BLD-Final | 4/8/2014 | 4/9/2014 | 4/9/2014 | A | PASS |
Dave Hannah
|
|
|
ED Phone #: ###-####
|
DOC - Permit Finaled | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 2/20/2014 | 2/20/2014 | 2/20/2014 | P | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2014 | 2/19/2014 | 2/20/2014 | P | PASS |
Dave Hannah
|
|
|
ed Phone #: ###-#### - call mins prior for access
|
BLD-Footing | 2/6/2014 | 2/6/2014 | 2/6/2014 | P | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
PubWorks Subgrade Approval | 2/5/2014 | 2/5/2014 | 2/5/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 1/28/2014 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PASS |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 1/23/2014 | 1/23/2014 | 1/24/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 1/24/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/24/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2014 | | DONE |
|
|
|
|
Telephone call | | | 1/24/2014 | | DONE |
Christina Prado
|
|
|
Left message for John giving fees due and advising permit is ready for pick up
|
Permit Ready to Issue | | | 1/24/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 1/23/2014 | 1/23/2014 | 1/23/2014 | | PASS |
Scott Arellano
|
|
|
The new additon is requried to be fire sprinkered as per the original conditions of constuction for the home.
|
Routing Walk-In (PW Hillside) | 1/23/2014 | 1/23/2014 | 1/23/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 1/23/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 1/23/2014 | 1/23/2014 | 1/23/2014 | A | FAIL |
Adele J Schaffeld-Griffin
|
|
|
needs fire review, existing home is fire sprinklered, did not plan review took in will route to Perry.
|
1st review completed | | | 1/23/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | 1/23/2014 | | | |
|
|
|
|