Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00304
StatusFinaled
Name STEED CONSTRUCTION
Site Address 4719 S MARKET ST
Project NameCRAIG STEIN BEVERAGE
Customer Number 
ePlanReviewYes
Description
(CRAIG STEIN BEVERAGE - EXPANSION INTO ADJACENT AREA) Fire sprinklers used for building area increase. To expand an existing 77,565 square foot warehouse tenant space into an adjacent 33,797 square foot area. After the expansion, this warehouse tenant space will have a total floor area of about 111,362 square feet. Work is to include new wall and roof insulation, a restroom accessible to the disabled, interior nonbearing walls, and finishes. A separate racking permit is required for racks more than 8 feet tall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Battery-charging areas for equipment shall comply with the 2012 IFC. Ventilation shall be provided in an approved manner to prevent a dangerous accumulation of flammable gases. The fire sprinkler system is required to comply with NFPA 13 and the approved code modification as regulated by the Fire Department. The structural analysis confirming the ability of the roof to support the added HVAC units and the design for any required structural changes are deferred submittal items. The analysis and design shall be submitted to the Plan Review Division for review. Changes shall NOT be done to the roof structure and the HVAC units shall NOT be placed on the roof until the structural analysis, and any required structural changes, are approved by the Plan Review Division of the PDS Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/11/2014 DONE
DetailsChristina Prado
Second Notice 6/20/20147/9/2014 DONE
First Notice 5/23/20146/10/2014 DONE
Faxed 6-10-14
Permanent Occupancy  5/13/2014 DONE
DetailsChristina Prado
BLD-Final5/12/20145/12/20145/12/2014PPASS
DetailsMike Jordan
Odie Phone #: ###-####. ok for perm. occ.
FIRE-Final Inspection5/7/20145/8/20145/9/2014APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
Issue & PRINT permit  5/8/2014 DONE
BLD-Framing/Rough-in4/7/20144/8/20144/8/2014APASS
DetailsTom Arcoraci
Odie Phone #: ###-####
Routing - PLAN CHECK4/4/2014 4/8/2014 PASS
DetailsCarl Westfall
Reviewed the structural analysis of the roof and its ability to support the addedd roof top HVAC units. Added "red lines" to a drawing within structural calculations.
PLANS/APPL TAKEN TO FRONT DESK  4/8/2014 DONE
Plan resubmittals received  4/4/2014 DONE
Deferred submittal received for the roof structure analysis
Issue PAID IN FULL permit  3/31/2014 DONE
DetailsChristina Prado
Print Occupancy Form  3/31/2014 DONE
DetailsChristina Prado
OVERRIDE  3/28/2014  
Plan assigned to (CJW)2/18/20142/18/20143/28/2014 PASS
DetailsCarl Westfall
CRAIG STEIN BEVERAGE - Level 3 TI - ePlanReview (20 days - March 13)
Routing - PLAN CHECK3/26/2014 3/28/2014 PASS
DetailsCarl Westfall
Drawings approved with "red lines".
PLANS/APPL TAKEN TO FRONT DESK  3/28/2014 DONE
Permit Ready to Issue  3/28/2014 DONE
DetailsChristina Prado
Plan resubmittals received  3/26/2014 DONE
Routing Off Site - C.D.H  3/26/2014 PASS
Not routed the 1st time. Waiting to determine for sure whether it is a regulated facility.

(3-26-14) According to Tammie McCarter, this facility is not regulated by CDHD.
Telephone call  3/14/2014 DONE
Left a message for Wes Steele. Asked for status update.
1st review completed  3/3/2014 DONE
Failed Building
Plan resubmittals requested  3/3/2014 DONE
Routing - PLAN CHECK2/18/2014 3/3/2014 FAIL
DetailsCarl Westfall
Resubmittals required
Routing - FIRE2/18/20142/18/20142/28/2014 PASS
DetailsScott Arellano
See attached Review
Routing PW Sewer Rating2/20/2014 2/20/2014 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS2/20/2014 2/20/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment2/18/2014 2/19/2014 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Steed Construction needs to designate an RP for project.
Pending Assignment by JCB2/18/2014 2/18/2014 DONE
DetailsJason Blais
Routing - PUBLIC WORKS2/18/2014 2/18/2014 PASS
DetailsEmily Dixon
Routing - Addressing2/18/2014 2/18/2014 PASS
DetailsEmily Dixon
Intake Approval  2/14/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Application received  2/12/2014 DONE
Application submitted via PDS Online on Feb 12 2014 11:40AM