Permit Information
Permit NumberBLD13-03433
StatusFinaled
Name IDAHO HOME AND ENERGY
Site Address 3 S MESA VISTA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of a 676s.f. garage with 308s.f. of storage above that is accessed by a code complying stair. R-1C ok per Leon Letson. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. All per the approved plans as marked ESC Plan Waiver Conditions, and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20144/7/20144/7/2014APASS
DetailsJim Storey
MIke Phone #: ###-####
DOC - Permit Finaled4/7/20144/7/20144/7/2014PPASS
DetailsJim Storey
BLD-Final3/27/20143/27/20143/27/2014PFAIL
DetailsJim Storey
Mike Phone #: ###-#### c/n posted gyp under stair/ handrail returns top bottom/ cover insulation in storage to meet listing.
BLD-Framing/Rough-in2/26/20142/26/20142/26/2014PPASS
DetailsJim Storey
Mike Phone #: ###-####
BLD-Framing/Rough-in2/24/20142/24/20142/24/2014PPART
DetailsJim Storey
Mike Phone #: ###-#### double 2x east roof support/ need sg at landing will verify at final.
BLD-Framing/Rough-in2/4/20142/4/20142/5/2014PPART
DetailsJim Storey
late pm please// Mike Phone #: ###-####
BLD-Wall Bracing2/4/20142/4/20142/4/2014PPASS
DetailsJim Storey
late pm please// Mike Phone #: ###-####
Routing Walk-In (BLD)1/27/20141/27/20141/27/2014PPASS
DetailsPerry Paine
question
PubWorks Subgrade Approval1/2/20141/2/20141/2/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Conference12/30/201312/30/201312/30/2013PPART
DetailsJim Storey
Phone #: 2085851145 >> Inspection requested via mobile web by Luke Tucker ok pending pw sign off
OVERRIDE  12/19/2013  
Routing Walk-In (PW Hillside)12/18/201312/18/201312/19/2013PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Inspection Record Card- Bld  12/19/2013  
Routing - PLAN CHECK12/18/2013 12/19/2013 PASS
DetailsPerry Paine
ESC waiver included is plan submittal...
Routing - PLAN CHECK12/18/2013 12/19/2013 PASS
DetailsPerry Paine
Duplicate routing entry - please disregard. AJL
Issue PAID IN FULL permit  12/19/2013 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  12/19/2013 DONE
Telephone call  12/19/2013 DONE
DetailsChristina Prado
Called Mike to advise permit is ready for pick up and gave fees due
Permit Ready to Issue  12/19/2013 DONE
DetailsChristina Prado
Routing - Erosion and Sediment12/13/2013 12/18/2013 PASS
DetailsAndy J. Long
ESC plan waiver submitted 12/16. Waiver approved, ESC permit conditions still apply
Routing Walk-In (Zoning)12/13/201312/13/201312/13/2013PDONE
DetailsLeon Letson
Routing Walk-In (BLD)12/13/201312/13/201312/13/2013PFAIL
DetailsPerry Paine
Plan assigned to (PEP)12/13/201312/13/201312/13/2013 FAIL
DetailsPerry Paine
1st review completed  12/13/2013 DONE
Application received 12/13/2013