Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-00197
StatusFinaled
Name MALLON CONSTRUCTION INC
Site Address 2650 N HEAVENS WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 3265 sq. ft., two story (first story 1520 sq. ft., second story 1745 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 500 sq. ft. of covered patio/porch and a 804 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/21/20147/22/20147/22/2014PPASS
DetailsTony Young
garage code is 6675 to gain access to the home. Phone #: ###-#### Inspection requested via web by Trudy Mallon
BLD-Final7/21/20147/22/20147/22/2014ADONE
DetailsTony Young
garage code is 6675 to gain access to the home. Phone #: ###-#### Inspection requested via web by Trudy Mallon
DOC - Permit Finaled7/22/20147/22/20147/22/2014PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval7/21/20147/21/20147/21/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Wall cover4/28/20144/28/20144/28/2014PPASS
DetailsTony Young
Interior sheet rock shear inspection Phone #: ###-#### >> Inspection requested via web by Trudy Mallon
BLD-Energy code compliance4/22/20144/24/20144/24/2014APASS
DetailsTony Young
phone number ###-#### on permit is incorrect**** the correct number for Mallon is ###-####****** framing inspection for pm Phone #: ###-#### >> Inspection requested via web by Trudy Mallon
BLD-Framing/Rough-in4/22/20144/22/20144/22/2014PPASS
DetailsTony Young
phone number ###-#### on permit is incorrect**** the correct number for Mallon is ###-####****** framing inspection for pm Phone #: ###-#### >> Inspection requested via web by Trudy Mallon
BLD-Wall Bracing4/10/20144/11/20144/11/2014APASS
DetailsTony Young
Tim Mallon Phone #: ###-####,, exterior shear ok
BLD-Foundation3/10/20143/10/20143/10/2014PPASS
DetailsTony Young
should be ready about 11:00 or so Phone #: ###-#### >> Inspection requested via web by Ben Sears
BLD-Foundation3/10/20143/10/20143/10/2014APART
DetailsTony Young
should be ready about 11:00 or so Phone #: ###-#### >> Inspection requested via web by Ben Sears,, work in progress
BLD-Footing3/7/20143/7/20143/7/2014APASS
DetailsTony Young
should be ready around 10:30 Phone #: ###-#### >> Inspection requested via web by Ben Sears
PubWorks Subgrade Approval3/6/20143/6/20143/6/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  2/27/2014 DONE
DetailsTisha Gallop
OVERRIDE  2/18/2014  
Plan assigned to (JG)1/31/20141/31/20142/18/2014 PASS
DetailsJavier Guzman
Due 2/18 L2 Hillside**
Routing - PLAN CHECK  2/18/2014 PASS
DetailsJavier Guzman
Javier Guzman
1st review completed  2/18/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  2/18/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/18/2014 DONE
Inspection Record Card- Bld  2/18/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  2/18/2014 DONE
DetailsTisha Gallop
Telephone call  2/18/2014 DONE
DetailsTisha Gallop
called Tim Mallon and left vm permit is ready and fee due.
Routing - FIRE2/6/2014 2/7/2014 PASS
DetailsScott Arellano
No comments.
Routing - MECHANICAL  2/6/2014 PASS
DetailsTroy James
Routing - Erosion and Sediment2/6/2014 2/6/2014 PASS
DetailsAndy J. Long
ESC plan submitted in form of SWPPP. SWPPP is complete and approved with valid PD and RP provided for project.
Route to Impact Fee Review1/30/20142/4/20142/5/2014 PASS
DetailsCindy M. Gould
Route to Impact Fee Review1/31/20142/3/20142/5/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING2/4/2014 2/4/2014 PASS
DetailsLeon Letson
Routing - PUBLIC WORKS2/3/2014 2/4/2014 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside2/3/2014 2/3/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - Addressing1/31/2014 2/3/2014 PASS
DetailsJason C. Taylor
Application received 1/30/20141/31/2014 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  1/31/2014 DONE
DetailsBarbara Stitt
Intake Approval  1/30/2014 PASS
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  1/30/2014 DONE
DetailsBarbara Stitt