Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-03549
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8609 W PINE VALLEY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1340 sq. ft., 3 story (first story 228 sq. ft, second story 552 sq. ft., third story 560 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 90 sq. ft. of covered patio/porch and a 379 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. ajs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/23/20151/23/20151/23/2015PPASS
DetailsMike Jordan
Please call brian prior Phone #: ###-#### Inspection requested via web by Brian Stark
DOC - Permit Finaled1/23/20151/23/20151/23/2015PPASS
DetailsMike Jordan
BLD-Energy code compliance10/16/201410/20/201410/20/2014APASS
DetailsMike Jordan
Please call brian Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Framing/Rough-in10/15/201410/16/201410/16/2014APASS
DetailsMike Jordan
Call brian prior Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Conference9/29/20149/30/20149/30/2014ADONE
DetailsMike Jordan
Engineering review, call brian ahead of time Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall Bracing9/16/20149/17/20149/17/2014ANR
DetailsPhil Shearer
Shear or firewwll construction Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Wall cover9/15/20149/15/20149/15/2014PPASS
DetailsMike Jordan
Firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. 2nd floor 2hr. fire wall ok.
BLD-Wall cover9/11/20149/11/20149/11/2014PPASS
DetailsMike Jordan
Firewall Phone #: ###-#### Inspection requested via web by Brian Stark. 2nd floor firewall ok.
BLD-Wall cover9/8/20149/9/20149/9/2014APASS
DetailsMike Jordan
Firewall Phone #: ###-#### Inspection requested via web by Brian Stark. 1st. floor.
BLD-Footing6/24/20146/24/20146/24/2014APASS
DetailsMike Jordan
flatwork Phone #: ###-#### Inspection requested via web by James Larkin. INterior thickend footings.
BLD-Footing6/13/20146/13/20146/13/2014APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin. Interior thickend footing.
BLD-Energy code compliance6/2/20146/2/20146/2/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin. Rigid insulation at stemwall under slab on grade.
BLD-Footing5/27/20145/27/20145/27/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
Issue PAID IN FULL permit  2/20/2014 DONE
OVERRIDE  2/3/2014  
Plan assigned to (AJS)1/7/20141/7/20142/3/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed
Routing - PLAN CHECK2/3/2014 2/3/2014 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  2/3/2014 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/3/2014 DONE
Inspection Record Card- Bld  2/3/2014 DONE
Telephone call  2/3/2014 DONE
DetailsChristina Prado
called James to advise permit is ready and gave fees due
Permit Ready to Issue  2/3/2014 DONE
DetailsChristina Prado
Plan resubmittals received  1/29/2014  
Received 1 copy of structural calcs and taken to Adele's desk
Routing - PLAN CHECK1/27/2014 1/27/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Jim,

The engineering that was dropped off for these permits was for model E4. The cover sheet for the E4 models does not include the 2 lots that the E2 model sits on.

I need the engineering for model E2 (lots 202,203)submitted so that I can complete my review.

I also left you a voice mail.

If you have any questions please let me know.

Thank you

Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####
Plan resubmittals received  1/17/2014  
Received 2 copies of structural calcs and taken to Adele's desk
1st review completed  1/8/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK1/7/2014 1/8/2014 FAIL
DetailsAdele J Schaffeld-Griffin
email sent to Jim 1/8/14

Lot 202 and 203 Block 1

Jim, can you please send me the engineering for this 3 story duplex. The engineering that we received did not include these lots or model on the cover sheet.

Thank you

Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####
Plan assigned to (JG)12/24/201312/24/20131/7/2014 DEFR
DetailsJavier Guzman
Due 1/09 L2 ***
Routing - MECHANICAL12/27/2013 1/3/2014 PASS
DetailsTroy James
Route to Impact Fee Review12/24/201312/27/201312/30/2013 PASS
DetailsCindy M. Gould
Routing - Addressing12/24/2013 12/30/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  12/30/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING12/30/2013 12/27/2013 PASS
DetailsSue Cummings
Sue Cummings
Plans ACCEPTED BY PLAN TECH  12/24/2013 DONE
DetailsBarbara Stitt
Application received 12/23/201312/23/2013 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  12/23/2013 DONE
DetailsBarbara Stitt
Intake Approval  12/23/2013 PASS
DetailsBarbara Stitt