Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-00245
StatusFinaled
Name AERO CONSTRUCTION
Site Address 8649 W OVERLAND ROAD
Project NameDutch Bros Coffee
Customer Number 
ePlanReviewYes
Description
(DUTCH BROS COFFEE) Permit for the construction od a 440 sq. ft. drive-thru coffee house with related site improvements including paving lanscaping and parking areas. All work per the approved plans. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/8/201411/25/2014 DONE
DetailsChristina Prado
Second Notice 10/16/201411/3/2014 DONE
First Notice 8/25/201410/6/2014 DONE
DetailsCandy A. Nichols
sent in mail 10-6-14
PubWorks Occupancy Approval9/25/20149/25/20148/15/2014 DONE
Brian Murphy inspected.
Zoning Approval8/15/20148/15/20148/15/2014 PASS
DetailsSarah Schafer
Passed both zoning and design review inspection. Requested an "as built" landscape plan as trees were moved and additional vegetation was added.
Permanent Occupancy  8/15/2014 DONE
DetailsCandy A. Nichols
as per Bill Vandegrift ok to issue C of O with out the back flow final. It will be done next week
BLD-Final8/13/20148/14/20148/14/2014PPASS
DetailsJim Storey
eric Phone #: ###-####
FIRE-Final Inspection8/13/20148/14/20148/14/2014APASS
DetailsForrest France
Life safety inspection passed.
BLD-Ceiling Grid Inspection7/31/20147/31/20147/31/2014PPASS
DetailsJim Sly
Eric Phone #: ###-####
BLD-Ceiling Grid Inspection7/15/20147/16/20147/16/2014ANR
DetailsMike Jordan
Aaron Phone #: ###-####. Needs trades first.
BLD-Framing/Rough-in7/7/20147/7/20147/7/2014PPASS
DetailsMike Jordan
Aaron-please go as close to 10 as possible Phone #: ###-####
BLD-Energy code compliance7/7/20147/7/20147/7/2014PPASS
DetailsMike Jordan
Aaron-please go as close to 10 as possible Phone #: ###-####
BLD-Framing/Rough-in7/2/20147/3/20147/3/2014PFAIL
DetailsMike Jordan
Eric Phone #: ###-####. Install additionalsquash blocking under 2ply girder truss. Install missing blocking on south shear wall. Justify missing bearing points at North A1 gable end truss. Review truss engineering for additional purlins not installed. Provide addition (2) 2x6 studs entire length of south A1 gable truss,attach to blocking and truss chords w/ 16D nails as per detail 7 A2.1. Provide web stiffmers with simpson DTC to interior wall per detail 8 A2.1. Correction notice posted.
BLD-Foundation5/6/20145/6/20145/6/2014PPASS
DetailsTom Arcoraci
Rob Phone #: ###-####
BLD-Footing5/2/20145/2/20145/2/2014PPASS
DetailsMike Jordan
eric Phone #: ###-####
Permit Ready to Issue  4/24/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  4/24/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  4/24/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  4/24/2014 DONE
DetailsCandy A. Nichols
Routing Off Site - STRUCTURAL4/21/2014 4/21/2014 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK4/21/2014 4/21/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/21/2014 DONE
Plan assigned to (CDM)2/19/2014 4/21/2014 PASS
DetailsCarl D Madsen
Routing PW Drainage4/9/2014 4/9/2014 PASS
DetailsBrian Murphy
Routing - PLANNING4/8/2014 4/8/2014 PASS
DetailsDavid Moser
Routing - PLUMBING4/8/2014 4/8/2014 PASS
DetailsDaryl Spivey
Provide RPBP on filtered water system.
PVC not an apprioved material for potable water inside of building as noted on note 24.
Grease intercepter not installed per public works.
1st review completed  3/19/2014 FAIL
Routing - PLAN CHECK2/19/2014 3/19/2014 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL2/19/2014 3/19/2014 FAIL
DetailsCarl D Madsen
Routing PW Environmental2/20/2014 3/19/2014 PASS
DetailsWalt Baumgartner
Routing - PLANNING2/19/2014 3/18/2014 FAIL
DetailsDavid Moser
Applicant needs to complete ROS14-00013
Routing - Design Review3/18/2014 3/18/2014 PASS
DetailsJosh Wilson
Ok per DRH14-00046
Routing - PLANNING Land Div2/19/2014 2/24/2014 PASS
DetailsDave Abo
Lot 3, Block 2 of Calderwood West Subdivision
Routing PW Sewer Design2/20/2014 2/24/2014 PASS
DetailsKyle S. Rosenmeyer
Routing PW Sewer Rating2/20/2014 2/21/2014 PASS
DetailsConnie Baumgartner
Routing - PLUMBING2/21/2014 2/21/2014 FAIL
DetailsDaryl Spivey
Public works grease abatement not requiring a grease intercepter. Resubmit showing changes to plumbing.
Routing PW Solid Waste2/20/2014 2/20/2014 PASS
DetailsPeter J. McCullough
Routing - PUBLIC WORKS2/19/2014 2/20/2014 PASS
DetailsBeverly Mountain
Routing - FIRE2/19/20142/19/20142/19/2014 PASS
DetailsScott Arellano
No report, subject to field inspection.
Routing - Erosion and Sediment2/19/2014 2/19/2014 PASS
DetailsAndy J. Long
ESC plan and narrative submitted and approved. Valid PD and RP provided.
Route to Impact Fee Review2/19/2014 2/19/2014 PASS
DetailsCindy M. Gould
Routing - Addressing2/19/2014 2/19/2014 PASS
DetailsEmily Dixon
Intake Approval  2/13/2014 PASS
There were problems with loading the drawing files. Only a portion of the drawings would load. The rest would be blank. After conciderable effort, the drawings appear to have loaded properly.
Intake Approval  2/11/2014 FAIL
The drawings evidently did not upload properly. Several drawings are blank. Other drawings appear to have had some layers turned off. Probably should delete all drawings and start over. All sheets need to be stamped and signed by the Architect or applicable Engineer. All sheets need to be oriented properly.
Application received  2/4/2014 DONE
Application submitted via PDS Online on Feb 4 2014 4:07PM
Pending Assignment by JCM2/19/2014    
DetailsCarl D Madsen
Routing PW Drainage2/20/2014   FAIL
DetailsBrian Murphy
work over property line