Permit Information
Permit NumberBLD13-03575
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 495 N DUPONT AVE
Project NameContract Supplement Packaging
Customer Number 
ePlanReviewNo
Description
(CONTRACT SUPPLEMENT PACKAGING) Permit for minor tenant improvements to an existing 9,050 sq. ft. tenant space with work to include the removal of one interior bearing wall supporting the mezzanine above and replacing it wth a beam and two support columns. New interior nonbearing walls will be constructed on the existing storage mezzanine level to create a new office and parts room with the current means of egress from the mezzanine being maintained. Two offices on the grade level are being converted to new packaging rooms but no alterations are being made to these two rooms. All work per the approved plans and the attached engineering. NO STORAGE RACKING OVER 8 FEET IN HEIGHT IS ALLOWED UNDER THIS PERMIT. This building is fully sprinklered for area increase any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the Fire Department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/14/20149/2/2014 DONE
follow up // company on hold 9/2/14
Third Notice 6/14/20147/9/2014 DONE
mailed and faxed to Van Auker with letter
Third Notice 5/10/20146/9/2014 DONE
mailed to Van Auker
Third Notice 4/6/20145/5/2014 DONE
mailed
Second Notice 3/10/20144/1/2014 DONE
Faxed 4-1-14
First Notice 2/24/20142/28/2014 DONE
DetailsChristina Prado
mailed 2/28
Permanent Occupancy  2/14/2014 DONE
BLD-Final2/12/20142/13/20142/13/2014APASS
DetailsMike Jordan
jake Phone #: ###-####. ok for perm occ.
BLD-Final2/11/20142/12/20142/12/2014ANR
DetailsMike Jordan
jake Phone #: ###-####. Needs mech. final.
FIRE-Final Inspection2/11/20142/12/20142/12/2014APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection2/11/20142/11/20142/11/2014PFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire sprinkler permit is finaled
BLD-Framing/Rough-in2/10/20142/10/20142/10/2014PPASS
DetailsMike Jordan
call 1/2 hr ahead // Jake Phone #: ###-####. Ceiling grid ok.
BLD-Framing/Rough-in1/24/20141/27/20141/27/2014APASS
DetailsMike Jordan
Jake Tucker Phone #: ###-####. Interior steel stud walls at mezz. T.S. coulmns and beam and new header.
Routing - FIRE1/6/20141/6/20141/7/2014 PASS
DetailsCraig D. Hanson
Plan assigned to (CDM)12/30/201312/30/20131/7/2014 PASS
DetailsCarl D Madsen
1st review completed  1/7/2014 PASS
Routing - PLAN CHECK1/7/2014 1/7/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  1/7/2014 DONE
Print Occupancy Form  1/7/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  1/7/2014 DONE
DetailsBarbara Stitt
Telephone call  1/7/2014 DONE
DetailsBarbara Stitt
Called Gayle and told him that permit is ready, fees due, and need GC info on 1-7-14 @ 11:45am///BAS
Override - People Holds  1/7/2014  
Issue PAID IN FULL permit  1/7/2014 DONE
DetailsBarbara Stitt
(F) Reprint permit  1/7/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK12/30/2013 1/6/2014 PASS
DetailsCarl D Madsen
Case Summary (BLD)  1/6/2014 DONE
Application received 12/30/201312/30/2013 DONE
Plans ACCEPTED BY PLAN TECH  12/30/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  12/30/2013 DONE
DetailsTisha Gallop