Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00168
StatusFinaled
Name ALTENERGY INC
Site Address 646 W FULTON ST
Project NameFlicks Theatre
Customer Number 
ePlanReviewNo
Description
(FLICKS THEATRE – Rooftop Solar Panels) Permit is to add 97 solar panels each being 40 inches by 66 inches. This building is fully fire sprinklered. Approval contingent upon adhering to the approved plans on file, structural engineering, and manufactures installation instructions. Work to include: installation of solar panels and associated electrical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/4/2015  
Case Summary (BLD)  3/4/2015  
Second Notice 4/10/20144/24/2014 DONE
DetailsChristina Prado
Fees calculated by Jenifer based on special conditions of project. Final value will not change total fees collected
First Notice3/18/20143/18/20143/31/2014 DONE
DetailsDave Hannah
mailed 4-1-14
FIRE-Final Inspection3/17/20143/18/20143/18/2014ADONE
DetailsForrest France
david or jessie at ###-#### Phone #: ###-####
BLD-Final3/17/20143/18/20143/18/2014PPASS
DetailsDave Hannah
david or jessie at ###-#### - before 4pm please Phone #: ###-####
DOC - Permit Finaled3/18/20143/18/20143/18/2014PPASS
DetailsDave Hannah
Routing - FIRE2/5/2014 2/6/2014 PASS
DetailsCraig D. Hanson
Report attached
Routing - PLAN CHECK2/6/2014 2/6/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/6/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/6/2014 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  2/6/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  2/6/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  2/6/2014 DONE
DetailsChristina Prado
Plan assigned to (TLW)1/28/2014 2/6/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/3/2014 2/5/2014 PASS
DetailsTim L. Woodard
Approved with deffered submittals on engineering of "Panel Claw" system. TLW
Plan resubmittals received  2/5/2014 DONE
DetailsTisha Gallop
received two copies of response and plan sheets A5 & E2; taken to Tim Woodard
Routing - PLAN CHECK1/28/2014 2/3/2014 FAIL
DetailsTim L. Woodard
Need engineering on "Panel Claw" system. TLW
Routing - FIRE2/3/2014 2/3/2014 FAIL
DetailsCraig D. Hanson
See Fire PLan 1st Review 02-03-14
1st review completed  2/3/2014 FAIL
Failed; Plan check, Fire
Application received 1/28/20141/28/2014 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  1/28/2014 DONE
DetailsChristina Prado
Intake Approval  1/28/2014 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  1/28/2014 DONE
DetailsChristina Prado