Permit Information
Permit NumberBLD14-00038
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1055 N CURTIS RD
Project NameSARMC - Maternity Center
Customer Number 
ePlanReviewNo
Description
(ST. ALPHONSUS - R.M.C Maternity Center – C-Section / O.R. Remodel) This permit is to renovate an existing 4,163 square foot maternity center and expand 747 square feet into an existing Light well open to the air. This building is fire sprinklered for unlimited area / high rise requirements. Approval per approved plans on file and attached engineering. Work to include: [construction of interior non-bearing walls to create a new C-Section suite (two O.R. rooms / an infant resuscitation room / a sterile supply room / a passage way / a soiled linen room / a clean supply room / a unisex restroom), a waiting room, a meds room, a unisex bathroom, a nurse work area, and an equipment room], construction of exterior bearing walls for small addition, new roof construction over small addition, new exterior windows and doors, installation of new accessible doors and hardware, new plumbing, new electrical, new mechanical, and interior finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/14/20156/18/2015 DONE
Print Statement  6/18/2015 DONE
DetailsChristina Prado
Second Notice 5/15/20156/9/2015 DONE
sent in mail
First Notice 4/12/20155/5/2015 DONE
Permanent Occupancy  4/2/2015 DONE
DetailsChristina Prado
BLD-Final12/12/201412/15/201412/15/2014APASS
DetailsMike Jordan
Brad Turk Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
BLD-Conference11/25/201411/25/201411/25/2014PDONE
DetailsMike Jordan
Mike, I think we can do this conference over the phone.
Please give me a call at your convenience.
Thanks Phone #: ###-#### Inspection requested via web by Brad Turk
FIRE-Final Inspection11/25/201411/25/201411/25/2014PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection11/20/201411/20/201411/20/2014PPASS
DetailsMike Jordan
Brad Turk
Grip inspection for Maternity room 124 Phone #: ###-#### Inspection requested via web by Brad Turk
BLD-Framing/Rough-in10/30/201410/31/201410/31/2014PPASS
DetailsMike Jordan
Final phase framing inspection. Phone #: ###-#### Inspection requested via web by Chris Jackson. existing nurses station addition, window infill and removal of portion interior non load bearing wall.
BLD-Ceiling Grid Inspection10/8/201410/9/201410/9/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Chris Jackson. equipment rm. 126 and med rm 125.
BLD-Framing/Rough-in9/16/20149/17/20149/17/2014APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Peter Kilpatrick ph 2 med rm ok to cover after other trades ok rough ins
BLD-Final7/28/20147/29/20147/29/2014APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Chris Jackson phase 1 ok for occupance. saftey glazzing to be labled in doors between or suits.
BLD-Final7/28/20147/28/20147/28/2014PDEFR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Chris Jackson
FIRE-Final Inspection7/24/20147/25/20147/25/2014AFAIL
DetailsTroy Cobbley
Life safety in Maternity area will be ok to sign off when the fire alarm is passed in this area.
BLD-Ceiling Grid Inspection7/21/20147/21/20147/21/2014PPASS
DetailsMike Jordan
Chris Jackson - Andersen Phone #: ###-#### Inspection requested via web by Chris Jackson. Passage 109 completed ok.
BLD-Ceiling Grid Inspection7/7/20147/8/20147/8/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Chris Jackson. rooms 110, 113, 116 ok.
BLD-Ceiling Grid Inspection6/13/20146/16/20146/16/2014APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Jackson. OR #10 ok for hardlid.
BLD-Framing/Rough-in4/17/20144/18/20144/18/2014APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Chris Jackson
BLD-Footing3/17/20143/18/20143/18/2014APASS
DetailsTom Arcoraci
Please call 15 min before, new project at St. Als. 10:00 A.M. Pour. Phone #: ###-#### >> Inspection requested via web by Chris Jackson
Issue PAID IN FULL permit  3/12/2014 DONE
DetailsTisha Gallop
OVERRIDE  3/10/2014  
Application received 1/6/20143/10/2014 DONE
Telephone call  3/10/2014 DONE
DetailsTisha Gallop
called Sam and told him permit is ready, fee due, need ACHD, GC and RP.
Permit Ready to Issue  3/10/2014 DONE
DetailsTisha Gallop
Routing - PLAN CHECK3/5/2014 3/7/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/7/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/7/2014 DONE
DetailsTim L. Woodard
Print Occupancy Form  3/7/2014 DONE
DetailsChristina Prado
Plan assigned to (TLW)1/7/2014 3/7/2014 PASS
DetailsTim L. Woodard
Level 3 TI - St. Al's Maternity Center
Routing - FIRE3/4/2014 3/5/2014 PASS
DetailsCraig D. Hanson
See attached fire plan review 03-05-14
Routing - Erosion and Sediment3/3/2014 3/4/2014 PASS
DetailsAndy J. Long
ESC plan and narrative submitted and approved. Valid PD, need to designate RP when contract is awarded.
Routing - PLAN CHECK2/3/2014 3/3/2014 PASS
DetailsTim L. Woodard
Plan resubmittals received  2/28/2014  
received response and two copies of ESC plan/narrative and plan sheets 0.0, C2.0, A0.1, A2.1, A2.1D, A2.2, A3.0, A5.0, A8.0, M1.0, M1.1, E2.1D, E2.1F, E4.0; ,
Route to Impact Fee Review1/31/20142/5/20142/5/2014 PASS
DetailsCindy M. Gould
Renovation and Addition of 747 square feet into light well. No impact fees
1st review completed  2/3/2014 FAIL
Failed: Fire, Plan Check, Erosion.
Routing - FIRE1/31/2014 2/3/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan 1st Review Report 02-03-14
Routing - PLAN CHECK1/28/2014 1/31/2014 FAIL
DetailsTim L. Woodard
Refer to attached plan review report. TLW
Routing - Erosion and Sediment1/31/2014 1/31/2014 FAIL
DetailsTim L. Woodard
I discussed project with Evan Jenkins (ESC Manager) due to the addition exceeding 600 square feet an ESC Plan and Narritive are required. TLW
Routing - MECHANICAL1/10/2014 1/28/2014 PASS
DetailsTroy James
Routing - PLUMBING1/10/2014 1/10/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - PUBLIC WORKS1/8/2014 1/10/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing1/7/2014 1/8/2014 PASS
DetailsJason C. Taylor
Plan assigned to (CJW)1/7/20141/7/20141/7/2014 DEFR
DetailsCarl Westfall
Reassigned.
Pending Assignment by JCB1/7/2014 1/7/2014 DONE
DetailsJason Blais
Intake Approval  1/6/2014 PASS
DetailsSam Zahorka