Permit Information
Permit NumberBLD14-00203
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 10816 W FLORENCE DR
Project NameCordillera Development
Customer Number 
ePlanReviewNo
Description
(CORDILLERA DEVELOPMENT - BLDG 1) To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00288 Per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/2/201512/16/2016 DONE
This permit finaled on the web by Ami Tracy
First Notice7/9/20157/9/201512/16/2016 DONE
DetailsMike Jordan
This permit finaled on the web by Ami Tracy
Permanent Occupancy  7/23/2015 DONE
Zoning Approval7/22/20157/22/20157/22/2015 PASS
DetailsJosh Wilson
Telephone call  7/21/2015 DONE
contacted Daren-he will contact someone in the office and let them know what to do. Either extension or call in finals byt the 23rd
Temporary Occupancy7/20/201510/18/20157/20/2015 DONE
DetailsCandy A. Nichols
Telephone call  7/20/2015  
called Daren to let know temp c of o is close to expiring. He needs to ask for an extension or call in finals. Building is done but still need zoning-left message
BLD-Aging Inspection7/8/20157/8/20157/9/2015 PASS
DetailsMike Jordan
DOC - Permit Finaled7/9/20157/9/20157/9/2015PPASS
DetailsMike Jordan
Telephone call  4/20/2015 DONE
called Dave-no perm co until P & Z final has been done-he needs to request another extension on the temp co
BLD-Final4/9/20154/9/20154/9/2015PPASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Aging Inspection3/30/20153/30/20153/30/2015 PASS
DetailsMike Jordan
BLD-Aging Inspection1/26/20151/26/20151/27/2015 PASS
DetailsMike Jordan
PubWorks Occupancy Approval1/27/20151/27/20151/27/2015 DONE
DetailsTiffany Lowery
Temporary Occupancy1/14/20154/14/20151/14/2015 DONE
DetailsChristina Prado
Zoning Approval Temp12/3/201412/3/201412/3/2014 PASS
DetailsJosh Wilson
Ok for 180-day temp occ. Landscape and amenities bonds are in place. BND14-00037 and BND14-00074.
BLD-Final11/6/201411/6/201411/6/2014PPART
DetailsMike Jordan
Tyler Phone #: ###-####. 1hr. const. complete in riser room. ok for temp occ.
BLD-Final11/5/201411/6/201411/6/2014AFAIL
DetailsMike Jordan
Tyler Phone #: ###-####. Provide the required 1hr. construction in the fire riser rm.
FIRE-Final Inspection11/4/201411/5/201411/5/2014APASS
DetailsTroy Cobbley
Life safety passed. Building address to be mounted prior to the final inspection
PubWorks Temp Occupancy Appr9/23/20149/23/20149/23/2014 DONE
DetailsLori Flook
Brian Murphy signed off on Temp Occ
BLD-Energy code compliance9/9/20149/10/20149/10/2014PPASS
DetailsMike Jordan
Richard Phone #: ###-####
BLD-Framing/Rough-in9/9/20149/9/20149/9/2014PPASS
DetailsMike Jordan
Richard Phone #: ###-####
BLD-Wall Bracing8/15/20148/15/20148/15/2014PPASS
DetailsMike Jordan
Richard Phone #: ###-####. floor to floor straps ok.
BLD-Wall Bracing8/14/20148/14/20148/14/2014PNR
DetailsMike Jordan
Richard Phone #: ###-####
BLD-Wall Bracing8/11/20148/12/20148/12/2014APASS
DetailsMike Jordan
Richard Phone #: ###-####. Roof strapping ok.
BLD-Wall Bracing7/31/20147/31/20147/31/2014PPASS
DetailsPhil Shearer
Richard Phone #: ###-####
All exterior shear walls ok
BLD-Wall Bracing7/30/20147/30/20147/30/2014PPASS
DetailsPhil Shearer
Richard Phone #: ###-####
2nd floor exterior shear walls ok
BLD-Wall Bracing7/21/20147/21/20147/21/2014PNR
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Wall Bracing7/18/20147/18/20147/18/2014PPASS
DetailsMike Jordan
Ken Phone #: ###-####. 1st floor exterior shear walls and interior shear walls only ok.
BLD-Energy code compliance6/27/20147/1/20147/1/2014APASS
DetailsMike Jordan
Ashley Phone #: ###-####. rigid insulation, interior side of stemwaal under slab on grade.
BLD-Foundation6/25/20146/26/20146/26/2014PPASS
DetailsMike Jordan
Manual Phone #: ###-####
BLD-Footing6/25/20146/25/20146/25/2014PPASS
DetailsMike Jordan
Permit Ready to Issue  6/23/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  6/23/2014 DONE
DetailsCandy A. Nichols
CHANGE STATUS TO (FEE)  5/30/2014 DONE
DetailsSam Zahorka
CHANGE STATUS TO (REV)  5/23/2014 DONE
DetailsSam Zahorka
OVERRIDE  4/4/2014  
Plan assigned to (SRZ) 2/3/20144/4/2014 PASS
DetailsSam Zahorka
Pending others to PASS.
Routing - PUBLIC WORKS4/1/2014 4/4/2014 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design4/4/2014 4/4/2014 PASS
DetailsKyle S. Rosenmeyer
Routing - PLAN CHECK4/4/2014 4/4/2014 PASS
DetailsSam Zahorka
PRIOR TO ISSUANCE OF OCCUPANY FOR THE FIRST APARTMENT BUILDING, THE APPLICANT SHALL EITHER HAVE CONSTRUCTED THE AMENITIES (POOL/BATHROOM & CHANGING FACILITY) OR BOND FOR THIS AMENITY.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2014 DONE
DetailsSam Zahorka
Print Occupancy Form  4/4/2014 DONE
DetailsChristina Prado
Telephone call  4/4/2014 DONE
DetailsChristina Prado
called Brandon to oadvise permit is ready pending ACHD, RP & GC and gave fees due
Permit Ready to Issue  4/4/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK4/1/2014 4/1/2014 PASS
DetailsSam Zahorka
PRIOR TO ISSUANCE OF OCCUPANY FOR THE FIRST APARTMENT BUILDING, THE APPLICANT SHALL EITHER HAVE CONSTRUCTED THE AMENITIES (POOL/BATHROOM & CHANGING FACILITY) OR BOND FOR THIS AMENITY.
Routing - PLANNING3/25/2014 4/1/2014 PASS
DetailsSusan Riggs
PRIOR TO ISSUANCE OF OCCUPANY FOR THE FIRST APARTMENT BUILDING, THE APPLICANT SHALL EITHER HAVE CONSTRUCTED THE AMENITIES (POOL/BATHROOM & CHANGING FACILITY) OR BOND FOR THIS AMENITY.
Routing - Addressing3/25/2014 3/25/2014 PASS
DetailsJason C. Taylor
Routing - PLAN CHECK3/25/2014 3/25/2014 PASS
DetailsSam Zahorka
Routing - PUBLIC WORKS3/24/2014 3/25/2014 FAIL
DetailsConnie Baumgartner
Routing - PLANNING Land Div3/21/2014 3/24/2014 PASS
DetailsTodd Tucker
Routing - PLAN CHECK3/3/2014 3/20/2014 PASS
DetailsSam Zahorka
Routing - FIRE3/18/20143/18/20143/19/2014 PASS
DetailsCraig D. Hanson
No changes, See Fire Plan Report regarding "No Parking Fire Lane" signs.
Routing - PLUMBING3/18/2014 3/18/2014 PASS
DetailsBill VanDegrift
1)single service water to each building will require DCVA
2)provide water heater pan for 2nd floor water heaters.
Plan resubmittals received  3/14/2014 DONE
DetailsChristina Prado
Received two sets revised plan sheets marked a1.0, a1.1, a2.1, a5.2, s4.0, p1.0, p2.0 & p3.0 as well as one transmittal letter and two response letters;plans inserted by arch rep and taken to Sam for review
Routing Off Site - STRUCTURAL2/27/2014 3/6/2014 PASS
DetailsSam Zahorka
Route to Impact Fee Review1/31/20142/5/20143/5/2014 PASS
DetailsCindy M. Gould
Routing - FIRE2/28/2014 3/3/2014 PASS
DetailsCraig D. Hanson
See attached Fire Plan Review 03-03-14
1st review completed  3/3/2014 FAIL
Failed; PW, Planning, Addressing, Structural, Plan Check, Plumbing,
Routing - PLAN CHECK2/20/2014 2/28/2014 FAIL
DetailsSam Zahorka
Plan resubmittals received  2/25/2014 DONE
received response and three copies of structural calcs and plan sheets S1.0 & S2.0; taken back to Fire Review.
Routing - MECHANICAL2/21/2014 2/21/2014 PASS
DetailsTroy James
manual j reports attached to this permit only for the 14 buildings.
Routing - PLANNING2/19/2014 2/20/2014 FAIL
DetailsSusan Riggs
PUD13-00008
Routing - Design Review2/20/2014 2/20/2014 PASS
DetailsJosh Wilson
DRH13-00288
Routing - MECHANICAL2/14/2014 2/19/2014 FAIL
DetailsTroy James
emailed correction to applicant, architect and designer
Routing - PLUMBING2/14/2014 2/14/2014 FAIL
DetailsDaryl Spivey
1. Plumbing plans are required to be approved and stamped by an Idaho licensed engineer.
2. Plumbing plans not drawn to ISPC.
Routing - Erosion and Sediment2/12/2014 2/14/2014 PASS
DetailsAndy J. Long
SWPPP for entire project submitted and approved
Routing Off Site - STRUCTURAL1/31/2014 2/14/2014 FAIL
DetailsSam Zahorka
Routing PW Solid Waste  2/13/2014 PASS
DetailsPeter J. McCullough
Routing PW Drainage  2/12/2014 PASS
DetailsBrian Murphy
Routing PW Sewer Design2/10/2014 2/10/2014 FAIL
DetailsKyle S. Rosenmeyer
SSMH 585J11 required to have a pre-cast manhole base per ISPWC SD-501A.
Routing PW Sewer Rating2/10/2014 2/10/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing1/31/2014 2/7/2014 FAIL
DetailsJason C. Taylor
Parcel # needs updated. Address Incorrect
Pending Assignment by JCM1/31/2014 2/3/2014 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  1/31/2014 DONE
DetailsChristina Prado
Intake Approval  1/31/2014 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  1/31/2014 DONE
DetailsChristina Prado
Routing - PLANNING Land Div1/31/2014 1/31/2014 FAIL
DetailsTodd Tucker
ROS14-00001 needs finaled
Application received 1/31/2014