Permit Information
Permit NumberBLD13-03495
StatusFinaled
Name R. Mark Lockwood
Site Address 8073 W EMERALD ST
Project NameSanFrancisco Sourdough Eatery
Customer Number 
ePlanReviewYes
Description
(SAN FRANCISCO SOURDOUGH EATERY)This permit is to renovate previous Maggie Moo;s BLD02-02030 to new quick Service restaurant, featuring deli-style sourdough-bread sandwiches, bread bowls, soups, pizza and salads. Scope of work to include demolition per approved plans. Exterior renovation per approved plans and zoning certificate. Interior will include all new finishes per floor plan. Existing ADA compliant restrooms will remain with cosmetic upgrades. Note this building is fully fire sprinklered for area increase, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/16/20147/9/2014 DONE
mailed to Mark Lockwood
Second Notice 5/5/20146/11/2014 DONE
DetailsBarbara Stitt
bad address and phone #; send to tenant/applican Mark Lockwood
Mailed 6-11-14
First Notice 4/10/20144/25/2014 DONE
DetailsChristina Prado
BLD-Final3/31/20143/31/20143/31/2014PPASS
DetailsMike Jordan
Between 2-4 if possible please--Stacy Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  3/31/2014 DONE
DetailsChristina Prado
BLD-Final3/27/20143/28/20143/28/2014PNR
DetailsMike Jordan
stacy Phone #: ###-####. Needs mech. final first.
FIRE-Final Inspection3/28/20143/28/20143/28/2014PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection3/27/20143/28/20143/28/2014AFAIL
DetailsTroy Cobbley
Repair the FACP, tag and mount the fire extinguisher and provide emergency lighting at the rear exit.
Zoning Approval3/28/20143/28/20143/28/2014 DONE
DetailsSarah Schafer
BLD-Framing/Rough-in3/7/20143/7/20143/7/2014PPASS
DetailsMike Jordan
Stacy Between 2-3 if possible please Phone #: ###-####
Print Occupancy Form  1/31/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  1/31/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  1/29/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)12/31/201312/31/20131/27/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 1/13 San Francisco Sourdough eatery
Routing - MECHANICAL1/27/2014 1/27/2014 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  1/27/2014 DONE
Routing - MECHANICAL1/23/2014 1/23/2014 FAIL
DetailsTroy James
notes on eplan
Routing - PLAN CHECK1/16/2014 1/17/2014 PASS
DetailsAdele J Schaffeld-Griffin
need plumbing review and mechanical corrections
Routing - MECHANICAL1/16/2014 1/17/2014 FAIL
DetailsTroy James
eplan, need type 2 hood over convection oven
Routing - PLUMBING1/16/2014 1/17/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Plan Reviewer's activity  1/17/2014 DONE
DetailsAdele J Schaffeld-Griffin
emailed Mark 1/17/14

Mark,

I received the revised plans for BLD13-03495 yesterday 1/16/14 and routed them to;

The PW Environmental reviewer and Walt has approved the permit.

The plumbing review will have to be completed prior to issuing the permit and as of now it has not been completed.

The mechanical review has been completed and the review failed. A type 2 hood is required by the mechanical plan reviewer over the free standing convection oven.

The building plan review has been completed with no additional comments. I will not be able issue the permit until all departments have approved the permit.

Plumbing and mechanical did not review the original submittal as the required plans were not submitted with the package for this food handling establishment.

If you have any questions please feel free to contact me.

Thank you


Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####

Routing PW Environmental1/16/2014 1/16/2014 PASS
DetailsWalt Baumgartner
Applicant has indicated TI will connect to existing on site grease interceptor installed w/ original shell & core project in 2000.
Plans approved
Routing PW Solid Waste12/31/2013 1/9/2014 PASS
DetailsPeter J. McCullough
signed off in eplan
1st review completed  1/9/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK12/31/2013 1/9/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan
Routing PW Sewer Rating12/31/2013 1/9/2014 PASS
DetailsConnie Baumgartner
signed off in e plan
Routing PW Environmental12/31/2013 1/3/2014 FAIL
DetailsWalt Baumgartner
Routing - Addressing12/31/2013 12/31/2013 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS12/31/2013 12/31/2013 PASS
DetailsBeverly Mountain
Routing - Design Review12/31/2013 12/31/2013 PASS
DetailsSarah Schafer
Approved per CZC13-00282 issued 12-31-13.
Intake Approval  12/31/2013 PASS
DetailsAdele J Schaffeld-Griffin
ok to take in by Sara Schafer
Intake Approval  12/26/2013 FAIL
DetailsAdele J Schaffeld-Griffin
A Zoning Certificate is required for the changes being made to the exterior of the building. Please contact Sara Schafer at ###-#### if you have any questions. Once you have the zoning certificate please upload it into the documents folder and resubmit the pre screen.

Thank you
Application received  12/19/2013 DONE
Application submitted via PDS Online on Dec 19 2013 3:46PM