DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 5/29/2014 | 5/29/2014 | 5/29/2014 | P | PASS |
Dave Hannah
|
|
|
Derrick Phone #: ###-####
|
BLD-Final | 5/19/2014 | 5/20/2014 | 5/21/2014 | P | PART |
Dave Hannah
|
|
|
Derrik-Please call at least 30 mins prior so he can meet ya there Phone #: ###-#### ok for temp cc
|
FIRE-Final Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | P | PASS |
Forrest France
|
|
|
Derek-please 1/2 hr prior Phone #: ###-####
|
Plan Reviewer's activity | | | 5/13/2014 | | DONE |
Sam Zahorka
|
|
|
I was informed additional work including new roof top equipment is being installed without approvals. I called the architect and left a message. Need a plan modification for new work.
|
Telephone call | | | 5/13/2014 | | DONE |
Sam Zahorka
|
|
|
I called the architect Steve Trout and left a message. A plan modification is required for the addition of new roof top equipment.
|
BLD-Framing/Rough-in | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Dave Hannah
|
|
|
derek Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | PART |
Dave Hannah
|
|
|
Derrick Phone #: ###-#### ok to spray cooler
|
OVERRIDE | | | 1/27/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/27/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/27/2014 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 1/23/2014 | 1/23/2014 | 1/24/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 1/23/2014 | | 1/24/2014 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 1/24/2014 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 1/24/2014 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2014 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 1/24/2014 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 1/23/2014 | | | |
|
|
|
|