(GUERDON ENTERPRISES - Storage Building - Existing) - To permit an 2,985 square foot, one story, tensile fabric storage building and related site improvements. This building is used for storage of building materials and was previously constructed without a building permit or inspections. This building is going to be recovered with a new fire retardant membrane material. All previous construction to be inspected to verify compliance with applicable codes and approved construction documents. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/15/20176/12/2017 DONE
Mailed 6-13-17
Third Notice 4/18/20175/10/2017 DONE
Mailed 5-11
Second Notice 4/21/20174/13/2017 DONE
DetailsChristina Prado
First Notice 2/11/20173/9/2017 DONE
Print Occupancy Form  2/1/2017 DONE
Print Occupancy Form  2/1/2017 DONE
Permanent Occupancy  2/1/2017 DONE
BLD-Final1/30/20171/31/20171/31/2017APASS
DetailsJim Storey
Greg Phone #: ###-#### no card
FIRE-Final Inspection1/27/20171/30/20171/30/2017APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are going to mounted in discussed locations. Final life fire safety nispection passed/complete.
PubWorks Occupancy Approval1/30/20171/30/20171/30/2017 DONE
DetailsTiffany Lowery
BLD-Conference1/17/20171/18/20171/18/2017ADONE
DetailsMike Jordan
Greg-please call with a meet for access Phone #: ###-####. Spoke with Greg.He needs a fire/life/safety final and public works final prior to building final.
BLD-Conference11/18/201611/21/201611/21/2016PDONE
DetailsJim Storey
Case has been reopened per BO. Issue notice to obtain all required final inspections. c/n to complet insp.
CHANGE STATUS TO (ISS)  11/18/2016 DONE
Reopened per building official
BLD-Aging Inspection1/6/20161/6/20161/6/2016 FAIL
DetailsJim Storey
expaired no insp requsted
BLD-Aging Inspection1/5/20161/5/20161/6/2016 PEND
DetailsJim Storey
no insp/expired
DOC - Permit Expired1/6/20161/6/20161/6/2016PPASS
DetailsJim Storey
no insp. requisted
CHANGE STATUS TO (ISS)  3/10/2015 DONE
Routing - PLAN CHECK3/6/2015 3/9/2015 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  3/9/2015 DONE
DetailsJohn Menard
Permit Ready to Issue  3/9/2015 DONE
DON'T reissue- no fees due per John Menard
Telephone call  3/9/2015 DONE
called Troy- told him permit is ready for pick up- no fees due
Plan assigned to (JCM)3/2/2015 3/9/2015 PASS
DetailsJohn Menard
Plan Modification
Routing - FIRE3/2/2015 3/6/2015 PASS
DetailsScott Arellano
Approved. No change to previous comments.
Plan Modification Accepted  3/2/2015  
Two copies of application and sheets A-1. Taken to John M.
Permit Ready to Issue  2/20/2015 DONE
Issue PAID IN FULL permit  2/20/2015 DONE
Print Occupancy Form  1/22/2015 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  1/22/2015 DONE
Telephone call  1/22/2015 DONE
DetailsCandy A. Nichols
called Troy to let know permit is ready-still need RP, GC, ACHD & rev cert of val then we can figure the fees due
Plan assigned to (JCM)12/20/2013 1/21/2015 PASS
DetailsJohn Menard
1st Review Complete 01/10/2014
Routing - FIRE1/15/2015 1/21/2015 PASS
DetailsScott Arellano
Attached plan review report to plans. Approved with red line annotations on Plan Sheet A-1.
Routing - PLAN CHECK1/21/2015 1/21/2015 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  1/21/2015 DONE
DetailsJohn Menard
Telephone call  1/20/2015 DONE
DetailsScott Arellano
Spoke with Greg (Guerdon Homes). We discussed the concept of providing a fire department man access gate (man gate) at the east portion of the property in order to provide access to the existing fire hydrant along Pan Am Ave. This wil be acceptable in regards to satisfying the required fire hydrant access Pan Am would qualify as an acceptable Fire Department Vehicle access roadway relative to the primary structure.
Routing - PLAN CHECK12/3/2014 1/15/2015  
DetailsJohn Menard
Routing - Design Review1/15/2015 1/15/2015 PASS
DetailsAndrea Tuning
Plan resubmittals received  1/13/2015 DONE
DetailsChristina Prado
Received four revised sets of plan sheets marked A-1 as well as fire code review & design code review responses and small 11 X 17 A-1; Plans mailed in and taken to John Menard for further review
Routing - FIRE12/2/2014 12/3/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 12-03-14
Extend Review Timeline  11/28/2014 DONE
DetailsJason Blais
Routing - PLAN CHECK6/20/2014 10/9/2014  
DetailsJohn Menard
Routing - Design Review10/9/2014 10/9/2014 FAIL
DetailsAndrea Tuning
The applicant has not provided the two bicycle parking spaces that were required with the Design Review approval DRH13-00269.
Route to Impact Fee Review6/19/20146/24/20146/20/2014 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK4/24/2014 6/19/2014  
Routing - PLAN CHECK1/13/2014 4/24/2014  
DetailsJohn Menard
Routing PW Drainage4/24/2014 4/24/2014 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS4/24/2014 4/24/2014 PASS
DetailsBeverly Mountain
Plan resubmittals received  4/23/2014 DONE
rec'd 5 copies of sheet C1.1 and response letter; inserted and take to brian m.
Plan Reviewer's activity  4/8/2014 DONE
DetailsJohn Menard
E-mailed the applicant requesting a status update on the permit application and submittal of requested revisions. JCM
Routing - FIRE1/10/201412/20/20141/13/2014 FAIL
DetailsCraig D. Hanson
Please see Fire Plan Report 01-13-14
1st review completed  1/13/2014 FAIL
Failed: Plan Check, Fire, PW
Plan resubmittals requested  1/10/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK12/26/2013 1/10/2014 FAIL
DetailsJohn Menard
1st review completed  1/10/2014 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment12/24/2013 12/26/2013 PASS
DetailsAndy J. Long
No plan required. Completed construction. Will field verify there are no outstanding ESC concerns.
Routing - PUBLIC WORKS12/20/2013 12/24/2013 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy
Routing - Addressing  12/23/2013 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div12/20/2013 12/20/2013 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  12/20/2013 DONE
DetailsChristina Prado
Intake Approval  12/20/2013 PASS
DetailsJohn Menard
Recd Pcfee & Taken To Pln CK  12/20/2013 DONE
DetailsChristina Prado
Pending Assignment by JCM12/20/2013 12/20/2013 DONE
DetailsJohn Menard
Application received 12/20/2013   
Routing PW Drainage12/23/2013   FAIL
DetailsBrian Murphy
NEEDS DRAINAGE REPORT
Routing - PLAN CHECK     
DetailsJohn Menard