Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00272
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 940
Project NameBabcock Design Group Suite 940
Customer Number 
ePlanReviewYes
Description
(BABCOCK DESIGN GROUP)(SUITE 940)The fire sprinkler system is used for high-rise. This project is a tenant improvement for Babcock Design Group on the 9th floor of the 8th and main building. The project will consist of open office space, conference room, library, and work room. Mechanical, electrical, and plumbing will be part of the tenant improvement to build out the suite. Scope of work includes nonbearing noncombustible partition walls, heavy duty suspended ceiling grid. There are 2 walls that are being constructed under this project in the hallway that limit access around the core of the building. These walls will need to be reevaluated when future tenant spaces are submitted. All high-rise fire and life safety systems must also be installed and operational before occupancy. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/9/2015 DONE
Third Notice 1/11/20152/2/2015 DONE
Third Notice 11/12/201412/1/2014 DONE
Third Notice 9/3/201411/3/2014 DONE
e-mailed to Adam Johnson @ ESI
Second Notice 7/27/20148/29/2014 DONE
e-mailed to Adam Johnson at ESI
First Notice 6/23/20147/17/2014 DONE
Faxed 7-17-14
BLD-Final6/12/20146/13/20146/13/2014PPASS
DetailsDave Hannah
Final BLD inspection for Babcock T.I. . Call Adam for any access needs ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection6/12/20146/13/20146/13/2014APASS
DetailsDave Hannah
Final Ceiling sign off request for Babcock, exit corridor. Call Adam for any access needs ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection6/12/20146/13/20146/13/2014PPASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  6/13/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  6/12/2014 DONE
DetailsBarbara Stitt
BLD-Ceiling Grid Inspection6/6/20146/9/20146/9/2014APEND
DetailsDave Hannah
Ceiling cover inspection for access cooridor outside babcock t.i. space. Please let me know if you have any questions, or need assistance for access. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to layin bourders
BLD-Ceiling Grid Inspection5/30/20146/2/20146/2/2014APASS
DetailsDave Hannah
Bob Ledford Phone #: ###-####
BLD-Framing/Rough-in4/1/20144/1/20144/2/2014PPASS
DetailsDave Hannah
Follow up to yesterdays walk with FCS and Dave Hannah. This request for formal sign off for framing cover on this TI. Thanks AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in3/31/20143/31/20143/31/2014PPASS
DetailsDave Hannah
Jeff Russell Phone #: ###-####
Fees Due Hold3/22/2014 3/26/2014 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  3/20/2014 DONE
DetailsBarbara Stitt
Print Occupancy Form  3/20/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  3/19/2014 DONE
Plan assigned to (AJS)2/18/20142/18/20143/10/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 3/18 Level 3 TI - ePlanReview - Babcock Design Group
Routing - Addressing3/10/2014 3/10/2014 PASS
DetailsEmily Dixon
Routing - PLAN CHECK3/10/2014 3/10/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/10/2014 DONE
1st review completed  3/4/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK2/18/2014 3/4/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Rating2/18/2014 2/21/2014 PASS
DetailsConnie Baumgartner
Plan Reviewer's activity  2/21/2014 DONE
DetailsJason Blais
ACHD impact fees not required. Received email from Christy Little of ACHD.
Routing - FIRE2/18/20142/18/20142/19/2014 PASS
DetailsScott Arellano
See attached report
Plan Reviewer's activity  2/18/2014 DONE
DetailsJason Blais
Emailed architect representative to contact ACHD for evaluation of any additional impact fees due. Written verification from ACHD is required to be provided to our Permit Counter prior to issuance of the building permit.
Routing - Addressing2/18/2014 2/18/2014 FAIL
DetailsJason C. Taylor
No suite number?
Routing - PUBLIC WORKS2/18/2014 2/18/2014 PASS
DetailsBeverly Mountain
Intake Approval  2/18/2014 PASS
DetailsJason Blais
Prescreen approved on 2/11/14 by Adele Schaffeld-Griffin. Plan Review Fees paid on 2/18/14.
Intake Approval  2/11/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Please rename the drawing file sheets pre the standrd naming convention in teh electronic plan submittal standards.
For example G.0 Cover sheet

Thank you
Application received  2/7/2014 DONE
Application submitted via PDS Online on Feb 7 2014 2:52PM
Pending Assignment by JCB2/18/2014    
DetailsJason Blais