Permit Information
Permit NumberBLD13-03603
StatusFinaled
Name CHAMISA BUILDING CO INC
Site Address 1314 W GROVE ST
Project NameModern Hotel Kitchen
Customer Number 
ePlanReviewYes
Description
(MODERN HOTEL KITCHEN) Permit to add an type I culinary hood, install new waste line and grease interceptor, outside grade level mechanical equipment, equipment enclosure, and add new kitchen equipment including: commercial range, salamander, open burner range, counter fryer, refrigerated units, and culinary sinks. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/4/20144/28/2014 DONE
DetailsChristina Prado
complete 4-28-14
First Notice3/31/20143/31/20144/24/2014 DONE
DetailsTom Arcoraci
BLD-Final3/31/20143/31/20143/31/2014PPASS
DetailsTom Arcoraci
DOC - Permit Finaled3/31/20143/31/20143/31/2014PPASS
DetailsTom Arcoraci
FIRE-Final Inspection3/27/20143/28/20143/28/2014PPASS
DetailsForrest France
Fire life safety completed satisfactory.
BLD-Footing3/18/20143/19/20143/18/2014APASS
DetailsTom Arcoraci
Jack Phone #: ###-####
Inspection Record Card- Bld  3/7/2014 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  3/7/2014 DONE
DetailsBarbara Stitt
FIRE-Conference3/4/20143/5/20143/4/2014ACANC
DetailsTom Arcoraci
###-#### jack call 1st please canc by contractor
OVERRIDE  2/28/2014  
Telephone call  2/28/2014 DONE
DetailsTisha Gallop
called Jack Zastrow (Chamisa Bldg Co) and told him permit is ready, fee due.
Permit Ready to Issue  2/28/2014 DONE
DetailsTisha Gallop
Plan assigned to (AJS)1/6/20141/6/20142/25/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 1/17 Modern Hotel
Routing - PLAN CHECK2/25/2014 2/25/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/25/2014 DONE
Routing - MECHANICAL2/24/2014 2/24/2014 PASS
DetailsTroy James
approved with red notes on plans
Routing - PLAN CHECK2/19/2014 2/19/2014 FAIL
DetailsAdele J Schaffeld-Griffin
building plans ok need mechanical approval
Routing - MECHANICAL2/19/2014 2/19/2014 FAIL
DetailsTroy James
previous comments have not been addressed.
Routing - PLANNING2/10/2014 2/18/2014 PASS
DetailsSarah Schafer
Routing - PLAN CHECK2/10/2014 2/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see e plan
Routing - MECHANICAL2/10/2014 2/12/2014 FAIL
DetailsTroy James
eplan
Routing - Erosion and Sediment2/10/2014 2/10/2014 CANC
DetailsAndy J. Long
duplicate entry
Routing - Erosion and Sediment2/10/2014 2/10/2014 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Needs to have valid RP
Routing - PLAN CHECK1/21/2014 1/27/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see comments in e plan
Routing - PLANNING1/27/2014 1/27/2014 FAIL
DetailsSarah Schafer
failed in e plan
Routing - MECHANICAL1/21/2014 1/23/2014 FAIL
DetailsTroy James
eplan
Routing Off Site - C.D.H1/6/2014 1/21/2014 PASS
DetailsAdele J Schaffeld-Griffin
approved in e plan by Jeremy Kitzhaber
Routing - PLAN CHECK1/6/2014 1/9/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan
Routing - MECHANICAL1/9/2014 1/9/2014 FAIL
DetailsTroy James
Incomplete plans to complete mechanical review.
1st review completed  1/9/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Plan Reviewer's activity  1/9/2014 DONE
DetailsAdele J Schaffeld-Griffin
email sent to rob 1/9/14

Rob, the city has completed all of their review comments completed for this project. I am unable to send them back to you as the health department has not signed off and states in e plan that they will not until they meet with you tomorrow 1/10/14. You can sign into e plan and review the change marks if you would like to see what the comments are.

Troy James, mechanical review ###-####

If you have any questions please let me know.


Thanks


Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####

Routing PW Sewer Rating1/6/2014 1/7/2014 PASS
DetailsConnie Baumgartner
Routing PW Environmental1/6/2014 1/6/2014 PASS
DetailsWalt Baumgartner
Routing - PLANNING1/6/2014 1/6/2014 PASS
DetailsSarah Schafer
Infill of window to match adjacent CMU approved through the building permit application.
Routing - Addressing1/6/2014 1/6/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS1/6/2014 1/6/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment1/6/2014 1/6/2014 PASS
DetailsEvan Jenkins
Close to Threshold of Requireing full ESC Narrative and SIte Map. Plan designer was notified, and contractor will be on close watch for exceedence of the size of project.
Intake Approval  1/6/2014 PASS
DetailsAdele J Schaffeld-Griffin
Application received  12/31/2013 DONE
Application submitted via PDS Online on Dec 31 2013 10:49AM
Intake Approval  12/31/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Please complete and submitt the 518 check list and 304 design professional form. Please upload the required additional plans for the scope of work for this permit. As shown on the check list stamped mechanical plans need to be submitted for the new Type 1 hood. Please review the ESC requirements and submit waiver letter if necessary for this project.
Please upload the required Central District Health required documents.

If you have any questions please give me a call.

Thank you

Adele

###-####
Routing - PLUMBING1/6/2014 1/6/2013 PASS
DetailsBill VanDegrift
per plans and ispc