Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-03557
StatusFinaled
Name CAHILL CONSTRUCTION INC
Site Address 350 N MILWAUKEE ST Unit: 1065
Project NameBTS - #1065 Bath & Body Works
Customer Number 
ePlanReviewNo
Description
(BATH & BODY WORKS – BTS SPACE # 1065) Permit is to remodel an existing 3,870 square foot tenant space. This space was previously occupied by “Layne Bryant” as a 5,869 square foot tenant. Then “Victoria Secret” expanded into 2,018 square feet of that space under BLD13-03370. Scope of work includes: new mechanical system, new unisex restroom, new accessible counter, new partition walls to create a back room, new lighting, new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation and a separate racking permit for racks exceeding 8 ft. is required before they are installed. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/14/20147/31/2014 DONE
DetailsChristina Prado
Second Notice 6/15/20147/9/2014 DONE
First Notice 5/19/20146/5/2014 DONE
DetailsChristina Prado
Permanent Occupancy  5/9/2014 DONE
DetailsChristina Prado
BLD-Final4/15/20144/16/20144/16/2014APASS
DetailsMike Jordan
timothy Phone #: ###-####. ok for perm occ.
BLD-Final4/14/20144/15/20144/15/2014PNR
DetailsMike Jordan
pat Phone #: ###-####
FIRE-Final Inspection4/14/20144/15/20144/15/2014PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection4/15/20144/15/20144/15/2014AFAIL
DetailsTroy Cobbley
Provide exit sign as per the plans, repair the emergency lights, mount the fire extinguishers, provide racking permit for the racks over 8' as per the approved plans/notes.
BLD-Ceiling Grid Inspection4/9/20144/9/20144/9/2014PPASS
DetailsMike Jordan
BLD-Framing/Rough-in3/10/20143/10/20143/10/2014PPART
DetailsMike Jordan
Call for access - Everett Phone #: ###-####. Storefront, hardlids and remainder of framing behind cash wrap. Pending electrical and plumbing rough in inspections.
BLD-Framing/Rough-in2/26/20142/27/20142/27/2014APART
DetailsMike Jordan
everett Phone #: ###-####. Interior steej stud walls from front to cashrap only. no grid or ceiling or storefront.
Issue PAID IN FULL permit  2/12/2014 DONE
DetailsTisha Gallop
Application received 12/24/20132/11/2014 DONE
Plan assigned to (TLW)12/27/2013 2/11/2014 PASS
DetailsTim L. Woodard
Level 3 TI - BTS - Bath & Body Works
Routing - PLAN CHECK1/22/2014 2/11/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/11/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/11/2014 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/11/2014 DONE
Permit Ready to Issue  2/11/2014 DONE
DetailsTisha Gallop
Plan resubmittals received  2/10/2014 DONE
DetailsChristina Prado
Received one transmillat letter, one reviewer comments, two sets of revised structural calcs and two sets of revised plan sheets marked A00.0, A00.1, A00.2, A01.1, A02.1, A04.1, A05.1, A06.1, A07.1, A07.1a, A08.1, A08.3, A08.6, A10.1, A10.2, A10.3, A10.4, A10.5, A10.6, A11.1, A11.2, A12.2, A14.2, S01.1, S02.1, S03.1, S03.2, S05.1, E02.1, E03.1, E04.1, E05.1, M01.2, M02.1, M03.1, P01.1, P02.1, P02.2 & P03.1; Plans taken to Tim Woodard for further review
1st review completed  1/22/2014 FAIL
Failed Plan Check.
Routing - FIRE1/16/2014 1/22/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - PLAN CHECK12/30/2013 1/16/2014 FAIL
DetailsTim L. Woodard
Refer to plan review report attached to case. TLW
Routing - PUBLIC WORKS  1/16/2014 PASS
DetailsConnie Baumgartner
Approved on routing slip attached to this case. TLW
Routing - Addressing12/27/2013 12/30/2013 PASS
DetailsJason C. Taylor
Pending Assignment by JCB12/26/2013 12/27/2013 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  12/26/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/26/2013 DONE
DetailsChristina Prado
Intake Approval  12/24/2013 PASS