Third Notice | | 6/10/2014 | 6/16/2014 | | DONE |
Christina Prado
|
|
|
completed 6-16-14
|
Second Notice | | 5/17/2014 | 6/5/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 4/21/2014 | 5/7/2014 | | DONE |
|
|
|
Mailed 5-7-14
|
BLD-Final | 4/9/2014 | 4/10/2014 | 4/11/2014 | A | PASS |
Dave Hannah
|
|
|
Brandon Boomgarden Phone #: ###-####
|
BLD-Final | 4/10/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Dave Hannah
|
|
|
Brandon-Please call at least 30 mins prior to inspection Phone #: ###-####
|
Zoning Approval | 4/11/2014 | 4/11/2014 | 4/11/2014 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 4/11/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Conference | 4/9/2014 | 4/9/2014 | 4/9/2014 | A | DONE |
Forrest France
|
|
|
On site conference regarding fire life safety inspection items and conditions for final.
|
BLD-Framing/Rough-in | 3/10/2014 | 3/11/2014 | 3/11/2014 | A | PART |
Jim Sly
|
|
|
Brandon Phone #: ###-#### Small wall in restroom OK.
|
Permit Ready to Issue | | | 3/3/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 3/3/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 3/3/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 1/27/2014 | 1/27/2014 | 2/28/2014 | | PASS |
Carl Westfall
|
|
|
BOISE ART GLASS - FIRE FUSION STUDIO - ePlanReview - Level 3 TI (20 days - Feb 21)
|
Routing - PLAN CHECK | 2/27/2014 | | 2/28/2014 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
Routing - FIRE | 2/27/2014 | | 2/28/2014 | | PASS |
Craig D. Hanson
|
|
|
See attached Revision 2 report 02-27-14
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/27/2014 | | DONE |
|
|
|
No added documents or drawings by the Architect.
|
Routing - FIRE | 2/20/2014 | | 2/24/2014 | | FAIL |
Craig D. Hanson
|
|
|
See attached report
|
Plan resubmittals received | | | 2/20/2014 | | DONE |
|
|
|
Workflow came back from the Architect on 2-19-14 but he added more documents on 2-20-14.
|
Routing - PLAN CHECK | 2/19/2014 | | 2/20/2014 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
Routing PW Solid Waste | 1/27/2014 | | 2/19/2014 | | PASS |
Peter J. McCullough
|
|
|
|
1st review completed | | | 2/19/2014 | | DONE |
|
|
|
Failed Fire and Building
|
Plan resubmittals requested | | | 2/19/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/27/2014 | | 2/19/2014 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required.
|
Routing - FIRE | 1/27/2014 | 1/27/2014 | 1/30/2014 | | FAIL |
Scott Arellano
|
|
|
See Fire Plan Report 01-30-14
|
Routing - Design Review | 1/27/2014 | | 1/29/2014 | | PASS |
Josh Wilson
|
|
|
Ok per CZC14-00007
|
Routing PW Environmental | 1/27/2014 | | 1/29/2014 | | PASS |
Walt Baumgartner
|
|
|
TI in old food service space will house glass blowing operation. Plans show existing floor sinks in old walkin coolers, etc. Facility will be subject to post opening pretreatment inspection to evaluate for accidental spill protection plan. Operator may be required to plug floor drains at a later date.
|
Plan Reviewer's activity | | | 1/27/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
The zoning certificate uploaded did not include a description of the exterior work. I spoke with Josh Wilson and he is in the process of putting in the description but has already sent them the approved zoning certificate. He was okay with taking the plans in and he will get the description put in.
|
Intake Approval | | | 1/27/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin. Plan Review Fees paid.
|
Pending Assignment by JCB | 1/27/2014 | | 1/27/2014 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 1/27/2014 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD to evaluate if any additional impact fees are due. Written verification from ACHD is required to be provided to the Permit Counter prior to the building permit being issued.
|
Routing PW Sewer Rating | 1/27/2014 | | 1/27/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/27/2014 | | 1/27/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 1/27/2014 | | 1/27/2014 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 1/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2014 12:58PM
|