Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00251
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1055 N CURTIS RD
Project NameST ALS- SOUTH TOWER 1st Floor
Customer Number 
ePlanReviewNo
Description
(SARMC – South Tower – 1st Floor) Permit is to remodel an existing office / consult area on the first floor. PLAN MODIFICATION 4-1-14 – Modification submitted to change shower access to existing, re-orient small conference room, enlarge break room with new door to hall, change reading room to exam room, and split space by putting wall across hall.**TLW** Work includes: construction of new interior non-bearing walls to create one consult area, 7 film reading stations, a reading room, and a new unisex restroom / shower room, new electrical, new plumbing, new mechanical and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/7/20151/15/2015 DONE
Third Notice 12/6/20141/2/2015 DONE
Second Notice 11/13/201412/1/2014 DONE
DetailsChristina Prado
First Notice 10/16/201411/3/2014 DONE
Permanent Occupancy  10/6/2014 DONE
DetailsCandy A. Nichols
BLD-Final10/2/201410/3/201410/3/2014PPASS
DetailsMike Jordan
Pete kilpatrick Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
FIRE-Final Inspection10/2/201410/3/201410/3/2014APASS
DetailsTroy Cobbley
life safety passed
BLD-Ceiling Grid Inspection9/22/20149/23/20149/23/2014APASS
DetailsMike Jordan
Phase II ceiling grid inspection Phone #: ###-#### Inspection requested via web by Chris Jackson
BLD-Framing/Rough-in8/28/20148/28/20148/28/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Peter Kilpatrick. interior steel stud framed walls ok.
FIRE-Final Inspection7/9/20147/10/20147/10/2014APART
DetailsTroy Cobbley
Life safety passed for the Radiology Area (Phase I)
BLD-Ceiling Grid Inspection7/2/20147/3/20147/3/2014APASS
DetailsJim Sly
Please call before inspection. Phone #: ###-#### >> Inspection requested via web by Chris Jackson
Radiology room OK.
Issue PAID IN FULL permit  5/19/2014 DONE
DetailsBarbara Stitt
Application received 2/6/20145/7/2014 DONE
Telephone call  5/7/2014 DONE
DetailsTisha Gallop
called Sam Burrows and left vm modified plans approved, no additional fees for modification. Still need original fees and GC.
Routing - PLAN CHECK4/3/2014 5/6/2014 PASS
DetailsTim L. Woodard
Case Summary (BLD)  5/6/2014 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)3/26/2014 5/6/2014 PASS
DetailsTim L. Woodard
Routing - FIRE4/1/2014 4/3/2014 PASS
DetailsCraig D. Hanson
No report for MOD
Routing - PLAN CHECK3/26/2014 4/1/2014 PASS
DetailsTim L. Woodard
Plan Modification Accepted  3/26/2014  
Plan modification accepted to change the shower access, re-orient a small conference room, enlarge a break room, change reading room to exam room, split a space with a new wall. Supmitted 2 copies of the following sheets-A0..1, A2.0, A2.1, A3.0, A7.0, M0.0, M1.1, P1.1, E0.0, E2.10, E2.1F, E2.1L, E2.1P, E2.1S, E3.0 with no change in value given.
Plan assigned to (TLW)2/10/2014 3/10/2014 PASS
DetailsTim L. Woodard
SARMC South Tower 1st floor
Routing - PLAN CHECK2/18/2014 3/10/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/10/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/10/2014 DONE
DetailsTim L. Woodard
Print Occupancy Form  3/10/2014 DONE
DetailsTisha Gallop
Telephone call  3/10/2014 DONE
DetailsChristina Prado
called Sam to advise permit is ready and gave fees due
Permit Ready to Issue  3/10/2014 DONE
DetailsChristina Prado
Plan resubmittals received  3/3/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked A0.1, A2.1, A3.0 & A7.0 as well as one response letter;Plans taken to Tim Woodard for further review
1st review completed  2/18/2014 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS2/14/2014 2/18/2014 PASS
DetailsConnie Baumgartner
Routing - Addressing2/18/2014 2/18/2014 PASS
DetailsJason C. Taylor
Routing PW Sewer Rating2/18/2014 2/18/2014 PASS
DetailsConnie Baumgartner
Routing - FIRE2/12/2014 2/13/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Report 02-13-14
Routing - PLAN CHECK  2/12/2014 FAIL
DetailsTim L. Woodard
Refer to Plan Review Report. TLW
Plan assigned to (AJS) 2/6/20142/10/2014 DEFR
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  2/6/2014 DONE
DetailsChristina Prado
Intake Approval  2/6/2014 PASS
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  2/6/2014 DONE
DetailsChristina Prado