Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00171
StatusFinaled
Name GUHO CORP
Site Address 404 S 8TH ST Unit: 204
Project NameMercantile Bldg, Ste. 204 TI
Customer Number 
ePlanReviewYes
Description
(Mercantile Bldg Suite 204) (Vestibule)This permit is to construct a new 107 sf interior storefront creating a vestibule entrance into the existing suite. The existing fire doors on magnetic hold open devices with panic hardware will remain. The new entry consists of wall framing, double entry doors with panic hardware and a window with safety glazing next to the entry door. This space was suite 323 for the American Red Cross Certificate of Occupancy #10016. Entry into an existing tenant space. The fire sprinkler system is used to substitute for 1-hr fire-resistive construction of the building. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/11/201410/23/2014 DONE
This permit finaled on the web by Lisa Owen
Third Notice 9/3/201410/6/2014 DONE
mailed with letter to Guho Corp
Third Notice 7/14/20148/29/2014 DONE
mailed to Guho
Third Notice 6/14/20147/9/2014 DONE
mailed to Guho
Third Notice 4/30/20146/9/2014 DONE
mailed to Guho Corp
Second Notice 4/10/20144/25/2014 DONE
DetailsChristina Prado
First Notice3/25/20143/25/20143/31/2014 DONE
DetailsDave Hannah
mailed 4-1-14
BLD-Final3/24/20143/25/20143/25/2014APASS
DetailsDave Hannah
boyd - please call 1/2 hr prior so he can meet you there Phone #: ###-####
DOC - Permit Finaled3/25/20143/25/20143/25/2014PPASS
DetailsDave Hannah
FIRE-Final Inspection3/20/20143/20/20143/20/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in2/18/20142/19/20142/19/2014APASS
DetailsDave Hannah
Boyd Phone #: ###-####
Permit Ready to Issue  2/13/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  2/13/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  2/13/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)1/30/20141/30/20142/6/2014 DONE
DetailsAdele J Schaffeld-Griffin
1st review done
Routing - Addressing2/5/2014 2/5/2014 PASS
DetailsJason C. Taylor
PLANS/APPL TAKEN TO FRONT DESK  2/5/2014 DONE
DetailsTisha Gallop
1st review completed  2/4/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK1/30/2014 2/4/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing1/30/2014 2/3/2014 FAIL
DetailsJason C. Taylor
Jason failed in e plan
Routing - PUBLIC WORKS1/30/2014 1/30/2014 PASS
DetailsBeverly Mountain
Intake Approval  1/30/2014 PASS
DetailsAdele J Schaffeld-Griffin
Application received  1/28/2014 DONE
Application submitted via PDS Online on Jan 28 2014 1:06PM