Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD14-00224
StatusFinaled
Name DAVE ALLEN CONSTRUCTION
Site Address 9306 W OVERLAND RD
Project NameCWI - Lynx Career Center
Customer Number 
ePlanReviewYes
Description
(CWI)(LYNX CAREER CENTER)Plan modification approved 4/29/14 ajs Tenant Improvement for College of Western Idaho in the first floor space of the existing Lynx Building. The tenant space is 4118 s.f. of existing office space. The second exit from this space shall open with a single motion. Demo per approved plans. This interior project consists of new space configurations and minor cabinetry, portions of new ceiling grid. New nonbearing partition walls for a total of 11 Advisor rooms, 2 offices, 1 conference room, 2 ADA restrooms, 1 break room, 1 work room, 1 comm room. The One Stop and Career Center areas are calculated at 1/15 as it is over 750sq ft per policy for occupant load. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/25/20148/26/2014 DONE
First Notice 7/3/20147/15/2014 DONE
Faxed 7-15-14
Permanent Occupancy  6/23/2014 DONE
BLD-Final6/20/20146/20/20146/20/2014PPASS
DetailsMike Jordan
Jim Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection6/19/20146/20/20146/20/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in5/2/20145/2/20145/2/2014APASS
DetailsMike Jordan
ok to cover.
BLD-Framing/Rough-in5/1/20145/1/20145/1/2014PPART
DetailsMike Jordan
jim Phone #: ###-####. No approved plans on site. reviewed plan that was on site and inspected the interior non bearing steel stud walls. ok to on side and insulate only. Contractor to call another framing inspection for friday in the am and will review approved plans prior to cover.
CHANGE STATUS TO (ISS)  5/1/2014 DONE
Plan assigned to (AJS)4/24/20144/24/20144/29/2014 PASS
DetailsAdele J Schaffeld-Griffin
waiting on plan mod to be uploaded
PLANS/APPL TAKEN TO FRONT DESK  4/29/2014 DONE
Routing - PLAN CHECK4/23/2014 4/29/2014 PASS
DetailsAdele J Schaffeld-Griffin
plan modification
Permit Ready to Issue  4/24/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/24/2014 DONE
DetailsChristina Prado
Print Occupancy Form  4/24/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)4/23/20144/23/20144/23/2014 PASS
DetailsAdele J Schaffeld-Griffin
Ron requested plan mod - permits not issued yet so no need for plan mod app
Plan Modification Accepted  4/23/2014 DONE
DetailsTisha Gallop
plan mod workflow started for misc arch, elec, mech changes to tenant space
PLANS/APPL TAKEN TO FRONT DESK  4/23/2014 DONE
Plan assigned to (AJS)2/3/20142/3/20143/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed CWIRout to addressing and PW
Routing - PLAN CHECK3/7/2014 3/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/7/2014 DONE
Routing - PLAN CHECK2/3/2014 2/4/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan will need to route to PW when re submitted
1st review completed  2/4/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Intake Approval  2/4/2014 PASS
DetailsAdele J Schaffeld-Griffin
Application received  2/1/2014 DONE
Application submitted via PDS Online on Feb 1 2014 10:16AM