Permit Information
Permit NumberBLD13-03538
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8729 W PINE VALLEY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1340 sq. ft., 3 story (first story 228 sq. ft, second story 552 sq. ft., third story 560 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 90 sq. ft. of covered patio/porch and a 379 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201410/16/201410/16/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
DOC - Permit Finaled10/16/201410/16/201410/16/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results10/16/201410/16/201410/16/2014ADONE
DetailsMike Jordan
6
BLD-Energy code compliance8/8/20148/13/20148/13/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Framing/Rough-in8/7/20148/11/20148/11/2014AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark. Complete 2hr. firewal at attick both sides, Install shear blockingabove slider 2nd. floor. Nail off all simpson hangars 1st. floor. Add additional stud under 2ply LVL at stairs 2nd. floor. fireblock 3rd floor tub at floor. ok to insulate. correction notice posted.
BLD-Energy code compliance8/7/20148/12/20148/8/2014PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
BLD-Wall Bracing8/6/20148/6/20148/6/2014PPASS
DetailsMike Jordan
BLD-Wall Bracing8/5/20148/6/20148/6/2014APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall Bracing7/10/20147/11/20147/11/2014APASS
DetailsMike Jordan
Upper floor shear nailing Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall cover7/9/20147/9/20147/9/2014PPASS
DetailsMike Jordan
firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. 3rd floor firewall ok.
BLD-Wall cover7/3/20147/3/20147/3/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark. 2nd. floor base layer 5/8 type x for 2hr. fire wall ok.
BLD-Wall cover6/26/20146/26/20146/26/2014PPASS
DetailsMike Jordan
Firewall Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall Bracing5/13/20145/13/20145/13/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd story ok.
BLD-Wall cover5/9/20145/9/20145/9/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 1st floor, base layer ok.
BLD-Concrete4/28/20144/29/20144/29/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Interior thickend footings.
BLD-Foundation3/20/20143/21/20143/21/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing3/20/20143/20/20143/20/2014PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Conference3/20/20143/20/20143/20/2014PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
BLD-Energy code compliance3/14/20143/14/20143/14/2014ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
OVERRIDE  2/20/2014  
Issue PAID IN FULL permit  2/20/2014 DONE
Permit Ready to Issue  2/20/2014 DONE
Plan assigned to (JG)12/24/201312/24/20131/8/2014 PASS
DetailsJavier Guzman
Due 1/10 L2 ***
1st review completed  1/8/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  1/8/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/8/2014 DONE
Inspection Record Card- Bld  1/8/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK1/7/2014 1/8/2014 PASS
DetailsJavier Guzman
Routing - MECHANICAL12/27/2013 1/7/2014 PASS
DetailsTroy James
Route to Impact Fee Review12/24/201312/27/201312/30/2013 PASS
DetailsCindy M. Gould
Route to Impact Fee Review12/23/201312/27/201312/30/2013 PASS
DetailsCindy M. Gould
Routing - Addressing12/24/2013 12/30/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  12/30/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING12/30/2013 12/27/2013 PASS
DetailsSue Cummings
Plans ACCEPTED BY PLAN TECH  12/24/2013 DONE
DetailsChristina Prado
Intake Approval  12/24/2013 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/24/2013 DONE
DetailsChristina Prado
Application received 12/23/2013