Permanent Occupancy | | | 2/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | PASS |
Jim Storey
|
|
|
evan Phone #: ###-####
|
BLD-Final | 2/5/2014 | 2/6/2014 | 2/6/2014 | P | NR |
Jim Storey
|
|
|
Evan-Please call prior to inspection Phone #: ###-####
|
BLD-Final | 2/5/2014 | 2/5/2014 | 2/5/2014 | P | PART |
Jim Storey
|
|
|
Evan-Please call prior to inspection Phone #: ###-#### fix lock at warehouse office door.
|
FIRE-Final Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 | P | PASS |
Forrest France
|
|
|
Noted correction items finished. Fire life safety finaled.
|
Plan resubmittals received | | | 2/4/2014 | | |
|
|
|
Received a new copy of the existing floor plan-taken in by Tim Woodard
|
BLD-Final | 1/31/2014 | 2/3/2014 | 2/3/2014 | P | FAIL |
Jim Storey
|
|
|
evan Phone #: ###-#### Need plan review of revised floorplan prior to field inspection.
|
FIRE-Final Inspection | 1/31/2014 | 2/3/2014 | 2/3/2014 | A | NR |
Forrest France
|
|
|
Need plan review of revised floorplan prior to field inspection.
|
FIRE-Conference | 1/3/2014 | 1/3/2014 | 1/3/2014 | A | DONE |
Forrest France
|
|
|
Regarding noted correction items including significant floorplan changes not reflected on the provided permit documents.
|
BLD-Final | 12/31/2013 | 1/2/2014 | 1/2/2014 | P | FAIL |
Jim Storey
|
|
|
Please call ahead for access - Evan Phone #: ###-####c/n posted// maintane firewalls//exit hatdware//verify saftey glazing/cover paper exposed in attic ceilling.
|
FIRE-Final Inspection | 12/31/2013 | 1/2/2014 | 1/2/2014 | A | FAIL |
Forrest France
|
|
|
Noted several items in need of correction including door hardware, missing or non-functional exit signs/EM lights, lacking fire sprinkler coverage at three areas, floor plan does not match field conditions- need to resubmit drawings.
|
Plan assigned to (AJS) | 12/31/2013 | 12/31/2013 | 12/31/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/31/2013 | | 12/31/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
spoke with Craig, he did not need to review occ evaluation storage of insulation less than 12 feet
|
Case Summary (BLD) | | | 12/31/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 12/31/2013 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 12/31/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
First Notice | | 2/24/2014 | | | |
|
|
|
|
Application received | | 12/31/2013 | | | |
|
|
|
|