Permanent Occupancy | | | 8/1/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 7/30/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Jim Sly
|
|
|
Gary Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/30/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | NR |
Mike Jordan
|
|
|
Gary Phone #: ###-####. Fire/life/asfety inspection failed.
|
FIRE-Final Inspection | 7/24/2014 | 7/24/2014 | 7/24/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide sticker at the main exit. Provide automatic flush bolts at the main exit inactive leaf or remove the door hardware. Resumbit an accurate floor plan that includes the entire tenant space and the upstirs office. This tenant occupies two separate addresses.
|
Issue PAID IN FULL permit | | | 7/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 2/11/2014 | 2/20/2014 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 2/11/2014 | 2/11/2014 | 2/20/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/11/2014 | | 2/20/2014 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/20/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/20/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/20/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 2/20/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/20/2014 | | DONE |
Tisha Gallop
|
|
|
called Gary and left mssg permit is ready.
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/11/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 8/11/2014 | | | |
|
|
|
|