Telephone call | | | 7/9/2015 | | DONE |
|
|
|
Talked to John- he said Armour Auction never moved into building so he wants us to just let permit expire
|
BLD-Conference | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | DONE |
Mike Jordan
|
|
|
john - call 30 mins prior Phone #: ###-####. Correct all life/safety items from life/safety inspection, provide lever hardware at warehouse exit, repair damaged grid ceiling. Also needs to provide evidence that apermit was pulled for the mezzanine that was constructed. Current building classification is type IIB construction. The constructed mezzanine does not meet this criteria. Also noted racking over 8ft. tall that has been installed as well.
|
FIRE-Final Inspection | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | FAIL |
Troy Cobbley
|
|
|
Repair the fire alarm system/provide verification that the system is monitored, install all ceiling tile, remove dead bolt at office, remove exit sign by fire sprinkler riser, provide fire extinguisher with current tag on the mezzanine, provide/repair all exit signs/emergency lights (see approved plans), provide racking permit or contact scott arellano with removal timeline.
|
BLD-Final | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####
|
Routing - FIRE | 2/20/2014 | 2/20/2014 | 2/26/2014 | | PASS |
Craig D. Hanson
|
|
|
No plan review performed with this Occupancy Evaluation Request. Final approval will be subject to satisfactory evaluation of the building in accordance with the building officials conditions of approval.
|
Plan assigned to (AJS) | 2/6/2014 | 2/6/2014 | 2/26/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Armor Auction
|
Case Summary (BLD) | | | 2/26/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2014 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2014 | | DONE |
Christina Prado
|
|
|
called John to advise permit is ready for pick up
|
Permit Ready to Issue | | | 2/26/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 2/26/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 2/26/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/20/2014 | | 2/20/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | | 2/6/2014 | 2/10/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
There was not enough information to route this project to fire for review. I will route to fire when information if recieved. 2/10/14 ajs
|
1st review completed | | | 2/10/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed Devin and Roger plan review comments
|
Routing - PLAN CHECK | 2/10/2014 | | 2/10/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/6/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/6/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 2/6/2014 | | | |
|
|
|
|