Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-00282
StatusFinaled
Name EVERGREEN HOMES INC
Site Address 353 E MYRTLE ST
Project NameTrevor's Trek Cancer Pavilion
Customer Number 
ePlanReviewNo
Description
"Trevor's Trek Cancer Pavilion" (PLAN MODIFICATION TO CHANGE THE SLAB/FOUNDATIOND DESIGN) Permit for the construction of a new 420 sq. ft. gazebo per the approved plans in conjunction with an accessible route and parking to serve tyhe new pavillion. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/20/20156/12/2015 DONE
This permit finaled on the web by Chris Laraway
First Notice5/18/20155/18/20156/10/2015 DONE
DetailsDave Hannah
Mailed out 6-10-15
BLD-Final5/15/20155/18/20155/18/2015APASS
DetailsDave Hannah
Final on steel Pavilion Structure on the East side of Julia Davis Park, on the pond edge. Phone #: ###-#### Inspection requested via web by Chris Laraway
DOC - Permit Finaled5/18/20155/18/20155/18/2015PPASS
DetailsDave Hannah
FIRE-Final Inspection5/15/20155/15/20155/15/2015PPASS
DetailsKatie Marron
Life safety pass.
BLD-Conference5/15/20155/15/20155/15/2015PCANC
DetailsDave Hannah
Final inspection for an open steel Pavilion Structure on the East Side of Julia Davis Park, on the Pond. Phone #: ###-#### >> Inspection requested via web by Chris Laraway Inspection cancelled from web by: Chris Laraway
BLD-Final5/14/20155/15/20155/15/2015APART
DetailsJim Storey
Please call first to determine final inspection requirements for this project. Toby Norton of Boise Park ; Rec has signed off on the project. Phone #: ###-#### Inspection requested via web by Chris Laraway need fir insp.
CHANGE STATUS TO (ISS)  2/19/2015 DONE
OVERRIDE  2/9/2015  
Plan assigned to (CDM)1/9/20151/9/20152/9/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/9/2015 2/9/2015 PASS
DetailsCarl D Madsen
Telephone call  2/9/2015 DONE
DetailsCandy A. Nichols
called Chris-left message-he is the GC and he turned the plan mod in to us so all he needs to do is pay the the new fee-do not re-issue
Routing Off Site - STRUCTURAL2/5/2015 2/9/2015 PASS
DetailsCarl D Madsen
Case Summary (BLD)  2/9/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/9/2015 DONE
Print Occupancy Form  2/9/2015 DONE
Permit Ready to Issue  2/9/2015 DONE
GC Form is in Application. DO NOT RE-ISSUE. Revised Cert. of Value?? this is a plan mod, GC form is attached in the bld permit app and there are no rev cert of val required because the GC turned the plan mod into us CAN
Plan resubmittals received  2/3/2015 DONE
DetailsChristina Prado
Received three sest of revised structural calcs and plans marked SE001,SB101, SB501 & SB601;Plans stamped and taken to Carl Madsen for review
Routing Off Site - STRUCTURAL1/12/2015 1/14/2015 FAIL
DetailsCarl D Madsen
E-mailed structural comments to Chris Laraway 1-14-15 CDM
Telephone call  1/12/2015 DONE
called action couriers for pick up
Plan Modification Accepted  1/9/2015 DONE
DetailsChristina Prado
Received plan mod application for structural changes to approved plans. Received three sets revised plan sheets, structural calcs & special inspection forms; Plans take =n to Carl Madsen for further review
Issue PAID IN FULL permit  9/8/2014 DONE
DetailsChristina Prado
OVERRIDE  9/4/2014  
Telephone call  9/4/2014 DONE
DetailsCandy A. Nichols
called Chris to let know the permit is ready and how much is owed. Also told him needed the ACHD letter or receipt
Print Occupancy Form  9/4/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  9/4/2014 DONE
DetailsCandy A. Nichols
Routing Off Site - STRUCTURAL8/25/2014 9/3/2014 PASS
DetailsCarl D Madsen
received approval letter.
Routing - PLAN CHECK9/3/2014 9/3/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/3/2014 DONE
Case Summary (BLD)  9/3/2014 DONE
Plan assigned to (CDM)3/4/2014 9/3/2014 PASS
DetailsCarl D Madsen
First review completed. - Trevor's Trek
Extend Review Timeline  8/25/2014 DONE
DetailsJason Blais
Telephone call  8/25/2014 DONE
Left a message for Toby at parks to check on the disposition of resubmittals for the engineering requested by the outsource engineers. 8-25-14 CDM
Plan resubmittals received  8/25/2014 DONE
DetailsChristina Prado
Received three sets of revised plan sheets marked S101 & S201 as well as one response letter and three sets of revised structural calcs; Plans stamped and taken to Carl for review
Plan resubmittals received  8/21/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked L1 1 of 1, two sets of stamped engineering sheets marked 1, four sets of Special Inspections workdeet #310 and two sets of response letter; Plans taken to Carl Madsen for review
Routing Off Site - STRUCTURAL8/1/2014 8/19/2014 FAIL
DetailsCarl D Madsen
Sent structural review comments to Toby Norton and Chris Laraway. CDM
Routing - PLAN CHECK3/14/2014 8/1/2014 FAIL
DetailsCarl D Madsen
The 1st 4 items on the plan review report have not been addressed. CDM
Plan resubmittals received  7/31/2014 DONE
DetailsCandy A. Nichols
received 2 of each:calcs, struc. calcs, plans (sheet #) CS, 1, 2, 2.1, 3, 3.1, 4, 4.1, 4.2, 5, 5.1, 5.2, 6, 6.1, & 6.2 - 2 set of: S101, S201, Took to Carl Madsen
Route to Impact Fee Review6/19/20146/24/20146/20/2014 PASS
DetailsCindy M. Gould
Routing - FIRE 3/4/20143/14/2014 PASS
DetailsCraig D. Hanson
No report
1st review completed  3/14/2014 FAIL
Routing - PLAN CHECK  3/13/2014 FAIL
DetailsCarl D Madsen
An accessible route is required to the structure. CDM
Routing - Erosion and Sediment3/5/2014 3/7/2014 PASS
DetailsAndy J. Long
ESC plan submitted and approved. Need to designate valid RP before ESC permit may be issued.
Routing PW Sewer Rating3/5/2014 3/5/2014 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div3/4/2014 3/5/2014 PASS
DetailsTodd Tucker
Routing - Addressing3/5/2014 3/5/2014 PASS
DetailsJason C. Taylor
Address corrected to E Myrtle
Routing - PUBLIC WORKS3/5/2014 3/5/2014 PASS
DetailsConnie Baumgartner
Plans ACCEPTED BY PLAN TECH  3/4/2014 DONE
DetailsChristina Prado
Intake Approval  3/4/2014 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  3/4/2014 DONE
DetailsChristina Prado
Pending Assignment by JCM3/4/2014 3/4/2014 DONE
DetailsJohn Menard
Application received  2/10/2014 DONE
Application submitted via PDS Online on Feb 10 2014 3:52PM