Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-00258
StatusFinaled
Name ASIN GENERAL CONTRACTORS
Site Address 3123 S BOWN WY
Project NameState Farm Insurance
Customer Number 
ePlanReviewYes
Description
(STATE FARM INSURANCE)(1st story) Minor tenant improvement permit to install nonbearing walls, doors, millwork, fixtures etc. as indicated on plan. New floor plan will include 1 (E) meeting room, 1 (E) office, 1 (E) mechanical room; open office space, 2 new staff rooms, 1 new break room, 1 existing ADA restroom, 1 existing storage room. Interior finish shall be per chapter 8, IBC. This space was previously occupied under BLD08-02445. The fire sprinkler system is used for code trade-offs, story increase, and for fire flow. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/10/20144/4/2014 DONE
DetailsChristina Prado
completed 4-4-14
First Notice 3/24/20143/31/2014 DONE
DetailsChristina Prado
mailed 4-1-14
BLD-Final3/13/20143/14/20143/14/2014APASS
DetailsJim Storey
Todd Phone #: ###-####
Permanent Occupancy  3/14/2014 DONE
DetailsChristina Prado
BLD-Final3/12/20143/13/20143/13/2014PFAIL
DetailsJim Storey
Todd Phone #: ###-#### lever hardware on two doors/ saftey glazing within 24 inches of door.
FIRE-Final Inspection3/12/20143/13/20143/13/2014APASS
DetailsForrest France
Fire life safety is satisfactory pending current certification at the existing fire extinguisher, door hardware per plan note at the new office partitions.
BLD-Framing/Rough-in2/21/20142/24/20142/24/2014PPASS
DetailsJim Storey
Please call Scott if you have any questions. Phone #: ###-#### >> Inspection requested via web by Scott Asin
Plan assigned to (AJS)2/10/20142/10/20142/19/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed State Farm Dur 2/14
Routing - PLAN CHECK2/19/2014 2/19/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/19/2014 DONE
Permit Ready to Issue  2/19/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  2/19/2014 DONE
DetailsTisha Gallop
Print Occupancy Form  2/19/2014 DONE
DetailsTisha Gallop
Routing - PLAN CHECK2/10/2014 2/14/2014 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  2/14/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Rating2/12/2014 2/13/2014 PASS
DetailsConnie Baumgartner
signed off in e plan
Routing - PUBLIC WORKS2/10/2014 2/12/2014 PASS
DetailsBeverly Mountain
Intake Approval  2/10/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing2/10/2014 2/10/2014 PASS
DetailsEmily Dixon
Intake Approval  2/7/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Mark, there are no plans in the drawing folder and the only document is the application that our permit techs upload. Can you please re upload the project. If you are having any trouble please contact Alex at ###-####

Thank you
Application received  2/6/2014 DONE
Application submitted via PDS Online on Feb 6 2014 4:05PM