Permit NumberBLD13-03429
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 2240 S COLE RD Unit: 120
Project NameSCOUT TECHNOLOGY
Customer Number 
ePlanReviewNo
Description
(SCOUT TECHNOLOGY)(SUITE 120) This permit is to change the occupancy for the warehouse space 3,151 sq ft from and S1 to an F1 occupancy. The existing office 1,212 sq ft portion will remain. The tenant space demising wall between suite 130 and 120 was built under BLD13-03236. There is no proposed construction as part of this permit. Applicant shall meet with the electrical inspector to review listings requirements for equipment. This building is fully sprinklered for area increase; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA #13 as regulated by the fire department. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/20/20143/3/2014 DONE
DetailsChristina Prado
501 value to get permit only - no need for final numbers
Permanent Occupancy  2/10/2014 DONE
DetailsBarbara Stitt
BLD-Final2/6/20142/7/20142/7/2014APASS
DetailsTom Arcoraci
Brian or Scott Johnson at ###-#### Phone #: ###-####
FIRE-Final Inspection2/6/20142/7/20142/7/2014APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection2/6/20142/6/20142/6/2014PFAIL
DetailsTroy Cobbley
Provide exit sign over door as per the approved plans.
Issue PAID IN FULL permit  2/4/2014 DONE
DetailsChristina Prado
Application received 12/13/20131/8/2014 DONE
Plan assigned to (AJS)12/13/201312/13/20131/8/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 1/9Level 3 TI - Scout Technology
PLANS/APPL TAKEN TO FRONT DESK  1/8/2014 DONE
Print Occupancy Form  1/8/2014 DONE
Permit Ready to Issue  1/8/2014 DONE
DetailsTisha Gallop
Telephone call  1/8/2014 DONE
DetailsTisha Gallop
called Glenn Walker and left vm in general mailbox permit is ready, fee due and need GC.
Routing - FIRE1/7/20141/7/20141/7/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Report Rev 1 01-07-14
Routing - PLAN CHECK12/17/2013 1/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  1/7/2014 PASS
Pass
Case Summary (BLD)  1/7/2014 DONE
DetailsAdele J Schaffeld-Griffin
Routing PW Environmental12/16/2013 12/16/2013 PASS
DetailsWalt Baumgartner
OK, existing machine shop inspected by Pretreatment staff
Routing PW Sewer Rating12/16/2013 12/16/2013 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  12/13/2013 DONE
DetailsChristina Prado
Intake Approval  12/13/2013 PASS
DetailsSam Zahorka
Recd Pcfee & Taken To Pln CK  12/13/2013 DONE
DetailsChristina Prado
Pending Assignment by JCB12/13/2013    
DetailsJason Blais