BLD-Final | 4/4/2014 | 4/7/2014 | 4/7/2014 | A | PASS |
Jim Storey
|
|
|
MIke Phone #: ###-####
|
DOC - Permit Finaled | 4/7/2014 | 4/7/2014 | 4/7/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | FAIL |
Jim Storey
|
|
|
Mike Phone #: ###-#### c/n posted gyp under stair/ handrail returns top bottom/ cover insulation in storage to meet listing.
|
BLD-Framing/Rough-in | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2014 | 2/24/2014 | 2/24/2014 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### double 2x east roof support/ need sg at landing will verify at final.
|
BLD-Framing/Rough-in | 2/4/2014 | 2/4/2014 | 2/5/2014 | P | PART |
Jim Storey
|
|
|
late pm please// Mike Phone #: ###-####
|
BLD-Wall Bracing | 2/4/2014 | 2/4/2014 | 2/4/2014 | P | PASS |
Jim Storey
|
|
|
late pm please// Mike Phone #: ###-####
|
Routing Walk-In (BLD) | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Perry Paine
|
|
|
question
|
PubWorks Subgrade Approval | 1/2/2014 | 1/2/2014 | 1/2/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Conference | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PART |
Jim Storey
|
|
|
Phone #: 2085851145 >> Inspection requested via mobile web by Luke Tucker ok pending pw sign off
|
OVERRIDE | | | 12/19/2013 | | |
|
|
|
|
Routing Walk-In (PW Hillside) | 12/18/2013 | 12/18/2013 | 12/19/2013 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Inspection Record Card- Bld | | | 12/19/2013 | | |
|
|
|
|
Routing - PLAN CHECK | 12/18/2013 | | 12/19/2013 | | PASS |
Perry Paine
|
|
|
ESC waiver included is plan submittal...
|
Routing - PLAN CHECK | 12/18/2013 | | 12/19/2013 | | PASS |
Perry Paine
|
|
|
Duplicate routing entry - please disregard. AJL
|
Issue PAID IN FULL permit | | | 12/19/2013 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2013 | | DONE |
|
|
|
|
Telephone call | | | 12/19/2013 | | DONE |
Christina Prado
|
|
|
Called Mike to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 12/19/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 12/13/2013 | | 12/18/2013 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted 12/16. Waiver approved, ESC permit conditions still apply
|
Routing Walk-In (Zoning) | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | FAIL |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 12/13/2013 | 12/13/2013 | 12/13/2013 | | FAIL |
Perry Paine
|
|
|
|
1st review completed | | | 12/13/2013 | | DONE |
|
|
|
|
Application received | | 12/13/2013 | | | |
|
|
|
|