BLD-Final | 8/14/2014 | 8/14/2014 | 8/15/2014 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 8/15/2014 | 8/15/2014 | 8/15/2014 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 8/15/2014 | 8/15/2014 | 8/15/2014 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading,re-vegetation, and roof drain moving has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Other | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | PASS |
Jim Storey
|
|
|
fire rated soffit - Eric Phone #: ###-#### per the plan
|
BLD-Energy code compliance | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | PEND |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | FAIL |
Dave Hannah
|
|
|
eric Phone #: ###-#### c/n on site ok to insulate
|
Plan Modification Accepted | | | 5/2/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 5/2/2014 | | 5/2/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | PART |
Jim Sly
|
|
|
Ben Phone #: ###-#### East 1/2f of Basement walls........and Columns.....OK.
|
BLD-Foundation | 2/18/2014 | 2/19/2014 | 2/19/2014 | A | PART |
Dave Hannah
|
|
|
Denton Phone #: ###-#### ok to pour lower section
|
PubWorks Subgrade Approval | 2/19/2014 | 2/19/2014 | 2/19/2014 | | DONE |
Jason C. Taylor
|
|
|
*ALL FOOTINGS & COLUMNS* A letter from the applicant’s geotechnical engineer indicating that the footing & column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PART |
Tony Young
|
|
|
Denton Phone #: ###-####,, work in progress,, 20%
|
DOC - Permit Finaled | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Tony Young
|
|
|
(This activity was added in error so we have changed the case status back to Issued.) (This activity was added in error so we have changed the case status back to Issued.) (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Footing | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PART |
Jim Sly
|
|
|
Ben Phone #: ###-#### House footings OK No column footings.
|
PubWorks Subgrade Approval | 2/7/2014 | 2/7/2014 | 2/7/2014 | | DONE |
Jason C. Taylor
|
|
|
*FOOTINGS ONLY NO COLUMNS* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 1/28/2014 | | |
|
|
|
|
Plan assigned to (JG) | 1/10/2014 | 1/10/2014 | 1/28/2014 | | PASS |
Javier Guzman
|
|
|
1st reveiw completed, Pending hillside grading, Due 1/29 L2 Hillside ePlan**
|
Issue PAID IN FULL permit | | | 1/28/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 1/24/2014 | | 1/28/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 1/28/2014 | | 1/28/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and SWPPP re-submitted as requested and approved. Valid PD and RP provided.
|
Routing PW Grading-Hillside | 1/28/2014 | | 1/28/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2014 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 1/10/2014 | 1/13/2014 | 1/24/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 1/10/2014 | | 1/24/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan review
|
1st review completed | | | 1/24/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 1/10/2014 | | 1/16/2014 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 1/10/2014 | | 1/16/2014 | | FAIL |
Jason C. Taylor
|
|
|
New grading plan needed.
|
Routing - FIRE | 1/10/2014 | 1/10/2014 | 1/14/2014 | | PASS |
Scott Arellano
|
|
|
No comments attached. Plans approved as shown.
|
Routing - PLANNING | 1/10/2014 | | 1/13/2014 | | PASS |
Joshua Johnson
|
|
|
Driveway must be less than 33' inside of hte front setback.
|
Routing - Addressing | 1/10/2014 | | 1/10/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 1/10/2014 | | 1/10/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 1/10/2014 | | 1/10/2014 | | FAIL |
Andy J. Long
|
|
|
No ESC plan or waiver submitted. Contacted applicant via email to complete submittal.
|
Plans ACCEPTED BY PLAN TECH | | | 1/10/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/10/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/10/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/8/2014 | | FAIL |
Tisha Gallop
|
|
|
See pre-screen list
|
Application received | | | 1/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 6 2014 1:43PM
|