First Notice | | 8/2/2015 | 12/16/2016 | | DONE |
|
|
|
This permit finaled on the web by Ami Tracy
|
Permanent Occupancy | | | 7/23/2015 | | DONE |
|
|
|
|
Zoning Approval | 7/22/2015 | 7/22/2015 | 7/22/2015 | | PASS |
Josh Wilson
|
|
|
|
Temporary Occupancy | 4/24/2015 | 7/23/2015 | 4/24/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
PubWorks Occupancy Approval | 4/9/2015 | 4/9/2015 | 4/9/2015 | | DONE |
Brian Murphy
|
|
|
as per Brian Murphy final passed
|
BLD-Aging Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | | PASS |
Mike Jordan
|
|
|
|
Temporary Occupancy | 1/14/2015 | 4/14/2015 | 1/14/2015 | | DONE |
Christina Prado
|
|
|
|
PubWorks Temp Occupancy Appr | 1/14/2015 | 1/14/2015 | 1/14/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 1/13/2015 | 1/13/2015 | 1/13/2015 | | PASS |
Josh Wilson
|
|
|
Ok for 180-day temp occ. Landscape and amenities bonds are in place. BND14-00037 and BND14-00074.
|
Telephone call | | | 1/9/2015 | | DONE |
Candy A. Nichols
|
|
|
called and talked Darren-we need the Temp C of O. He said he's been in a few times to get it but we turn him away. I told him that he still needs P & Z to sign off on their final. I also told him that there could be some bondiong that needs taken care of. Once that is done we can issue the temp C of O. I told him this needed done ASAP because there should be no one living in the apartments until the temp c of o has been issued.
|
Telephone call | | | 1/9/2015 | | DONE |
Candy A. Nichols
|
|
|
called Darren back, told him we are working on the temp C of O's for him and that I'll get back with him on Monday Jan 12th.
|
BLD-Final | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PART |
Mike Jordan
|
|
|
Tyler Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning and public works signs perm.
|
BLD-Final | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | NR |
Mike Jordan
|
|
|
|
BLD-Final | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | NR |
Mike Jordan
|
|
|
tyler Phone #: ###-####
|
FIRE-Final Inspection | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | NR |
Mike Jordan
|
|
|
Tyler Phone #: ###-####. Needs fire/life/safety finals.
|
FIRE-Final Inspection | 11/21/2014 | 11/21/2014 | 11/21/2014 | P | CANC |
Troy Cobbley
|
|
|
Left voice messag on Tyler's phone that fire alarm and fire sprinkler permits have not been inspected/finaled yet and are needed prior to a fire life safety final.
|
BLD-Framing/Rough-in | 10/2/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Jim Sly
|
|
|
Richard Phone #: ###-####
|
BLD-Energy code compliance | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Jim Sly
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | FAIL |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Complete all draft stops in attic areas, repair the drholes in draft stop attic areas, complete all lateral bracing,Provide H2.5 on trusses at interior bearing walls at 2nd floor. Fireblock all furdowns, remove foam insulation from partwall penetrations and fire caulk. A tenting inspection for fire sprinklers is also required prior to energy code inspection. ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. floor to floor straps.
|
BLD-Wall Bracing | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. 2nd. floor interior shear walls ok.
|
BLD-Wall Bracing | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. remainder of 2nd. floor exterior shear walls ok.
|
BLD-Wall Bracing | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. 2nd. floor exterior shear walls ok.
|
BLD-Wall Bracing | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Phil Shearer
|
|
|
Richard Phone #: ###-#### 1st floor exterior shear walls OK. 2nd floor straping west side only OK
|
BLD-Wall Bracing | 8/20/2014 | 8/20/2014 | 8/20/2014 | P | PASS |
Phil Shearer
|
|
|
Richard Phone #: ###-#### Interior shear walls OK
|
BLD-Wall Bracing | 8/18/2014 | 8/19/2014 | 8/19/2014 | P | PASS |
Mike Jordan
|
|
|
richard Phone #: ###-####
|
BLD-Footing | 7/30/2014 | 7/30/2014 | 7/30/2014 | P | PASS |
Phil Shearer
|
|
|
Interior footings
|
BLD-Footing | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | CANC |
Jim Sly
|
|
|
Ken--around 11 please Phone #: ###-#### Canc By Contr.
|
BLD-Energy code compliance | 7/25/2014 | 7/25/2014 | 7/25/2014 | P | PASS |
Mike Jordan
|
|
|
Ashley Phone #: ###-####. rigid foam at stemwall under slab on grade.
|
BLD-Footing | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
Permit Ready to Issue | | | 6/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 6/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
CHANGE STATUS TO (FEE) | | | 5/30/2014 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (REV) | | | 5/23/2014 | | DONE |
Sam Zahorka
|
|
|
|
OVERRIDE | | | 4/4/2014 | | |
|
|
|
|
Plan assigned to (SRZ) | | 2/3/2014 | 4/4/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 4/1/2014 | | 4/4/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Design | 4/4/2014 | | 4/4/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 4/4/2014 | | 4/4/2014 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2014 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 4/4/2014 | | DONE |
Christina Prado
|
|
|
called Brandon to oadvise permit is ready pending ACHD, RP & GC and gave fees due
|
Permit Ready to Issue | | | 4/4/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 4/4/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 3/25/2014 | | 4/1/2014 | | PASS |
Susan Riggs
|
|
|
PRIOR TO ISSUANCE OF OCCUPANY FOR THE FIRST APARTMENT BUILDING, THE APPLICANT SHALL EITHER HAVE CONSTRUCTED THE AMENITIES (POOL/BATHROOM & CHANGING FACILITY) OR BOND FOR THIS AMENITY.
|
Routing - PLAN CHECK | 4/1/2014 | | 4/1/2014 | | PASS |
Sam Zahorka
|
|
|
PRIOR TO ISSUANCE OF OCCUPANY FOR THE FIRST APARTMENT BUILDING, THE APPLICANT SHALL EITHER HAVE CONSTRUCTED THE AMENITIES (POOL/BATHROOM & CHANGING FACILITY) OR BOND FOR THIS AMENITY.
|
Routing - Addressing | 3/25/2014 | | 3/25/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 3/25/2014 | | 3/25/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2014 | | 3/25/2014 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 3/21/2014 | | 3/24/2014 | | PASS |
Todd Tucker
|
|
|
|
Case Summary (BLD) | | | 3/20/2014 | | |
|
|
|
|
Routing - PLAN CHECK | 3/3/2014 | | 3/20/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLUMBING | 3/18/2014 | | 3/18/2014 | | PASS |
Bill VanDegrift
|
|
|
see bld14-00203
|
Plan resubmittals received | | | 3/14/2014 | | DONE |
Christina Prado
|
|
|
Received two sets revised plan sheets marked a1.0, a1.1, a2.1, a5.2, s4.0, p1.0, p2.0 & p3.0 as well as one transmittal letter and two response letters;plans inserted by arch rep and taken to Sam for review
|
Routing Off Site - STRUCTURAL | 2/27/2014 | | 3/6/2014 | | PASS |
Sam Zahorka
|
|
|
|
Route to Impact Fee Review | 1/31/2014 | 2/5/2014 | 3/5/2014 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 3/3/2014 | | FAIL |
|
|
|
Failed; Addressing, Plan Check, Structural, Planning, Plumbing, PW
|
Routing - FIRE | 2/28/2014 | | 3/3/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 03-03-14 attached to permit BLD14-00203
|
Routing Off Site - STRUCTURAL | 1/31/2014 | | 2/28/2014 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 2/20/2014 | | 2/28/2014 | | FAIL |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 2/25/2014 | | DONE |
|
|
|
received response and three copies of structural calcs and plan sheets S1.0 & S2.0; taken back to Fire Review.
|
Routing - MECHANICAL | | | 2/21/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/19/2014 | | 2/20/2014 | | FAIL |
Susan Riggs
|
|
|
PUD13-00008
OUTSTANDING ISSUES
BONDING FOR POOL AND CLUBHOUSE
ALL DITCHES MUST BE PIPED ON SITE
ROS MUST BE FINALED
|
Routing - Design Review | 2/20/2014 | | 2/20/2014 | | PASS |
Josh Wilson
|
|
|
DRH13-00288
|
Routing - PLUMBING | 2/14/2014 | | 2/14/2014 | | FAIL |
Daryl Spivey
|
|
|
1. Plumbing plans are required to be approved and stamped by an Idaho licensed engineer.
2. Plumbing plans not drawn to ISPC.
|
Routing - Erosion and Sediment | 2/12/2014 | | 2/14/2014 | | PASS |
Andy J. Long
|
|
|
SWPPP for entire project submitted and approved
|
Routing PW Solid Waste | | | 2/13/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | | | 2/12/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 2/10/2014 | | 2/10/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
SSMH 585J11 required to have a pre-cast manhole base per ISPWC SD-501A.
|
Routing PW Sewer Rating | 2/10/2014 | | 2/10/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCM | 1/31/2014 | | 2/3/2014 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/31/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/31/2014 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/31/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING Land Div | 1/31/2014 | | 1/31/2014 | | FAIL |
Todd Tucker
|
|
|
ROS14-00001 NEEDS FINALED
|
Application received | | 1/31/2014 | | | |
|
|
|
|
Routing - Addressing | 1/31/2014 | | | | FAIL |
Jason C. Taylor
|
|
|
Parcel # needs updated. Address Incorrect
|