BLD-Final | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
DOC - Permit Finaled | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 10/16/2014 | 10/20/2014 | 10/20/2014 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD-Framing/Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD-Wall Bracing | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | NR |
Phil Shearer
|
|
|
Shear or firewall construction Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD-Wall cover | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Mike Jordan
|
|
|
Firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. 2nd. floor 2hr. firewall ok.
|
BLD-Wall cover | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Mike Jordan
|
|
|
Firewall Phone #: ###-#### Inspection requested via web by Brian Stark. 1st. floor.
|
BLD-Footing | 6/24/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Mike Jordan
|
|
|
flatwork Phone #: ###-#### Inspection requested via web by James Larkin. INterior thickend footings.
|
BLD-Footing | 6/13/2014 | 6/13/2014 | 6/13/2014 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin. Interior thickend footing.
|
BLD-Energy code compliance | 6/2/2014 | 6/2/2014 | 6/2/2014 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin. Rigid insulation at stemwall under slab on grade.
|
BLD-Footing | 5/27/2014 | 5/27/2014 | 5/27/2014 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD-Footing | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
Issue PAID IN FULL permit | | | 2/20/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 2/3/2014 | | |
|
|
|
|
Plan assigned to (AJS) | 1/7/2014 | 1/7/2014 | 2/3/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed
|
Routing - PLAN CHECK | 2/3/2014 | | 2/3/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 2/3/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2014 | | DONE |
|
|
|
|
Telephone call | | | 2/3/2014 | | DONE |
Christina Prado
|
|
|
called James to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 2/3/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 2/3/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 1/29/2014 | | |
|
|
|
Received 1 copy of structural calcs and taken to Adele's desk
|
Routing - PLAN CHECK | 1/27/2014 | | 1/27/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent to jim 1/27/14
Jim,
The engineering that was dropped off for these permits was for model E4. The cover sheet for the E4 models does not include the 2 lots that the E2 model sits on.
I need the engineering for model E2 (lots 202,203)submitted so that I can complete my review.
I also left you a voice mail.
If you have any questions please let me know.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####
|
Plan resubmittals received | | | 1/17/2014 | | |
|
|
|
Received 2 copies of structureal calcs and taked to Adele's desk
|
Routing - MECHANICAL | 12/27/2013 | | 1/9/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/7/2014 | | 1/8/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed jim 1/8/14
Lot 202 and 203 Block 1
Jim, can you please send me the engineering for this 3 story duplex. The engineering that we received did not include these lots or model on the cover sheet.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####
|
1st review completed | | | 1/8/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (JG) | 12/24/2013 | 12/24/2013 | 1/7/2014 | | DEFR |
Javier Guzman
|
|
|
Due 1/09 L2 ***
|
Route to Impact Fee Review | 12/24/2013 | 12/27/2013 | 12/30/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 12/26/2013 | | 12/27/2013 | | PASS |
Sue Cummings
|
|
|
Sue Cummings
|
Routing - PUBLIC WORKS | | | 12/26/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 12/24/2013 | | 12/24/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/24/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 12/23/2013 | 12/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 12/23/2013 | | PASS |
Barbara Stitt
|
|
|
|