prior Phone #: ###-####
|
FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
Zoning Approval | 9/4/2014 | 9/4/2014 | 9/4/2014 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Final | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | NR |
Tony Young
|
|
|
Burr-please call to meet Phone #: ###-####,, walk through,, need achd, f/l/s,, zoning,, grab bar,, hardware
|
Case Summary (BLD) | | | 7/10/2014 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 | A | PART |
Tom Arcoraci
|
|
|
jeff Phone #: ###-#### needs eng letter for steel beam in basement and supports
|
BLD-Other | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | PASS |
Tony Young
|
|
|
rebar - pat Phone #: ###-####,, remainder of regular foundation wall, minus the blockouts
|
BLD-Other | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Tom Arcoraci
|
|
|
steel framing // Joe Walker Phone #: ###-####
|
BLD-Footing | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | PASS |
Tony Young
|
|
|
jeff - around 12 please Phone #: ###-####,, storage basement footings ok
|
BLD-Footing | 2/24/2014 | 2/25/2014 | 2/25/2014 | A | CANC |
Tony Young
|
|
|
late AM - nathan Phone #: ###-#### - need special insp first
|
(F) Reprint permit | | | 2/6/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/6/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/5/2014 | | |
|
|
|
|
Plan assigned to (CDM) | 1/30/2014 | 1/30/2014 | 2/5/2014 | | PASS |
Carl D Madsen
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 2/4/2014 | | 2/5/2014 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 2/5/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A1.1; Plans inserted by arch rep and taken to Carl madsen for further review
|
Case Summary (BLD) | | | 2/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/5/2014 | | DONE |
Christina Prado
|
|
|
called Steven to advise permit is ready for pick up and gave fees due
|
Routing - PLANNING | 2/3/2014 | | 2/4/2014 | | PASS |
Matthew A Halitsky
|
|
|
Zoning review for DR and parking waived per Sarah Schafer and Hal Simmons.
|
Routing - PLAN CHECK | 1/30/2014 | | 2/3/2014 | | FAIL |
Carl D Madsen
|
|
|
Plan Mod
Talked to Shawn at Trout Architects and he will resubmitt plans shifting the stairs to accomodate a handrail on both sides of the stairs. 2-3-13 CDM
|
Plan Modification Accepted | | | 1/30/2014 | | |
|
|
|
Plan Modification excepted for BLD13-03428 for the redesign of sheets A1.1,S0.01,S0.02,S1.01,S3.01,S3.02,S3.51,S3.52 sent to Carl Madsen for review.
|
Permit Ready to Issue | | | 1/21/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/21/2014 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/13/2013 | 12/13/2013 | 1/17/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/30/2013 | | 1/17/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 1/15/2014 | | 1/17/2014 | | PASS |
Carl D Madsen
|
|
|
1-15-14 called Action Couriers for pick up
Received letter from engineer indicating that all items of the previous review have been addressed. 1-17-14 CDM
|
Case Summary (BLD) | | | 1/17/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 1/17/2014 | | |
|
|
|
1-17-14 called Steve Trout permit ready and fee given ///dld
|
Plan resubmittals received | | | 1/15/2014 | | |
|
|
|
1-15-14 received 2 transmittal letters, 2 review comments & 3 copies of sheets S0.01,S0.02,S1.01,S3.01,S3.02,S3.51, S3.52 inserted by Brad Dunbar.
|
Routing - PLANNING | 12/30/2013 | | 12/30/2013 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing - PLAN CHECK | 12/26/2013 | | 12/26/2013 | | FAIL |
Carl D Madsen
|
|
|
Carl Madsen
|
Routing - PLUMBING | 12/23/2013 | | 12/26/2013 | | PASS |
Daryl Spivey
|
|
|
Install plumbing per ISPC.
|
1st review completed | | | 12/26/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Erosion and Sediment | 12/19/2013 | | 12/23/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative are approved. Contractor needs to designate valid RP prior to permit issuance.
|
Plan resubmittals received | | | 12/23/2013 | | DONE |
Tisha Gallop
|
|
|
received response, photo of existing house, four copies of plan sheets A0.1, A2.0; inserted by arch. rep. and taken back to Erosion.
|
Routing - PUBLIC WORKS | | | 12/19/2013 | | PASS |
|
|
|
|
Routing PW Drainage | 12/17/2013 | | 12/19/2013 | | PASS |
Brian Murphy
|
|
|
|
Telephone call | | | 12/18/2013 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 12/17/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of Form #310. Arch rep also replaced drawing index on plan sheets; plans returned to Drainage to continue review
|
Routing - Addressing | 12/16/2013 | | 12/17/2013 | | PASS |
Emily Dixon
|
|
|
|
Routing - Addressing | 12/17/2013 | | 12/17/2013 | | PASS |
Emily Dixon
|
|
|
|
Plan resubmittals received | | | 12/17/2013 | | DONE |
Tisha Gallop
|
|
|
received five copies of plan sheet A0.1, four copies of A1.3, S0.01, S0.02, S1.01, S3.01, S3.02, S3.51, S3.52, two copies of drainage report and two coipes of structural calcs; inserted into plans by permit tech. Extra structural copies taken to Carl Madsen.
|
Routing PW Sewer Rating | 12/17/2013 | | 12/17/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 12/16/2013 | | 12/16/2013 | | FAIL |
Matthew A Halitsky
|
|
|
DR not approved nor appeal period expired.
|
Routing - PLANNING Land Div | 12/16/2013 | | 12/16/2013 | | PASS |
Dave Abo
|
|
|
Existing parcel with existing building.
|
Override - Parcel Holds | | | 12/16/2013 | | |
|
|
|
|
Application received | | | 12/13/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 13 2013 12:21PM
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing Off Site - STRUCTURAL | 12/18/2013 | | | | FAIL |
Carl D Madsen
|
|
|
Received comments and E-Mailed to Steve Trout. 12-31-13
|