Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-00281
StatusFinaled
Name DYNAMIC CONSTRUCTION & REMODEL
Site Address 4129 N MTN VIEW RIM LN
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the remodel to and the addition of 515s.f. of living space to an existing 2230s.f. single family dwelling. the project will include a new office/bedroom area, bathroom and mudroom area accessed from the garage and kitchen area. there is to be a covered patio of 109s.f. off of the new bedroom/office and 63s.f. of new master closet area. Separate electrical, plumbing, mechanical and ESC permits are required. R-1C ok per Leon Letson. All per the approved palns as marked and the plan review notes. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946 pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20146/17/20146/17/2014PPASS
DetailsTom Arcoraci
Kelly Phone #: ###-####
DOC - Permit Finaled6/17/20146/17/20146/17/2014PPASS
DetailsTom Arcoraci
BLD-Final5/27/20145/27/20145/27/2014PPEND
DetailsTom Arcoraci
Kelly Phone #: ###-#### needs gaurd rail hand rail on patio all other items ok
BLD-Framing/Rough-in4/7/20144/8/20144/8/2014APART
DetailsTom Arcoraci
Kelly Phone #: ###-####
BLD-Framing/Rough-in3/31/20143/31/20143/31/2014PPART
DetailsTom Arcoraci
kelly Phone #: ###-#### east side ok
BLD-Foundation3/6/20143/6/20143/6/2014PPASS
DetailsTom Arcoraci
Dave Phone #: ###-####
BLD-Footing3/4/20143/5/20143/5/2014APASS
DetailsTom Arcoraci
pouring at 10:30 - dave Phone #: ###-####
PubWorks Subgrade Approval3/3/20143/3/20143/3/2014 DONE
DetailsJason C. Taylor
NOTE: PLEASE CHECK CURRENT STRUCTURAL CALS FOR REVISED FOOTING DETAILS. ***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Conference2/25/20142/26/20142/26/2014ACANC
DetailsTom Arcoraci
Kelly Phone #: ###-#### // cancelled per Kelly, did not reschedule at this time. I called inspector to notify him it was canelled 2/26/14 8:38am//leg
Routing Walk-In (BLD)2/26/20142/26/20142/26/2014APASS
DetailsJavier Guzman
Added to case summary notes from hilside review of request for geotech report that is needed for site
Case Summary (BLD)  2/26/2014 DONE
OVERRIDE  2/10/2014  
Routing Walk-In (PW Hillside)2/10/20142/10/20142/10/2014PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)2/10/20142/10/20142/10/2014PDONE
DetailsLeon Letson
Routing Walk-In (BLD)2/10/20142/10/20142/10/2014PDONE
DetailsCarl D Madsen
Plan assigned to (PEP)2/10/20142/10/20142/10/2014 PASS
DetailsCarl D Madsen
Inspection Record Card- Bld  2/10/2014  
1st review completed  2/10/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/10/2014 DONE
Permit Ready to Issue  2/10/2014 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  2/10/2014 DONE
DetailsChristina Prado
Application received 2/10/2014