Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-00087
StatusFinaled
Name TAHOE HOMES LLC
Site Address 2982 E HEARTLEAF LN
Project Name 
Customer Number 
ePlanReviewNo
Description
**WUI "A" HILLSIDE** To construct a new 2372s.f. 2-story single family dwelling with 1106s.f. of living space with a 1/2 bath and mud room on the main level and 1266s.f. on the upper level with 3-bedrooms and 2-bathrooms on the upper level that extends over the 629s.f. 2-car garage with shop. There is 102 s.f of solid fenced enclosure and 107s.f. of covered patio driveway in front of the garage entry; 78s.f. of covered patio at the rear and 74s.f. of covered entry patio area. All per the approved plans as marked, REScheck, engineers details and calculations; ACCA report along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/27/20146/30/20146/30/2014APASS
DetailsJim Storey
Clint Phone #: ###-####
DOC - Permit Finaled6/30/20146/30/20146/30/2014PPASS
DetailsJim Storey
BLD-Blower Door Test Results6/30/20146/30/20146/30/2014ADONE
DetailsJim Storey
5.2Clint Phone #: ###-####
BLD-Final6/24/20146/27/20146/27/2014ANH
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Clint Wall. No access.
PubWorks Occupancy Approval6/3/20146/3/20146/3/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance4/15/20144/21/20144/21/2014APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/16/20144/17/20144/17/2014PPASS
DetailsJim Storey
re-inspect please. Tony, ###-#### Phone #: ###-#### >> Inspection requested via web by Tony Luchini
BLD-Framing/Rough-in4/15/20144/16/20144/16/2014PFAIL
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Clint Wall c/n posted
BLD-Other4/11/20144/14/20144/14/2014APASS
DetailsJim Storey
clint - fire soffett Phone #: ###-####
BLD-Other4/8/20144/9/20144/9/2014APART
DetailsDave Hannah
soffit - clint Phone #: ###-#### can lights ok to cover
BLD-Wall Bracing3/20/20143/21/20143/21/2014APASS
DetailsJim Storey
Rudy-Around 12 please Phone #: ###-#### 2 nd floor ok
BLD-Foundation3/6/20143/6/20143/6/2014PPASS
DetailsJim Storey
Wes Phone #: ###-####
BLD-Footing3/5/20143/5/20143/5/2014PPASS
DetailsJim Storey
late pm please // Wes Phone #: ###-####
PubWorks Subgrade Approval3/5/20143/5/20143/5/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
Issue PAID IN FULL permit  2/12/2014 DONE
DetailsTisha Gallop
OVERRIDE  2/5/2014  
Plan assigned to (PEP)2/3/20142/3/20142/5/2014 PASS
DetailsPerry Paine
Routing - PLAN CHECK2/3/2014 2/5/2014 PASS
DetailsPerry Paine
Routing PW Grading-Hillside2/5/2014 2/5/2014 PASS
DetailsJason C. Taylor
Plan resubmittals received  2/5/2014  
PLANS/APPL TAKEN TO FRONT DESK  2/5/2014 DONE
Telephone call  2/5/2014 DONE
DetailsChristina Prado
called Tahoe to advise permit is ready for pick up and gave fees due
Permit Ready to Issue  2/5/2014 DONE
DetailsChristina Prado
Plan assigned to (PEP)1/15/20141/15/20142/3/2014 PASS
DetailsPerry Paine
Routing - PLAN CHECK  2/3/2014 PASS
DetailsPerry Paine
PLANS/APPL TAKEN TO FRONT DESK  2/3/2014 DONE
Case Summary (BLD)  2/3/2014  
Case Summary (BLD)  2/3/2014  
Inspection Record Card- Bld  2/3/2014 DONE
CHANGE STATUS TO (REV)  2/3/2014 DONE
DetailsChristina Prado
Still waiting on grading resubmittal for approval
Routing - PLAN CHECK1/27/2014 1/29/2014 FAIL
DetailsPerry Paine
need WUI proper details
1st review completed  1/29/2014 FAIL
need Correct WUI details
Routing - FIRE  1/27/2014 PASS
No comments attached. Plans are approved.
Route to Impact Fee Review1/15/20141/21/20141/24/2014 PASS
DetailsCindy M. Gould
Routing - MECHANICAL1/17/2014 1/24/2014 PASS
DetailsTroy James
Routing - Erosion and Sediment1/24/2014 1/24/2014 PASS
DetailsEvan Jenkins
Plan resubmittals received  1/21/2014  
Received 2 copies of sheet C1 on 11x17 paper and 3 copies of sheet C1 on regular size paper then taken and added to plans in Mechanical review
Routing - PUBLIC WORKS1/17/2014 1/17/2014 PASS
DetailsConnie Baumgartner
Routing - PLANNING1/17/2014 1/17/2014 PASS
DetailsColleen T Carroll
Application received 1/15/20141/16/2014 DONE
Intake Approval  1/16/2014 PASS
DetailsTisha Gallop
Routing PW Grading-Hillside1/16/2014 1/16/2014 FAIL
DetailsJason C. Taylor
Grading plan needs revised to show correct house. Jason Taylor ###-####
Routing - Addressing1/16/2014 1/16/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  1/15/2014 DONE
DetailsTisha Gallop