Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-03539
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8721 W PINE VALLEY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1340 sq. ft., 3 story (first story 228 sq. ft, second story 552 sq. ft., third story 560 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 90 sq. ft. of covered patio/porch and a 379 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201410/16/201410/16/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
DOC - Permit Finaled10/16/201410/16/201410/16/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results10/16/201410/16/201410/16/2014ADONE
DetailsMike Jordan
5
BLD-Energy code compliance8/22/20148/25/20148/22/2014ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
BLD-Energy code compliance8/8/20148/13/20148/13/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Framing/Rough-in8/7/20148/11/20148/11/2014AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark. fireblock 3rd floor tub at floor. ok to insulate.
BLD-Energy code compliance8/7/20148/12/20148/8/2014PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
BLD-Wall Bracing8/6/20148/6/20148/6/2014PPASS
DetailsMike Jordan
BLD-Wall Bracing8/5/20148/6/20148/6/2014APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall cover7/9/20147/9/20147/9/2014PPASS
DetailsMike Jordan
firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. 3rd floor firewall ok.
BLD-Wall cover7/3/20147/3/20147/3/2014PPASS
DetailsMike Jordan
Firewall connections. Please inspect abour 1 pm if possible. Phone #: ###-#### Inspection requested via web by Brian Stark. 2nd. floor base layer 5/8 type x for 2hr. fire wall ok.
BLD-Wall cover6/26/20146/26/20146/26/2014PPASS
DetailsMike Jordan
Firewall connections Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall Bracing5/13/20145/13/20145/13/2014PPASS
DetailsMike Jordan
Shear nailing upper floor. Please inspect between 1-2 PM Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall cover5/9/20145/9/20145/9/2014PCANC
DetailsMike Jordan
Firewall assembly fastening. Please inspect between 1-2 pm. Phone #: ###-#### >> Inspection requested via web by Brian Stark. 1st floor, base layer ok.
BLD-Concrete4/28/20144/29/20144/29/2014PPASS
DetailsMike Jordan
Please inspect between 1-2 pm Phone #: ###-#### >> Inspection requested via web by Brian Stark. Interior thickend footings.
BLD-Foundation3/20/20143/21/20143/21/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing3/20/20143/20/20143/20/2014PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Energy code compliance3/14/20143/14/20143/14/2014ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
Issue PAID IN FULL permit  2/20/2014 DONE
OVERRIDE  1/8/2014  
Plan assigned to (JG)12/24/201312/24/20131/8/2014 PASS
DetailsJavier Guzman
Due 1/10 L2 ***
1st review completed  1/8/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  1/8/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/8/2014 DONE
Inspection Record Card- Bld  1/8/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  1/8/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK1/7/2014 1/8/2014 PASS
DetailsJavier Guzman
Routing - MECHANICAL12/27/2013 1/7/2014 PASS
DetailsTroy James
Route to Impact Fee Review12/24/201312/27/201312/30/2013 PASS
DetailsCindy M. Gould
Route to Impact Fee Review12/23/201312/27/201312/30/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING12/26/2013 12/27/2013 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS  12/26/2013 PASS
Routing - Addressing12/24/2013 12/24/2013 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  12/24/2013 DONE
DetailsChristina Prado
Intake Approval  12/24/2013 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/24/2013 DONE
DetailsChristina Prado
Application received 12/23/201312/23/2013 DONE
DetailsBarbara Stitt