First Notice | | 5/1/2014 | 5/27/2014 | | DONE |
|
|
|
This permit finaled on the web by Dennis Raistrick
|
Permanent Occupancy | | | 4/21/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Mike Jordan
|
|
|
Dennis Phone #: ###-####. The additional electrical work has been done and signed off. ok for perm occ.
|
BLD-Final | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PART |
Mike Jordan
|
|
|
ok for 30 day temp occ. Verified that an electrical permit was pulled to complete the work in patient care area to make it comply. Did not sign card.
|
Temporary Occupancy | 4/16/2014 | 7/15/2014 | 4/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | PART |
Mike Jordan
|
|
|
Met with Daryl, (electrical inspector) on site to review groundeing requirements for the infusion room. It was determined that this area needs to have the seperate grounding as per NEC requirements. Noted to contractor that once a new electrical permit has been issued for this work, a 30 day temp. occ. would be granted while this work is completed and other portions of building could be used.
|
BLD-Final | 4/14/2014 | 4/15/2014 | 4/15/2014 | A | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Moved to pm. Meeting electrical inspector on site to verify correct grounding and wiring methods in infusion room.
|
FIRE-Final Inspection | 4/14/2014 | 4/15/2014 | 4/15/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/14/2014 | 4/14/2014 | 4/14/2014 | P | FAIL |
Troy Cobbley
|
|
|
needs hardware and exit signs
|
BLD-Framing/Rough-in | 3/18/2014 | 3/18/2014 | 3/18/2014 | P | PASS |
Mike Jordan
|
|
|
Dennis Phone #: ###-####. Interior steel stud framed walls ok.
|
OVERRIDE | | | 3/3/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/3/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/3/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/3/2014 | | |
|
|
|
|
Plan assigned to (CDM) | 2/21/2014 | 2/21/2014 | 2/28/2014 | | PASS |
Carl D Madsen
|
|
|
Level 3 TI - ePlanReview - Pharmacy Solutions
|
Routing - FIRE | 2/19/2014 | 2/19/2014 | 2/28/2014 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Routing PW Solid Waste | 2/19/2014 | | 2/28/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLAN CHECK | 2/21/2014 | | 2/28/2014 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/28/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/19/2014 | | 2/22/2014 | | DEFR |
Carl Westfall
|
|
|
Reassigned to Carl Madsen.
|
Plan assigned to (CJW) | 2/19/2014 | 2/19/2014 | 2/21/2014 | | DEFR |
Carl Westfall
|
|
|
Level 3 TI - ePlanReview - Pharmacy Solutions (20 days - Mar 18)
Reassigned to Carl Madsen.
|
Routing PW Sewer Rating | 2/19/2014 | | 2/21/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 2/19/2014 | | 2/21/2014 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 2/19/2014 | | 2/20/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Need to designate RP for ESC permit.
|
Routing - PLUMBING | 2/19/2014 | | 2/19/2014 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 2/19/2014 | | 2/19/2014 | | PASS |
Josh Wilson
|
|
|
Josh Wilsion - DRH14-00021
|
Routing - Addressing | 2/19/2014 | | 2/19/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 2/19/2014 | | 2/19/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 2/19/2014 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Adele Schaffeld-Griffin and plan reivew fees paid.
|
Pending Assignment by JCB | 2/19/2014 | | 2/19/2014 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 2/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
2/18/14 All of the items from the change marks were not addressed.
1.In the document folder there is a clean room packet with calculations that need to be stamped by the design professioal of record that prepared them for this project.
2. In the documents folder the exterior modifications and the site plan have informaiton that needs to be included in the plan set and stamped by the design professional of record.
2/7/14 Please see the change marks on the 520 checklist document for the outstanding items.
1/23/14The scope of this project includes change of occuancy in portions of the buildings. Change of occupancies are not reviewed under minor TI. Please complete the 520 check list and upload the additional documents required for the project on the check list. One of the items from the list that you will need is a zoning certificate for the proposed changes to the exterior, this includes doors and windows.
I will be able to begin the pre screen once all documents are submitted.
Thank you
|
Intake Approval | | | 2/7/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
2/7/14 Please see the change marks on the 520 checklist document for the outstanding items.
|
Intake Approval | | | 1/23/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
The scope of this project includes change of occuancy in portions of the buildings. Change of occupancies are not reviewed under minor TI. Please complete the 520 check list and upload the additional documents required for the project on the check list. One of the items from the list that you will need is a zoning certificate for the proposed changes to the exterior, this includes doors and windows.
I will be able to begin the pre screen once all documents are submitted.
Thank you
|
Application received | | | 1/22/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 22 2014 2:25PM
|